HomeMy WebLinkAboutCorrespondence
Tracking sllmlllary
e
e
C~O~;f? v\/ir1(j(J\\j
Print
Summary Results
Single piece shipments
Tracidng number Status Da.te/Tirnn DostinaUon Servico
.aSO ~.11_~4~;?Z:l Delivered Feb 25, 200S 2:35 PM INDIANAPOLIS, IN F edEx E::<pres8
85..09178.45.5.63 Delivered Feb 25, 2005 1 :38 PM INDIANAPOLIS, IN F edEx Expres:s:
8.5o.~.1.7.a4.5..5..4.1 Del ivered Feb 25, 2005 1 :02 PM INDIANAPOLIS, IN F edE>:: Express
8~lL9_1Z8A.5}2J.9 Del ivered Feb 25, 2005 1 :51 PM INDIANAPOLIS, IN F edE:x: Expre:s:s
B5Q91Z~4.Q_5_4Q Delivered Feb 25, 2005 12: 16 PM INDIANAPOLIS, IN F edEx Express
850917845552 Del ivered Feb 25, 2005 2:06 PM INDIANAPOLIS, IN F edEx E>::pre:~:s
850917845508 Delivered Feb 25,2005 11 :19 AM INDIANAPOLIS, IN F edE::< Expre:s::s:
85091784544~ Del ivered Feb 25, 2005 2:42 PM INDIANAPOLIS, IN F edEx E>::pre:s::s:
~~Q.~1.Z~A134~L~ Delivered Feb 25, 2005 11 :26 AM INDIANAPOLIS, IN F edE::( Expres:::::
85.0.9.17$.4.5..4.7.1. Delivered Feb 25,2005 11 :50 AM INDIANAPOLIS, IN F edEx Expre:~::;:
S.5..o.~.lZ8454J_B Delivered Feb 25, 2005 12:46 PM INDIANAPOLIS, IN F edEx Expre:s:::;:
a50~_L7J14Q1.0_5 Delivered Feb 25, 2005 1 :39 PM INDIANAPOLIS, IN F edEx Express:
~:t~iQ.~l.8_4.Q~2Z Del ivered Feb 25, 2005 11 :45 AM INDIANAPOLIS, IN F ec~Ex Expre:s:s:
850917845438 Del ivered Feb 25, 2005 11 :22 AM INDIANAPOLIS, IN F edEx Expre:S:5:
850917845530 Delivered Feb 25, 2005 11 :25 AM INDIANAPOLIS, IN F edEx Express
aS0917845.1l2.Q. Del ivered Feb 25,2005 12:15 PM INDIANAPOLIS, IN F edEx Expre::::::::
~Q.Q.~.lZ..a~~lB.4_~.Q Del ivered Feb 25, 2005 8:23 AM INDIANAPOLIS, IN F edE>:: Express
G. ,~, ~~~. ~ .~~
http:// \^./ \\1 \\1 . fe de x . C 0 ln/T rac kin g ? ac t] (Tn =tr a c k &
Page 1 of 1
~\)~
3/ 1/2005
e
e
Current Water Sanitary Sewer Connection Fees
Our Utility Ordinance lists an average user factor of 0.5 EDUs/lOOO ft2 for an office classification,
which would be applicable to bank facilities. On the plans submitted, the building square footage is
listed as 4,134 ft.2 Prototype with a 2,079 ft,2 canopy. Does this indicate the total square footage for
just the building without the canopy as 2.055 ft,2? If this is the correct building square footage, Water
and Sanitary Sewer Connection Fees would be calculated as:
Water - 2,055 ft,2 @ 0.5 EDUs/lOOO ft.2 = 1.028 EDUs @ $1,3l0.00/EDU = $1,347.00
Sanitary Sewers. - 2.055 ft.2 ({j) 0.5 EDUs/lOOO ft.2 = 1.028 EDUs ({j) $ 795.00/EDU = $ 817.00
Totals 2,005 ft.2 1.028 EDUs @ $2,105.00/EDU = $ 2,164.00
5. TAC Review/Drawings submitted for approval:
\Ve request that all comments and comment letters generated by this office be answered in writing and
be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. The design engineer must certify all drawings
submitted for final approval. This office \vill require a minimum of five-sets of approved drawings
after all issues have been resolved and the construction drawings have been approved. The drawings
will be stamped approved and signed by the City Engineer and by the Director of Carmel Utilities.
The Developer/Owner will receive one-set which is to be maintained on the construction site at all
times. Carmel Utilities will receive t\vo-sets, Our Construction Manager will receive one-set and one-
set \vill be maintained in the Department of Engineering. If more than the minimum five-sets are
requested to be approved, the additional sets (maximum total of two additional) must be submitted
with the five required sets.
6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of
way and/or dedicated easements will require a Consent to Encroach Agreement between the
O\\rner/Developer and the City of Carmel. This Agreement requires Board of Public Works and Safety
approval.
7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water
and sanitary sewer main locations.
8. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues.
9. I am including copies of the following with this correspondence:
· Commercial Project Approval Procedures.
· Permit Data, Contacts, etc.
· Commercial Permitting Procedures.
· Current Utility Fee Schedules
BONDING REQUIREMENTS
1 O. The following bonding requirements may apply to this project:
Performance Guarantees
It does not appear Performance and Maintenance Guarantees will be required.
Street CutlRight of'Vay Permit and Bonding Requirements
Any work in dedicated right of way of Hazel Dell Parkway will require a Right of Way Permit and a
License and Permit Bond. The bond amount will be determined by the number of instances of work in
the right of way (c9mmercial curb cuts, storm sewer work, etc.) @ $2,000.00 per instance. Ooen
paVel11ent cuts in dedicated streets require approval bv our Board of Public Works and Safetv. It
appears that there is at least one instance applicable to this project, namely from storm structure Al to
the existing structure in the right of way. Please contact Fred Glaser, Department of Engineering Right
of Way Inspector/Manager for details regarding this issue.
CONSTRUCTION PLAN COMMENTS
11. Please make subsequent submittals on 24" x 36" plan sheets.
12. Sheet SD 1 - Site Plan
· Please confirm that existing street is private.
· Please confirm that on-site storm sewer will be private.
· Please confirm that all Thoroughfare Plan right-of-way has been dedicated.
· Please confirm that regional/master-planned detention has been provided off-site.
Conn, Angelina V
-
e
From:
Sent:
To:
Cc:
Conn, Angelina V
Thursday, February 24, 2005 12:30 PM
Babbitt, Pamela A; 'TPreble@GPDGroup.com'
Morrissey, Phyllis G; Pattyn, Dawn E; Tingley, Connie S; Hollibaugh, Mike P; Keeling, Adrienne
M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Dobosiewicz, Jon C; Pohlman, Jesse
M; Mindham, Daren; Griffin, Matt L
Docket No. Assignment: (DP/ADLS) Riverview Medical Park, Lot 3 - Fifth Third Bank (#
05020033 DP/ADLS)
Subject:
Pam,
I have faxed/e-mailed the petitioner and updated the file. I have issued the necessary Docket Number for (DP/ ADLS)
Riverview Medical Park, Lot 3 - Fifth Third Bank. It will be the following:
Docket No. 05020033 DP/ADLS
$772.50 + $772.50 + ($103*1.9 acres) =$1,740.70
Total Fee: $1,740.70
Docket No. 05020033 DP/ADLS: Riverview Medical Park, Lot 3 - Fifth Third Bank
The applicant proposes to construct a building with parking and landscaping.
The site is located at the southeast comer of 146th St. and Hazel Dell Pkwy.
The site is zoned PUD/Planned Unit Development.
Filed bv Traci Preble of GPD Associates.
Petitioner, please note the following:
1. This Item has been placed on the March 16 agenda of the Technical Advisory Committee. The deadline for TAC
filing to all T AC members is March 1.
2. Mailed and Published Public Notice needs to occur no later than Friday, March 25. Published notice is required
within the Indianapolis Star.
3. Proof of Notice will need to be received by this Department no later than Noon, Friday, April 15. Failure to submit
Proof of Notice by this time will result in the tabling of the petition.
4. The Filing Fee and Fifteen (15) Informational Packets must be delivered to Plan Commission Secretary Ramona
Hancock no later than Noon, Friday, April 8. Failure to submit Informational Packets by this time will result in the tabling
of the petition to the Tuesday, May 17, agenda of the Plan Commission.
5. The Item will appear on the April 19, 2005 agenda of the Plan Commission under (Public Hearings).
6. The Item will also appear on the Tuesday, May 3, agenda of the Plan Commission Special Studies Committee.
PETITIONER: refer to your instruction sheet for more detail.
Please contact Ms. Preble at 299-2996 (Fax: 293-1331 or e-mail: TPreble@GPDGroup.com) with this information. Once
the file is updated please return it to Jon's office.
Thank you,
Angie
Post-it@ Fax Note 7671
To TYac i p"e hie.
Co./Dept. PO A 5~ 0 c.
Co.
# of ~ J
pages
ie eo-nn
o~ Calm
Phone #
Phone #
Fax #
> Fax # -z.,<t ~ - 1 ~ ~ (
1