HomeMy WebLinkAboutCorrespondence tla e e Norman John Kerr, Jr. 13595 Kensington Place Carmel, IN 46032 Managing Partner of Kensington Partners DOCS History of Kensington Place: Originally Plated for 22 Lots The first builder built 7 townhomes. He is since deceased. Kensington Partners bought the balance of the lots to maintain the Georgian architecture. In October 2000 Kensington Partners requested before the CarmeVClay Plan Commission a reduction of 22 lots to 19 lots to allow for more green space. Kensington Partners has built 9 townhomes and has 3 vacant lots for building. Comments of Disapproval regarding the Proposed Draft Ordinance dated 18 February 2005 for Jackson Square. The 2nd "WHEREAS" (lines 12-14 of the Proposed Ordinance) is objectionable in that the "Commission" needs to thoroughly review and amend in detail the proposal and it should not be forwarded to the Common Council of the City of Carmel, Indiana with a favorable recommendation as presented. The paragraph starting "NOW, THEREFORE, BE IT ORDAINED" (lines 16-23) should not be approved in that (a) this proposed ordinance should not be used in establishing a Planned Unit Development District with a residential provision, (b) existing ordinances or laws of The City of Carmel, Indiana shall be observed for the property in question and not overridden and/or eliminated as proposed in the draft, (c) Chapter 23-B of the Carmel Zoning Ordinance, as amended, which is the U.S. Highway 31 Corridor Overlay Zone shall apply to the development of the subject property. The present B-6 Zone within the U.S. 31 Overlay Zone with the previously agreed exclusions and buffering should apply to this parcel, which was committed for the future development to conform to the U.S. 31 Overlay Zone. Completion of what is already established, as an office park for this parcel is consistent with the intent that it would provide for the necessary health, safety and welfare of the adjacent residential neighborhoods. The balance of the proposed ordinance attempts to completely override and/or eliminate, (1), the Meridian Corridor Overlay, CarmeVClay Zoning Ordinance, Chapter 23B, titled U.S. Highway 31 Corridor Overlay Zone, (2), Carmel/Clay Zoning Ordinance, Chapter 17, titled B-6, Business District, and (3) the commitments made in Docket No. 40-90Z which were approved by the Carmel Plan Commission by a vote of 12 to 0 in 1990. The preservation of these commitments is most dear to the residents of Kensington Place. Any deviation from those commitments as outlined in the memo previously submitted to the Carmel Plan Commission is of grave concern to the residents of Kensington Place. e e as though it were within the U.S. 31 Overlay Zone or the Meridian Corridor. Inaddition the petitioner, by way of commitment, have (has) excluded certain permitted and special uses typically allowed in the B-6 District, from Parcel #2." "The petitioner is also willing to limit the height of buildings with Parcel #2 to four stories or 50', the lesser of (tape: 115)??????" . "Mr. Nelson stated that the petitioner was committing to a tree preservation program in conjunction with substantial greenbelt areas." The "substantial greenbelt area" was established to be 50 feet to the west and south boundaries of Kensington Place, which designation has been recorded. "As for Parcels #1 and 2 except for necessary clearing for the installation of roads, parking areas and the building, all trees greater than 1 0" in .diameter will be retained. " . CARMEL PLANNING COMMISSION MINUTES - July 17~ 1990 - Docket No. 40-90Z Mr. Houck asked about the buffer. area adjoining the road cut on Smokey Row Road, the green belt area to the east of that road, what is the depth of that buffer? For parcel 2 where would the likely place be for a building? Mr. Houck also has a concern of the protection of the residents in Kensington Place. Is there a plan to preserve the ,vegetation in the green belt area or will it be cut down?" CARMEL/CLAY PLAN COMMISSION SPECIAL S~rUDY COMMITTEE JULY 5~ 1994 "At the time offuture development, no storm water from Parcel 2 (Pro-Med) shall be allowed to drain across Kensington Place. " "At the time of rezone, a tree preservation easement was committed to by Pro-Med in the area adjacent to Kensington Place on the west and on the south. There is a 30 foot landscape buffer required; the petitioner has provided n)r a 50 foot landscape buffer adjacent to Kensington Place, and a building setback lirLe of 60 feet; no building will be located within the buffer area. " "Ron Houck also questioned the drainage towards Kensington Place. Mr. Huffman responded that the drainage flowed from northwest to the southeast. There are currently smaller valleys that do drain across Kensington Place; hlowever, it is the intention to install infrastructure to accommodate future development; plans do call for a storm sewer 24 inches in diameter to catch water and pipe to the pond, and any additional water east of this point that goes onto Kensington Place will need to be addressed at future development. " Based on the commitments made in 1990, the office park on ProMed Drive has developed in a quiet and harmonious manner. Likewise, Kensington Place has developed in a serene and peaceful manner. Sixteen homeowners have either contracted for or purchased already constructed.town homes based on the commitment made at the time of the 1990 rezone that to the west and south there is a recorded 50 foot buffer zone that e e provides that no tree over 6" diameter shall be disturbed. Also, those purchasing in Kensington Place have understood that the Pro Med property is zoned for offices consistent with the U.S. Highway 31 Corridor Overlay Zone, since the commitment was made at the time of the rezone to B-6 that all of Parcel #2 (that parcel which is up for your consideration now) shall be deemed as in the U.S. Highway 31 Corridor Overlay Zone. The City of Carmel had cause to review the specific criteria for Kensington Place in 2001 and approved criteria for 50% - 60% allowable coverage on each lot. The visual aesthetics of criteria for Kensington Place is plain for all to see. There are three lots yet to be built which will finish out Kensington Place with 19 town homes on a total of four acres. The original approval of Kensington Place was for 22 lots. The adjustment to 19 lots was self-imposed by the current owner, my husband, John Kerr, to dissolve any appearance of congestion and to make way for guest parking In April 2005 comes a project before you proposing to change all the commitments made in 1990. The plan calls for an office building which none of the Kensington Place residents oppose because that was the commitment made and therefore expected. In addition there are proposed 38 town houses on 4.47 acres with what appears to be a narrower private street. There is unanimous objection on the part of every Kensington Place property owner to the 38 town houses on 4.47 acres, which shows a reduced buffer, previously committed and recorded in 1990. Additionally, the concern is that the Meridian Corridor Overlay Zone calls for "consistent and coordinated treatment of the properties borderingU. S. Highway 31. " The Code continues on to read: "U. S. Highway 31 Corridor is a premier office location and employment center whose viability, quality, and character are important to the community as a whole, adjacent residents, employees, business owners, and taxing districts. "The code also speaks to "development consistent with the Corridor's existing and planned uses." Think of how the Meridian Corridor flows with the careful placement of the major office structures. Now review the placement of the office structure proposed in this project. It does not have a consistent relationship to the Meridian Corridor, as do all the other office structures along the corridor. Is that because the desire is to squeeze every every inch out of the land that is there? Consistency is important as the corridor nears completion. Your attention to that detail is invited. If you do not hear our plea and cry.to maintain the office park as previously committed, Kensington Place owners request that if the Jackson Square project is considered single family or multi-family in nature that the B-6 Minimum Lot Size be adhered to or as a minimum, the. standards imposed upon Kensington Place regarding percentage of lot size developed be adhered to, which would reduce the number of units built in Jackson Square by a significant number. It is appropriate to bring to your attention that the intersection of Smokey Row with Old Meridian is not in the best interest of the health, safety and welfare of those who travel e e that way frequently. Especially in the dark of the night, for those who are not accustomed to the intersection, it is very dangerous. Adding 38- 7 6 more cars exiting or entering ProMed Drive where other cars are coming around the curve, requires your serious consideration since you are charged with the health, safety and welfare of the community. Office workers normally come and go during daylight hours. This is the preference of the residents of Kensington Place. Residents of a dwelling are most frequently home at night with their lights on and truly changing a wooded picture, which often includes deer, birds and other wild life. Additional questions arise that are of concern: How will the runoff flow to avoid flooding Kensington Place since there is a severe topography drop from Pro Med Drive to Kensington Place? Will the new construction require additional evergreen trees of significant size to further buffer Kensington Place from whatever structures are built and from the lighting? If construction requires compacted soils to be brought in for fill, will there be careful monitoring to meet required standards to avoid collapse in the event of a heavy 100-year rain? Is profit or income the primary focus of all petition decisions? Please review the attached letter from Walter G. Justice dated November 24, 2004, where he states, "I believe the ultimate decision the homeowners need to make has to do with either wanting to see residential properties to their West or commercial. Weare in a situation where unlike most zoning matters that I experience, we really don't have a preference. If the property is to be developed in its entirety with office buildings, then we will go along with whatever the City of Carmel suggests in terms of layout, but subject to the usage and density which the property allows for under the existing zoning as we know it. II Plan Commission Members, Mr. Justice says it all here; this application rests in your hands. Kensington Place homeowners have been and are aware and are receptive to the final development of the office park. Is there any real reason why the commitments of 1990 cannot be lived up to? More recently, I attended all of the meetings (public hearing, committee meetings, final vote, etc. in 2004/2005) for the Brenwick Village of West Clay application. There were primarily two citizens in opposition. They lived approximately 1/2 mile and 1 mile away, respectively. Their opposition was that the proposed changes would affect their quality of life. There were significant adjustments to that application as a result of those two opponents who lived a significant distance from the project. Your attention is sincerely requested when the quality of life will be affected for the residents of Kensington Place who live 50 feet away. Will your passion for fairness be demonstrated? Respectfully, r. . . ~~~~ m::: Virginia Kerr 4/13/05 e e ~ Advisory Conzmittee. All written requests to be placed on the Board's agenda nlust include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or the Board of Zoning Appeals (if applicable). 4. T.A.C. ReviewlDrawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all Engineering Department and Carmel Utilities issues have been resolved. The design engineer must certify all drawings submitted for final approval. We will require a minimum of five-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and \vill be signed by the City Engineer and by the Director of Carmel Utilities. One set will be distributed to the OwnerlDeveloper to be maintained on the construction site. Two sets will be retained by the Engineering Department and two-sets will be distributed to Carmel Utilities. If more than one approved/signed set is desired, we will approve a maximum of two additional sets for a total of seven sets. However, the additional sets must be submitted with the required five sets. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of ,yay or dedicated easements will require a Consent to Encroach Agreement with the City of Carmel's Board of Public Works and Safety. 6. Carmel Utilities/W ateI' Distribution/W astewater Collection should be provided copies of all drawings and revisions for review of sanitary sewer issues. They will provide a separate review regarding these issues. 7. Camlel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water and sanitary sewer locations. 8. Weare enclosing copies of the following information for your use: . Commercial Project Approval Procedures . Performance Release Procedure . Building Permits . Permit Data, Contacts, etc. BONDING REQUIREMENTS 9. Upon initial revie\v, it appears the following bonding requirements may apply to this project: Performance Guarantees/Engineer's Estimates Individual Performance Guarantees will be required for the following subdivision improvements: . Right of Way Improvements, to include 3-curb cuts and emergency access. . Water Mains . Sanitary Sewers . Sidewalks/Asphalt Path within dedicated right of way It is our assumption that the storm sewers/storm drainage system will be privately owned and maintained. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineers Estimates for each improvement including unit costs, quantities, materials and types of materials, etc. Upon completion and release of individual Performance Guarantees, a three-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other inlprovements. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please reference the enclosures for more detailed explanation of our procedures. Right of\Vay Permit and Bonding Any work in the dedicated right of way of Pro Med Lane andlor Smokey Row Road will require a Right of Way Permit. If the \vork is included in the scope of work of a posted Performance Guarantee, no additional bonding will be required. If it is not included, a License & Permit type Right of Way bond will be required in the amount of$2,000.00 per instance of work in the right of e e way. Any open cut in the pavement of Pro ~led Lane or Smokey Ro,v Road ,viII require separate Board of Public \Vorks and Safety approval. 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for revie\v. We will share Crossroad's conunents as they are received. When construction plans are submitted for review for this development, please provide 2-sets of plans and calculations to allow us to send the extra set to Crossroad to save some time in the review process. -t AVAILABILITY AND CONNECTION FEES 11. Water and Sanitary Sewer Availability (acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to the start of construction activities. Availability Fees are based upon total legal description acreage for the development at the current rate of$1,365.00 per acre (Sanitary Sewer Availability Fee). Based upon the legal description on Sheet C 1.0, the following Availability Fees would apply: Water - 7.298 Acres @ $1,010.00/ Acre = $ 7,371.00 Sanitary Sewers -7.298 Acres @ $1~365.00(Acre = $ 9~962.00 Total 7.298 Acres @ $2,375.00/Acre = $17,333.00 'Vater and Sanitary Se,ver Connection Fees are currently $1,310.00 and $795.00 per EDU respectively. Connection Fees are paid \vhen the infrastructure has been completed, satisfactory test results obtained and the development has been released for building permits. Based on information on the drawings, the following are tentative Connection Fees for this project: Office Building - 30,000 ft.2 @ 0.5 EDUs/1000 ft.2 = 15.0 EDUs @ Water - 15.0 EDUs @ $1,310.00 Water Connection Fee/EDU = $19,650.00 Sanitary Sewers - 15.0 ED Us (if) $ 795.00 Sanitary Se\ver Connection Fee/EDU = $11~925.00 Total 15.0 EDUs @ $2,105.00 $31,575.00 Townhomes - 38 Total Units @ 87.0 gallons/day/unit = 3,306 gallons/day + 300 gallons/day/EDU = 11.02 EDUs Water - 11.02 EDUs @ $1,310.00 Water Connection Fee/EDU = $14,436.00 Sanitary Sewers - 11.02 ED Us @ $ 795.00 Sanitary Sewer Connection Fee/EDU = $ 8~761.00 Total 11.02 EDUs @ $2,105.00 $23,197.00 . If an irrigation systenl, swim nl ing pool or clubhouse is planned for this development, additional Water and Sanitary Sewer Connection Fees may be assessed based upon the reconlnlendation of the Director of Carnlel Utilities. PRELIMINARY DEVELOPMENT PLAN COMMENTS 12. Please make subsequent submittals on 24" x 36" plan sheets. 13. Concrete sidewalks in dedicated right of way are required to be 5'0" wide. The asphalt path width must conform to current City of Carmel standards. We defer to the Department of Community Services for this determination. - 14. Utility Easements will be required for water mains and sanitary sewers, particularly in the townhome area, which is served by private streets. 15. The Department understands that Pro- Med Lane is a public street. 16. Is a total of three curb cuts being requested? 17. The Department suggests that the intersection be reconfigured in accordance with the attached sketch. This more or less entails removal of the "bulb" and aligning the intersection roadways and access drives to be perpendicular. See attached sketch and call to discuss. 18. Please provide drainage calculations for the construction drawing submittal. 19. The City recommends that all private streets be constructed to City standards to facilitate future dedication. These standards include: · Sub-surface drain under the curbing on each side of the roadway meeting the . Department's standard detail. · The plan should accommodate a future 50-foot right-of-way to include the street and any sidewalks and the pavement width should be a minimum of 30 feet. e e ... . The pavement face curb-to- face curb width should be 40-feet for parking on both sides or 32-feet for parking on one side only. . Please continue curb and gutter to the limits of the on-street parking spaces at intersections. This would require locating the curb and gutter out 8-feet (or as required) at each intersection. . Locate any sanitary or storm manholes (except inlets) and valve boxes outside of street pavement, sidewalks or curbing and add a note to this effect. . Installation of water mains, water service laterals, sanitary mains and sanitary service laterals under private streets conform with the requirements outlined in Item No.: 18 of this comment letter. . The sidewalk and curbing are installed to the Department's standard details. · Installation of storm sewers under private streets conform with the requirements outlined in Item No.: 21 of this comment letter. · The pavement be installed with a normal crown with inlets on each side. In most cases, the storm piping is already in place for the installation of a curb inlet or would require a short extension of the proposed piping. 20. Any future detailed design efforts in the development of the construction plans and the construction plans themselves as it relates to plan content, shall conform to the following: The Department requests that any general or plan notes, details, or specifications be revised or added to appropriate sheets to accommodate the following requirement for installation within existing and proposed City right-of-way: "Bedding, haunching and initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final backfill for water nlains, water service laterals, sanitary mains and sanitary service laterals under and within 5-feet of pavement (including sidewalks) shall be B-Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6- inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6-inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern." and that these installations conform with the following minimum cover requirements: "For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the paven1ent section thickness (all bituminous and aggregate material above the subgrade) plus 1-0". If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern." 21. Any future detailed design efforts in the development of the construction plans and the construction plans themselves as it relates to plan content, shall conform to the following: The Department requests that any general or plan notes, details, or specifications be revised or added to appropriate sheets to accommodate the following requirement for installation within existing and proposed City right-of-way. The Department assumes that the storm system will be a private system, but recommends that the entire storm system be constructed to meet the following requirements to facilitate future acceptance by the City: "Bedding, haunching, and initial backfill for all RCP installations shall be B-Borrow for Structure Backfill meeting the material requirements of the INDOT. Bedding shall be placed in the trench bottom such that after the pipe is installed to grade and line, there remains a 4-inch minimum depth of material below the pipe barrel and a minimum of 3-inches below the bell. For pipe sizes 66-inches and larger, the minimum depth of material below the pipe barrel shall be 6-inches. Bedding shall be placed to be uniform as possible, but shall be loosely placed uncompacted material under the middle third of the pipe prior to placement of the pipe. Haunching and initial backfill shall be compacted in 8-inch maximum lifts to not less than 90% Standard Proctor Density for the entire depth of the material placed. The backfill shall be brought up evenly on both sides of the pipe for the full length of the ~ ,. ,"& e e NATURAL RESOURCES PLAN REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at .ohn-south Project Name- Jackson Square Preliminary Plan Location- Sec. 25 T-18N R-3E Acreage- 7.3 ac Owner/Developer- Justice Home Builders 1398 N. Shadeland Avenue Indianapolis, IN 46219 Engineer- Mr. Richard Kelly EMH&T Engineers 6994 Hillsdale Court Indianapolis, IN 46250 Plan Review Date: March 23, 2005 Soils Information: HeF Hennepin loam, 18 to 50 percent This is a well drained soil with a water table at a depth greater than 40 inches. This soil is located on steep breaks along till plains; slopes are 18 to 50 percent. The native vegetation is hardwood forest. The surface layer is loam and has moderately low to moderate organic matter content (1.0 to 4.0 percent). Permeability is slow (.06 to 0.2 in/hr) in the most restrictive layer above 60 inches. Available water capacity is low (3.2 inches in the upper 60 inches). The pH of the surface layer in non-limed areas is 6.1 to 8.4. Droughtiness and water erosion are management concerns for crop production. This soil is designated highly erodible (class 1) in the Highly Erodible Land (HEL) classification system. MmB2 Miami silt loam, 2 to 6 percent slopes, eroded This is a moderately well drained soil with a seasonal high water table at 2.0 to 3.5 ft. This soil is located on rises on till plains; slopes are 2 to 6 percent. The native vegetation is hardwood forest. The surface layer is silt loam and has moderately low organic matter content (1.0 to 2.0 percent). Permeability is very slow (< 0.06 in/hr) in the most restrictive layer above 60 inches. Available water capacity is moderate (6.1 inches in the upper 60 inches). The pH of the surface layer in non-limed areas is 5.1 to 6.5. Droughtiness and water erosion are management concerns for crop production. This soil is designated potentially highly erodible (class 2) in the Highly Erodible Land (HEL) classification system. MoC3 Miami clay loam, 6 to 12 percent slopes, severely eroded This is a moderately well drained soil with a seasonal high water table at 2.0 to 3.5 ft. This soil is located on sideslopes on till plains; slopes are 6 to 12 percent. The native vegetation is hardwood forest. The surface layer is clay loam and has low organic matter content (0.5 to 1.0 percent). Permeability is very slow (< 0.06 in/hr) in the most restrictive layer above 60 inches. Available water capacity is low (4.5 inches in the upper 60 inches). The pH of the surface layer in non-limed areas is 5.1 to 6.5. Droughtiness and water erosion are management concerns for e e ~ 0 \0 8 8 8 8 0 \C 0'\ 0 00 0 00 \0 U an ~ 0 V') V) 0 0 M,. l'- ~ r--- n ,...... on ~ 00 \On 0" f"'"'t 00 ~ 00 ("l'1 I' 0\ ~ 0 M l' M ~ Cf'l ..q M ('f') M M ~ 0 ~ N 9 ~ ~ Cf.) ~ 0 0 ~ 0 0 0 0 0 0 0 0 0 0 0 0 \0 \0 ..... ('f") N -..r \0 ..,.,n t N" ~ ~ oon 0 v1 ~> ~ 0\ ..... l' tt') .-4 ...... ...... N ..... N ....-4 ~ N f1, ~~ ~ ...... ~ fI'.) PJ CI) CI) -< fI'.) 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 od' v) oon ~ 00" 00 vi i ~ M ('f) M ('t) M M ~ ~ ~ fiJ en ~ bO ~ A -~ ~ en ~ ~ 0 0 0 0 0 0 0 0 ~ ~ ~ 0 0 0 0 0 0 0 0 ~ \0 ~ ..... ('f") C't ~ \C ~ Cf'ln ~ 0'" t'~ v) \0 00 0 00> t' V) C"fl ..... ..... 0\ ~ .q- ~ ...... ~ N N N ~ N "1- 8 OOQ ~ ...... 0' ~~ v;) 0 S~ ~ f.l.4 "'~ ~ ~N ~ ~ CI) ~ ~~ tJ~ CI) 0 -< :.a ~ ~..s ~ fJ) ~~ U ~ 0 0 0 0 0 0 0 0 t' .q- 0 ~~ 0 j 0 0 0 0 ~ 0 0 0 lI") 00 -c ~:> t' N" V\ N C"f') "1. 00 C'i ~ ~ aU ~ ~... .-4 ("t)n M ..... 0\'" ...... 0\ v en UOO ~< .q- ('f) 0 0\ 0\ \0 N V) 0'\ 0 ~C) Z ....... N N ....... ..... ..... N f1, ..... c; U EA EI:t 0 ~ ....... en -< g: ~ ...... ~ fr ~ CI'J (.) ~ ~ ~ >< C/J 0 ~ 0 0 0 0 0 0 0 0 0\ 00 0" (.) ~ ~ 0 0 0 0 0 0 0 0 M ~ IE ~ 0'1 ~ 0\ 0\ 0\ 0\ 0\ 00 00 \0 > M'" 00 v:J' M'" ('f') .. \0'" \(;)'" 0'" to :f 0 0 I < N N N N N N N 00 M rn U ~ ~ ...... {,II} N ...... ~ ~ 0 ~ ...... < ~ = r/) ~ ~ ~ 00 0 00 0 0 r-.. 0 rf") 0\ ~ ~ ...... 00 M \:0 '0 0\ <::> 0\ 0\ 8 0;. ~ '" M t'--", ~ <:> N ..... N N ("'.f N'" ..... N \lS N U ..... Q d ~ g 00 ] en ~ ~ 00 (g 00 an 00 M N ..... \0 l'- N ('t) Ct-. -< M 0'\ V\ ~ 00 Vl V) 0 ~ 0 ~ 0\ ~ ..... 0 ..... ..... 0\ ~ ~ 00 0 00 00 0 0 C"f") tn 0 ..... 0 0 ..... ....... l"- In ci 0 d d d d d d 0 0 ..... ~ ~ d e 0 ....... 0 C> Y"""'4 0 0 ~ ~ f:J 0 0 0 0 0 0 0 ~ ri.i 0 0 0 0 0 0 0 ~ s 00 \Ci r' 00 0\ d U 6 ~ ~ 0 ..... ..... ..... ..... N <C 0 0 0 0 0 <:> 0 r/) 00 I I I I I c! I ~ ~ 0 ~ .q- ~ <ocT ~ ~ ~ fI'.) 0 0 0 0 0 0 ~ I , I , I . I ~ ~ ..... ....... ..... ....... ....... ..... ..... ~ 0 0 0 0 0 0 0 ~ ~ > ~ ~ I I I I I . I an an Va lI") V) Vl lI") <( ~ ~ ~ ~ N ~ ~ ~ ~ I ~ ~ ~ C\ ~ q C\ 0 0 c::r ~ 0 P-t I I I \0 I \C \0 \0 \0 \0 \0 t) ..... ....... ..... ..... ..... ..... ..... ....:J e e o 00 &q. ~ 0'\ r--- l' ~ 0\ J::t.. CI) fiS ~ ~ ~ 0 0 0 0 0 0 0 0 0 0 0\ \0 '..0 00 0'\ ~ 1I1'" 0\'" 0\" 0'\-- ~> ~ \0 00 00 l'- 0\ r--- ~ 00 0'\ ~&1 ~ ....... M" \ti ~ O~ ~ tIJ ~ (-f ~ 8 0 0 0 0 0\ ~ ~ 0 0 0 0 \0 ~ ~> t"- oq- 00 ~ N EA ~ 0" ~l 0" "f:::t " exJ' 0 00 an t"'- o ~ ~< 00 \0 N 00 an 0 EI;) .-e" (".1" 1I1 rn ~ ~ EA) ~ ~ ~ ~ Q ~ 0 0 0 0 0 ....... 0 0 0 0 0 ~~ ~ N N 00 'n ~ CJ ~~ ~.. M'" 00'" V).... ~ b\U 0 ~ ~ 0 M 0 i~ ....... ,..... ....-f 0", ~ ~< ~ ~ ....-I ..... f& ~.q ~ ~@ b gJ~ ~ ~ ~Q I-l ~~ N 0 \0 0'. t"- ...... l1"l 0\ 0 \0 O~ t"-.. ("l 0 ~ t"-- ~ ..... 00'" 00" N" 0" uti) ~(.) ~ r-f ....-f oq- 00 ~ ~ 6' ai 0 ~ ~ CI.) a3 tf) ~ ~ 0 en tIJ ...... ~ 0 ~ ~ N ~ \0 \0 \0 :a ~ ~ C'i ~ 0'\ q ('f') ~ 0 ...... ~ d ,..... -.i- u ~ ...... ...... i rJJ ~ ~ ~ 0 rJJ U ~ s= ~ ;@ r.1 ~~ tI.) .~ V.l Q) V.l ~ ~ ~ 0 ~ r.1 co cu ~ V.l 0 0 0 ~ ~ D:1oo ~ !E lE 0 0 t:1-4tIJ c; ~ ~j 0 0 0 3 (J .... ~ ~ 8 ;.a 0 ~u 0 aJ ~ ~ u u C) ~ ~ ~ ~ ~ ~ 0 0 0 ~ ~ ~ 0 o C1) o CIJ ~] o 0 ~ u ! ~~ ~~ ~~ ~ ~ r/.) 0 9"d OWOCj 0'1j o~ ~ CI.) ...... C1) I 0 ~~ I 0 9~ C?~ 8~ :> ~ ~ I 8 e o e g e o 0 0 @ ~ I~ c:r~ I~ cr~ ~ \no l1"loo In('f'l V"lr--- CI.) ~O\ ~'" ~o ~C\ CZl ~ 0\\0 gj\O ot"- ~\O tI:I ~ 0 tI.) 0 I I I ~ tI.) \.0 \0 \0 U ...... ....-I ..... <