HomeMy WebLinkAboutCorrespondence e e Mr. Mark Settlemyre June 23, 2005 Carmel Office Park-Phase IIIA Page 2 of3 . Are the areas noted as under construction still actually under construction? This comment was raised during previous May 1, 2002 review. . Please indicate limits of construction on all sheets. . Please label width of existing right-of-way~ . Please check with the Department of Community Services if a sidewalk or path is required across 3rd Avenue frontage. . Cannot determine if items 8, 9, 10, and 16 from the September 21,2000 review letter have been incorporated into these drawings. 3. SheetC 1 02 . Do you really desire a sanitary lateral under the pond and a drop manhole in the limits of the pond? . What is represented by the symbol in the northwest comer of3rd Avenue and the entrance? . Please indicate the instrument number of any reference recorded instruments (easements, etc.). 4. Sheet C103 . At the southwest comer of3rd Avenue and Gradle Drive, is it not possible to install a manhole at the pipe junction with an end section stubbed out to drain the ditch and slightly regrade the area over the new manhole? . Is a manhole planned at the northwest comer of3rd Avenue and the entrance? One is shown on the Site Development Plan. A manhole should be installed at this pipe junction and the area regarded to direct water to the curb line or into the ditch to the east. . Note 1 states: "UPSTREAM DRAINAGE MUST BE ACCOMMODATED THROUGH SITE". The Department would expect this to be accommodated in the design not by the Contractor. 5. Sheet C104 Landscape Plan - Please remove landscape plan from plans submitted to Department of Engineering for approval. The Department of Engineering does not approve th.e landscape plan. 6. Please contact Crossroad Engineers to obtain drainage review checklist for consideration in developing the drainage design of this project. These comments represent the Department of Engineering's initial review of the primary plat for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. . Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and .any other governing agency approvals (if required) must be obtained prior to Engineering Department approval.