Loading...
HomeMy WebLinkAbout05100171-Sq. Ft. k. All sidewalks and driveways . Sewer and water ines, sept c system, (tanks & fi ed system) and/or wel locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detent on areas, otc.. ) o Sump pu~p -- Show sump pump pit(s) and discharge line ocations p, Geotherm.al heat p~ump discharge locations · *NOTE: If land is not within a platted subdivision, a legal description is required, CARMEL ZONING ORDINANCE Z-289, SECTION 29,04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance." IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS wOuLD INCLUDE ANY pLAN COMM[SION BOARD OF ZONING APPEALS AND/OR DEPT OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBHITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL~ TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. THE OFFICE oF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS ASA"BONUS ! SPACE, IF AN AREA SO LABELED IS TO BE A FINISHED SPACE, LABELED ACCORDINGLY. IFIT IS TO BECOMEA FINISHED AREA AFI[J==R_.TJH_~ ~ PLANS AND PERMIT RECORDS MUST BE UPDATED ATTHE OFFICE OF BUILDING &