Loading...
HomeMy WebLinkAbout05090074-Site PlanSCHNEIDER ENGINEERING CORPORATION TO CONSTRUC'nON, EXIS1]NC SWALE TO BE THIS PLOT PLAN WAS PREPARED BASI~D ON INFORMATION TAKEN FROM RECORD PLATS, SUBDIVISION CONStrUCTION PLANS, RECORD SANITARY DRA~NGS AND PLANS PROVIDED BY C..LIENT. iT IS THE RE~PONSIBIUTY OF THE CONTRACTOR TO VERIFY SIT~ CONDI~ON$ PRIOR TO CONSq~UCTION AND NOTIFY SCHNEIDER ENGINEERING CORP. AND BRENWICK DEYELOPMENT OF ANY DISCREPANCIES. PROPOSED GRAOE PER SUBDIVISION PLANS EXqSTING GRADE PER TOPOGRAPHY PER RECORD 2 ~N CCNSI'RUCI~Ofl PLANS FIRM BI~'ORE CONSIRuc'n0fl OF WA~ SERVICE UNF- AT D OF EACH DAY. STRAW BAL~S TO BE USED RHERE OF AREA OF WATER TAP TO BE BACKF1LLED VaTH ORAN~LAR MATERIAL TO ¥1aTHIN 10 OF 17.o· - IF CONCRE1E DRIVEWAY.) NO DRIVE SHALL BE PLACED CLOSER THAN 2 FEET TO A LOT UNE EXCEPT WHERE SAID LOT UNE I$ ALSO A STREET RIGHT OF WAY UNE