HomeMy WebLinkAbout05090074-Site PlanSCHNEIDER
ENGINEERING
CORPORATION
TO CONSTRUC'nON,
EXIS1]NC SWALE
TO BE
THIS PLOT PLAN WAS PREPARED
BASI~D ON INFORMATION TAKEN
FROM RECORD PLATS, SUBDIVISION
CONStrUCTION PLANS, RECORD
SANITARY DRA~NGS AND
PLANS PROVIDED BY C..LIENT. iT
IS THE RE~PONSIBIUTY OF THE
CONTRACTOR TO VERIFY SIT~
CONDI~ON$ PRIOR TO CONSq~UCTION
AND NOTIFY SCHNEIDER ENGINEERING
CORP. AND BRENWICK DEYELOPMENT
OF ANY DISCREPANCIES.
PROPOSED GRAOE PER SUBDIVISION PLANS
EXqSTING GRADE PER TOPOGRAPHY
PER RECORD
2
~N CCNSI'RUCI~Ofl PLANS
FIRM BI~'ORE
CONSIRuc'n0fl OF WA~
SERVICE UNF-
AT
D OF EACH DAY.
STRAW BAL~S TO BE USED RHERE
OF
AREA OF WATER TAP TO BE
BACKF1LLED VaTH ORAN~LAR
MATERIAL TO ¥1aTHIN 10 OF
17.o· -
IF CONCRE1E
DRIVEWAY.)
NO DRIVE SHALL BE PLACED CLOSER
THAN 2 FEET TO A LOT UNE EXCEPT
WHERE SAID LOT UNE I$ ALSO A
STREET RIGHT OF WAY UNE