HomeMy WebLinkAboutConstruction Plans 12-12-13
www.nyloplast-us.com
24 IN DRAIN BASIN QUICK SPEC INSTALLATION DETAIL
BUFORD, GA 30518B
PHN (770) 932-2443
3130 VERONA AVEFAX (770) 932-2490
REV
GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II
MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR
THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER
SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED
CONCRETE SLAB DIMENSIONS ARE FOR GUIDELINE
TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, TRAFFIC
PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED
7001-110-192
ACCORDING TO PLANS (6" MIN)
UNIFORMLY IN ACCORDANCE WITH ASTM D2321.
3 VARIABLE SUMP DEPTH
LOADING, & OTHER APPLICABLE DESIGN FACTORS.
DWG NO.
8" MIN THICKNESS GUIDELINE
TITLE
18" MIN WIDTH GUIDELINE 1 OF 1
SHEET
TRAFFIC LOADS:
PROJECT NO./NAME
4" MIN
1:40
MATERIAL
SCALE
4 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212
1 - GRATES/SOLID COVER SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05,
RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS.
3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS.
EBC
CJA
4-3-064-3-06
A
FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC
DRAWN BY
2 - FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05
DWG SIZE
APPD BY
ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-013.
DATEDATE
ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS
NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT
REPRODUCTION OF THIS PRINT OR ANY INFORMATION
OR POSSESSION OF THIS PRINT DOES NOT CONFER,
TRANSFER, OR LICENSE THE USE OF THE DESIGN OR
THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH
ACCORDING TO
5 ADAPTER
CONTAINED HEREIN, OR MANUFACTURE OF ANY
ANGLES
PLANSIS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN
TECHNICAL INFORMATION SHOWN HEREIN
SEE DRAWING NO. 7001-110-065
PERMISSION FROM NYLOPLAST.
MINIMUM PIPE BURIAL
RECOMMENDATION
MANUFACTURER
DEPTH PER PIPE
MATCH BASIN O.D.
1 2 INTEGRATED DUCTILE IRONFRAME & GRATE TO
(CORRUGATED HDPE SHOWN)
(ADS N-12, ADS SINGLE WALL, HANCOR DUAL WALL),
4 WATERTIGHT JOINT
4 VARIOUS TYPES OF INLET & OUTLET ADAPTERSAVAILABLE: 4" - 24" FOR CORRUGATED HDPE
SDR 35, SCH 40 DWV, CORRUGATED & RIBBED PVC
3 VARIABLE INVERT HEIGHTS
AVAILABLE (ACCORDING TO
PLANS/TAKE OFF)
SHALLOW EPS FORMSDEEP EPS FORMS
OVERALL PEDESTRIAN
MATERIALS KEY PLAN
2013.00569
CONSTRUCTION DOCUMENTS
DATE
REHABILITATION &
REVISION SCHEDULE
HARDSCAPE
CARMEL, INDIANA
ASSISTED LIVING ISSUANCE INDEX C210
CERTIFIED BY
DESCRIPTION
PROJECT PHASE:
SHORT STAY
Project Number
FACILITY
12/11/13
DATE:
NO.
60'
Scale 1" = 30'-0"
30'
15'
0
F1.5
W1.1W1.2W1.3W1.4
P2.1
P2.1
F1.5
R1.1
P2.1
P2.1
F1.5
F1.5
F1.5
REFER TO SHEET C211 Refer to Detail 1/C214 for jointing of all concrete walks and plazas
P2.1
P2.1
P2.1
P2.1
F1.5
P2.1P2.2
P1.1P1.2P1.3P1.4
F1.5
N
A
S
T
S
O
C
N
A
S
F1.5
F1.5
MATERIAL LEGEND
F1.1F1.2F1.3F1.4F1.5F1.6F1.7F1.8F1.9
10/28/2013 1:04:16 PM
ENLARGED PEDESTRIANHARDSCAPE MATERIALS
2013.00569
CONSTRUCTION DOCUMENTS
DATE
REHABILITATION &
REVISION SCHEDULE
C211
CARMEL, INDIANA
ASSISTED LIVING ISSUANCE INDEX
KEY PLAN
CERTIFIED BY
DESCRIPTION
PROJECT PHASE:
SHORT STAY
Project Number
FACILITY
12/11/13
DATE:
NO.
20'
F1.5
F1.5
F1.5
Scale 1" = 10'-0"
10'
5'
0
F1.5
P1.1
F1.5
P2.1
P1.1
F1.5
F1.2
P2.2
R1.1
P1.1
F1.5
P1.1
F1.7
F1.6
W1.1
F1.1
P1.4
P1.4
.
P1.1
W1.2
F1.2
W1.1W1.2W1.3W1.4
P1.4
R1.1
F1.7
F1.6
F1.7
P1.1
W1.3
F1.9
F1.9
Refer to Detail 1/C214 for jointing of all concrete walks and plazas
P1.1
W1.3
W1.4W1.4
P1.1
P2.1P2.2
P1.1P1.2P1.3P1.4
F1.1
F1.2
P1.1
P1.1
F1.5F1.5
P1.2
F1.5
MATERIAL LEGEND
P1.3
P1.3
F1.5
F1.1F1.2F1.3F1.4F1.5F1.6F1.7F1.8F1.9
10/28/2013 1:04:16 PM
2013.00569
CONSTRUCTION DOCUMENTS
DATE
OVERALL PLANTING
REHABILITATION &
REVISION SCHEDULE
CARMEL, INDIANA
ASSISTED LIVING ISSUANCE INDEX
L100
CERTIFIED BY
DESCRIPTION
PLAN
SHORT STAY PROJECT PHASE:
Project Number
FACILITY
12/11/13
DATE:
NO.
60'
All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the
judgment of
Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements
(i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule.
Plant
All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation.
The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall
verify
Scale 1" = 30'-0"
30'
15'
0
Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.
Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work.
Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material.
Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information.
S1.1
material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions.
The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted.
S1.1
Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage.
S1.1
Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost.
Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment.
All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance.
In the future, trees adjacent to the 24' emergency drive shall be limbed up to 13'-6" where branches overhang the drive.
depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements)
All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted).
S1.1
Provide a Mow Strip at building edge when lawn is adjacent to building. Refer to Detail 8/L-103.
S1.1
the Landscape Architect, shall be reinstalled at the Contractor's expense.
Trees shall be matched in groups unless otherwise noted.
S1.1
General Landscape & Planting Notes
On-site adjustments may be required.
S1.1
S1.1
10.11.12.13.14.15.16.17.
2.3.4.5.6.7.8.9.
1.
South - 1069 LF: Type A required (min. 5' width; 3 Shade, 2 Ornamental, 9 Shrubs / 100LF)
60+ Trees: Maximum 15% of any one genus or species on site
653.91
653.91
Screen from ROW with 2 Shade Trees and 20 Shrubs / 100LF
12
3
12
22 Ornamental Trees Required and Provided
32 Shade Trees Required and Provided
4
3
1
1
652.94 LP
97 Shrubs Required and Provided
53.40 LP
Species Diversity Requirements:
8
69
7
45
1
0
1
1
Parking:
54.21
54.05
54.13 S1.1
654.34
54.18 BC
54.68 TC
654.24
654.36
54.24 TR
54.20 BC
54.70 TC
54.24
654.38
654.48
54.48
West - 413 LF: Type D required (min. 15' width; 5 Shade, 5 Ornamental, 27 Shrubs / 100LF)
654.40
54.42
52.84 BR
North - 847 LF: Type A required (min. 5' width; 3 Shade, 2 Ornamental, 9 Shrubs / 100LF)
East - 277 LF: Type A required (min. 5' width; 3 Shade, 2 Ornamental, 9 Shrubs / 100LF)
7
.
654.4252.84 BS
3 54.37 TS
52.79
54.42
654.44654.44
52.88 BC
53.38 TC
52.87 BC
53.37 TC52.87 BC
53.37 TC
LANDSCAPE ORDINANCE REQUIREMENTS
J
H
21 Ornamental Trees Required and Provided
17 Ornamental Trees Required and Provided
6 Ornamental Trees Required and Provided
REFER TO SHEET L101
G
54.48
21 Shade Trees Required and Provided26 Shade Trees Required and Provided
9 Shade Trees Required and Provided
F
112 Shrubs Required and Provided
77 Shrubs Required and Provided25 Shrubs Required and Provided
54.25
54.40
54.30
54.23
54.22
54.48
54.27
E
54.42 BW
55.90 TW54.25
54.35 BW
55.90 TW
54.43
54.40 BW
54.20
54.30 BW
55.90 TW
53.98
D
55.90 TW54.35 BW
C 53.95
54.13
54.40
54.18
Zoning: B-3
AB
Buffers:
53.92
53.85
Water Tolerant BMP Plugs, Refer to Specifications
N
A
S
T
S
O
C
N
A
S
Low Mow Seed Mix, Refer to Specifications
Lawn Seed Mix, Refer to Specifications
Seed Mix Legend
10/28/2013 1:04:16 PM
10/28/2013 1:04:16 PM
2013.00569
CONSTRUCTION DOCUMENTS
DATE
PLANTING DETAILS
REHABILITATION &
REVISION SCHEDULE
CARMEL, INDIANA
ASSISTED LIVING
ISSUANCE INDEX
L103
CERTIFIED BY
DESCRIPTION
SHORT STAY PROJECT PHASE:
Project Number
FACILITY
12/11/13
DATE:
NO.
MULTI-STEM TREE PLANTING
dia. ofroot ball
Not to Scale
2"
Water Tolerant BMP Plugs, Refer to Specifications
Low Mow Seed Mix, Refer to Specifications
Lawn Seed Mix, Refer to Specifications
Seed Mix Legend
10/28/2013 1:04:16 PM