HomeMy WebLinkAbout05090149-Sq. Ft. k. All sidewalks and driveways
I. Sewer ana water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump discharge locations
NOTE.-- lrf land is not within a platted subdivision, a legal description is required.
FURTHER NOTES / NOTICES
> CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in ail respects to this ordinance."
IN ADD!T~ON TO THE ABOVE-ITS'FED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
Wl-rH ANY INFORMAT~ON RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THTS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
> ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND VWLL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE riot OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPI TCABLE CODES AND ORDINANCES.
SUBMi-rTAL OF ADDiTiONALLY REQUESTED/REQUiRED INFORMATION, AFTER THE INI'I3AL SUBMITTAL, WILL
EXTEND THE TiME 1T TAKES COMPLETE THE PERMIT REVIEW.
> THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A"BONUS ROOM"TO BE - : i ~ ~PIABLE NFINI HEP_ SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A F~NISHED AREA AFTER THE
ISSUANCE OF THE PERMit, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
INSPECTZON, AND SHOULD NOT BEGTN PPdOR TO THE
PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
OCCUPIED PPdOR TO THE APPROPRIATE [NSPECT~ON. Beginning ~)rior to obtaining
proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BUILDING & COPE ENFORCEMENT; CITY OF CARMEL. One Civic Sq.; Carmel, IN 46052. Ph. (517] 571-2~44~
I, the undersigned, certify that all of the above listed informat on is shown completely and accurately on the
attached plot or site plan(s), construction plans, and any other submitted documentation, submitted with the
building permit application to the City of Carmel / Clay Township Department of Community Services. I further
cert fy that the jd n ng of water supply piping shall be made with lead-free solders and fluxes. Failure to comply
w II r~sult in a rep acement of the syskem. (P umbing Code P-509-5) Under the penalties of Perjury (indiana
Code 35-44-2-z), ! also hereby affirm, under oath, that all of the information ! have provided in the table below is
true and accurate, to the best of my knowledge and belief, and that ! have not knowingly or intentionally
provided or omitted any information that would tend to hide, obscure, or otherwise mislead the Dept. Of
community Services regarding the truth of the matters addressed therein.
Rear
Porch Porch or
Unfinished) Sunroom
\0o
Sq. TOTAL
Ft. of
Garages
DATE
NAME PRINTED
S: Per mits/FORMS/RES][DENTLAL PROCEDURES 2 of 2