Loading...
HomeMy WebLinkAboutFull Set Mechanical.PDF� �': , ----------� ,,.--- ' — — — — — — — — — — — — — — — — — .. � � I; �_—_--� �—_—_—� ,�. � �; L------� �---- ''--J I i�' � _� �—_---� '�, � I, L------� L-----J I � ', ' � i� �------� �---- ',,---� � � �-----J �—_—i—J .�'�. � �I � ' „-� — � i 1 �. �� / v �— i�C /' y _ P :� ._" ' .. UPS y' �.'� �,,' — �.z I � � -?—;— �I "'..� �"�.. 1 `� — C� BUILDING NORTH PARTIA� FLOOR PLAN - DEMOLITION AND NEW WORK SCALE: 7/8° = 1'-0" . ■ I ��� � ���� : �I � � r— I,,, � � I, � � � ■ I',,,, � � I � �I � �I. � J � � i• � � � � I I I L J I' n� �n ' i u� �u i III�� � I j j j j I � r�� � In }, � � � �--._ . f . �------i : /. —' C _i � N � � � Z z � � Q Q � � � � W w W W f/7 � Z y. O � O J �i O � � w W � Z Li W O O Z z O O Q Q � � z z �� 00 U U 0 0 � w Z � _ � � � B A DEMOLITION KEYNOTES: ❑REMOVE SHEET METAL SUPPIY PLENUM AND ASSOqATED DUCT � DISCHARGES AND GRILLES FROM TOP OF EXISTING CRAC-117 UNIT. CRAC-117 UNIT TO REMAIN. ❑z DISCONNECT CRAC-717-1 UNIT POWER WIRING, CONTROL WIRING, REFRIGERANT PIPING, DRAIN PIPING, AND WATER PIPING. REMOVE SHEET METAL SUPPIY PLENUM AND ASSOCIATED GRIILES FROM TOP OF EXISiING CRAC UNIT AND DISCARD PLENUM. RELOCATE CRAC-117-1 UNIi TO ELECTf21C ROOM. REfER TO NEW WORK KEYNOTE �t. �REMOVE EXISTiNG REFRIGERANT PIPING, CONTROL WIRING/CONDUIT, DRAIN PIPING, AND WATER PIPING FROM CRAC-177-1 UNIT BACK TO WALL. ALL TO BE EXTENDED TO RELOCATED CRAC-117-1 UNIT REFER TO NEW WORK KEYNOTES. ❑4 REMOVE DRAIN PIPE FROM CRAC UNIT THROUGH EXTERIOR WAl1. CONTRACTOR TO PATCH WALL TO BE AIR AND WATER TIGHT. PAINT TO MATCH EXISTING. MECHANICAL NEW WORK KEY NOTES: Oi RELOCATE CRAC-177-1 UNIT fROM COLD STORAGE ROOM TO ELECTRIC ROOM AT LOCATION SHOWN. O2 EXTEND REFRIGERANT PIPING [(2) �" RI. AND (2) �/g" RHG] AND �" COLD WATER PIPE FROM WALL TO RELOCATED CRAC-117-1 UNIT. SIZE OF PIPES TO BE VERIFlED IN FlELD. PIPES SHALL BE ROUTED BELOW RAISED FLOOR IN COID STORAGE ROOM. INSULATED COlO WATER PIPE TO MATCH EXISTING INSULATION MATERIAL AND THICKNESS. OPROVIDE NEW CONIROL 1NRE FROM OUTDOOR CONDENSING UNIT TO RELOCATED CRAC-117-t UNIT. ROUTE NEW WIRE IN CONDUIT. O4 PROVIDE 3/q° DRAIN PIPE FROM CRAC-717-1 CONDENSATE PUMP. DRAIN PIPE TO RISE UP WALL 20"t AND ROUiE OVER TO WEST WA�L AND OUT MTO CORRIDOR. ROUTE DRAIN PIPE UNOER RAISED Fl.00R IN CORRIDOR AND iERMINAIE PIPE AT ROOR DRAIN LOCATED IN NORTHWEST CORNER OF E�ECiRIC ROOM. VERIFY PIPE SIZE IN FIELD. O28x28 SUPF'_Y REGISiER SET AT 1500 CFM, (TYPICAL OF 4)_ MOUN f GRILLES A MINIMUM OF 12" BELOW MAIN SUPPIY �UCT AND PROVIDE VOLUME OAMPER IN VERTICAL �ROP. O6 24x24 SUPPLY REGISTER SET Ai 1450 CFM. � i6xi6 TRANSFER OPENING 'MTH GRILLES BOTH SIDFS AND FIRE DAMPER. MOUNT UP HIGH SO AS NOT TO INTERFERE WITH EXISTING ELECTRICAL AND MECHANICAL EQUIPMENT. $ TRANSITION FROM CRAC SUPPLY DISCHARGES INTO ONE 52x18 SUPPLY DUCT. PROVIDE ISOLATION DAMPER IN DUCT. MOUNT DUCT AS HIGH AS POSSIBLE, COORDINATE WITH MAIN WCT (32x30) HEIGHT. O32x30 MAIN SUPPLY DUCT. BDTTOM OF DUCT TO BE LEVEL 'h1TH BOTTOM OF EXISTING DOME LIGHTS. MO�IFY WIDTH AND DEPTH OF DUCT AS REQUIRED TO OBTAIN THIS MOUNTING HEIGHT. DUCT CRO55 SECTIONAL AREA MUST BE E�UAL TO 32x30 CROSS SECTIONAI_ AREA. 70 ROUTE MAIN SUPPLY DUCT NERT TO ERISTING POST. COORDINATE RELOCAiION OF LIGHTS 'MTH E.C.. ii 24x6 SUPPLY REGISTER, BALANCE TO 250 CFM (TIPICAL OF 2). 12 PROVIDE FlRE DAMPER AND ACCESS DOOR IN 14z8 SUPPLY DUCT. 13 DUCT HEATER SHALL ENERGIZE TO MAINTAIN SPACE TEMPERAiURE SE7POINT Of 72' F(ADJ.) KEY PLAN C= BUILOING NORiH Z � w � � :. z � a �� V � L y z � � �� W �y � � R � d o � � � N � 0 3a�� � o� 3n�°� c r � � �v� Noia� —.. , � ` C�.I =� �'� � �' • � .: 1��Y 3:� � � :. �/ � � � � N �I �O a W �m� � ��� W �o� p, ��� � �� z W °z o� � z O �a �C N � � NO. DATE REVISION_ o v-zi-i3 BIDDINCAND CONSTRUCTfON PROJECENUMNER PROJECLDATE: DRAWN BY: CHECICEDBY: $CAI.E: DMS TJS DRAW[NGTITLE PARTIAL FLOOR PLAN - DEMOLITION AND NEW WORK DAAWINCNUMBER '►� O � c� z 3 ¢ � 0 w w � z 0 � a � z � z 0 U O � I w Z J S � � � � � � � �� . I . � � ,�...--------_—�+ � I---�--I �----C-� �� . �---J �----- �� � I II — � r _ _ _ — _ � � '---;J L-----� � � -- - — — :� � ��� �— �------- - � �- --- �i �---J (------� �I' � ■ �__ r a I� � i�.—��������__T � � I4 ��, Cg �_ � �—__—I ��l ' - ,,,� _ , __ . r � � ,. �i ",Z „ _ _ .' , '�` ---- - ' ---------5- 11 �T��) J �'�, ' � � � � \ � 9 �j , � �, I �` � � / I _ _' _ _ \� � / 21 -- L��— _ _ _ _ �. ... ..: i _ _ _, � � 8 � � � � --- , __... __-�-- T �------------------ — L-- i � „ � � � I � � �r,�.� I � � j ,9 j � j „ � � I � i � , (TYP•) � � / _�__ I . ____ . __I _ i __ I ___ T _ � .--- -�- , , 4 _ ' i ��::r:::. �---I --- I---L---- �-� Y I I I J 1 _ - � � � _. / 'w. r�'' �� 26x78 ---- -- — — — '`� ������� `__' .. °� ��y -�'�� � I — i i ^^ � zzx,s �� — �— �•—_ J _ ',. -._..—�pl�-- -- l� PARTIAL FLOOR PLAN - DEMOLITION \- SCALE: 1/8•, = 1•_0" BUILDING NORTH DEMOLITION KEYNOTES: �1 REMOVE EXISTING FAN COIL UNIT. ❑2 REMOVE EXISTING HEATER, GAS PIPING AND FLUE UP 7HRU ROOF. PATCH ROOF TO MATCH EXISTING. ❑3 REA�OVE EXISTiNG AIR COOLED CONDENSING UNIT. �4 REMOVE EXISTING REFRIGERANT PIPING. �5 REMOVE EXISTING DUCTWORK, DIFFUSERS A�.D REGISTERS. �6 REMOVE EXISi1NG GAS PIPING BACK TO MAIN AND CAP OFF. �7 REMOVE EXISTING UNIT HEATER. �8 EXISTING FAN COIL UNIT TO REMAIN. �9 EXISTING UNIT HEATER TO REMAIN. 10 OISCONNECT POWER N7RING, CONTROL WIRING AND REFRIGERANT PIPING FROM AIR COOLED CONDENSING UNIT. RELOCATE UNIT TO PLATFORM A80VE, SEE DRAWING M2. 11 EXISTING DUCTWORK, DIFFUSERS AND REGISiERS TO REMAIN. 12 ExISTING REFRIGERANT PIPING TO REMAIN. 13 EXISiING GAS METER AND/OR PIPING TO REMAIN. 14 REMOVE EXISTING DRAIN PIPE. 15 EXISTING FILTER BOX TO REMAIN. PRONOE NEW FlIiERS. 16 REMOVE EXISTING TiERMOSTAT. 17 ExISTING THERMOSTAT TO REMAIN. 16 REMOVE EXISTING EXHAUST FAN, DUCTWORK, AND REGISTER. 19 REMOVE AND RELOCATE EXISTING DIFNSER. SEE NEW WORK PLAN. 20 CONFlRM EXISTING THERMOSTAT CONTROLS AIR HANDLING UNIT. REMOVf AND RELOCATE TO NEW CORRIDOR 108A. SEE DRA'MNG M2. CONFIRM EXISTING 7HERMOSTAT CONTROLS AIR HANDUNG UNIT. 21 REMOVE AND RELOCATE TO NEW UPS �2 708F. SEE DRAWING M2. ZZ REMOVE AND RELOCATE EXISTING FlLTER BOX TO LOCATION SHOWN ou owc. M2. Z3 REMOVE REFRIGERANT PIPING, CONTROL WIRING AND CONDUIT BACK TO WALL. PIPING AND CONTROL YlRING TO BE EXTENDED TO PLATFORM ABOVE, SEE DRAN7NG M2. 24 REMOVE EXISTING EqUIPMENT RAILS AND PIPE SUPPORT RAILS. KEY PLAN C� BUILDING NORTH �� CG + � z� � b �� � a W � � � � � W � m °� �o� N � N � � 0 �Q�� 3 m�� � ��"° c r °? O � �c°��na � �� ; ,' . ��� �� N �: • � : 1 j ' V V � � � � � � � � M �� a d W ��� � � A z W ��a � �����-I W O Q o� z O � � N � � NO. DATE REViSION a v-zf-�3 SIDDINGAND CONSIRUCIION PRWECTNUMBER: _...�., .,.. PRWECTDATE: _- � nnnmvsv: LGB CHec�DBY: TJS sc.v.e: ... _ _' DRAK7NGITTLE PARTIAL FLOOR PLAN — DEMOLITION DRAWINGNUMBEIt ll� �<' ____�%� � ■ � I • - � ■ � � � � - - - _ - - IL'---- C� • � 36 - I �---- r_ _- _......... ..__ � � 36 � �_--- ■ I�c�-� -- � Exl T REFRIGERANT I PIPING 12-0"t ABOVE GRADE � A M2 ■ � - -_ � - _ � � � MECHANICAL NEW WORK KEY NOTES: --- ._ . _ ----_ _ _ -- "� ���-���� ������ �� T Y TH R IN TA Y M. CONNECT NEW RL AND RS PIPES TO EXISiiNG PIP S AT WALL AND EXTEND UP O1 LIEBERT AIR CONDITIONING UNI FURNISHED B 0 E S S LLED 8 C 20 E MOUNT ON RAISED FLOOR IN DOWNFLOW CONFIGURATION. INSTALLATION SHALL TO PLATFORM ABOVE TO RELOCATED CON�ENSING UNITS. CONTROL WIRING HOTE; NO7' : � BE ON FLOOR STAND WITH NRNING VANES PROVIDED BY OTHERS. MOUN1 IN AND CONDUIT SHALL ALSO BE EXTENDED TO RELOCATED UNITS. REFRIGERANT r OUTIJNE OF EXISTING OURINE OF EXISTING 2" HIGH 20 GAUGE GAlVAN2ED STEEI WELDED CONTAINMENT PAN PROVIDED PIPE SIZES TO BE VERIFIED IN FlELD. , „ PLAiFORM AND (E%ISTING, PLATFORM AND (NEW & . . , ; ...... ... . . . . .. - .-- . --- ---. - 8Y M.C. INCLUDE LEAK DETECTOR IN PAN. SEAI SPACE BEHIND UNIT AND NEW, & FUiURE) ACCU'S FUNRE) ACCU'S ABOVE. � -�� �� �� ���- - ' WALL AT ROOR AS REQUIRED. DIFFUSER, BALANCE TO 350 CfM. CONNECT TO NEW DUCTWORK SAME SIZE AS ABOVE. SEE ROOF PLAN SEE ROOF PLAN ON � '.-- ���� - - �� 2t EXISTING. __ _ _ _ 18 12'0 (FIELD VERIFY) ON OWG M3. DWG. M3. � -- PROVIDE 92"W x 19"H DISCHARGE DUCT FROM NRNING VANE THRU WALL. _ . . - O � MOUNT UNIT SUSPENDED FROM JOISTS ABOVE VNTH UNISTRUT AND ALL _��._ _____._ _. _, .__._ __ . . Z� PROV�DE FIRE SMOKE DAMPER AT WALL FOR UNIT ISOLATION. SEE SECTION 22 THREADED HANGERS. CONNECT UNISTRUT MEMBERS TO JOIST BOTTOM CHORDS g -' �- �� � 34 ._ B/M3. AT PANEL POINTS (WTERSECTION OF CHORD & DIAGONAI MEMBERS) 8Y 1 � � � 24x24 � -� RENRN AIR PLENUM ON TOP OF UNIT. PROVIDED BY OTHERS INSTALLED BV CLAMPING. PRONDE ADDITIONA� UNISTRUT SUBFRAMING TO SUIT MAU-1 I (FIEID VERIFY) � O HANGER ROD LOCATIONS. ; M.C. FILTER ACCESS TO BE THRU DOOR ON FRONT OF PLENUM. EXTEND UP z0 � I �'�� AND ELBOW tO5z24 DUCT THRU WALL WITH FIRE/SMOKE DAMPER AND J¢"x 28x22 OUTSIDE AIR LOUVER W/BIRDSCREEN (400 CFM PRESENT/800 CFM I ~ �, I � I � I � '� �� I � �� ��� �Z,� � � ' �., � B/M3, GAUGE WIRE SCREEN IN REMOVABLE 'U' CHANNEL FRAME. SEE SECTION z3 FUTURE). I ' I I I I I I �., I I I I I I (FIEL� VEPoFY) -�� 14"6 (FIELD �`� I �.� _L�I __ _ LIEBERT AIR CONDITIONING UNIT FURNISHED BY OTHERS INSTALLED BY M.C. Zq 28z22 OA OUCT, SIZE i0 MATCH LOUVER AND FlLTER BOX OPENING. PRONDE 20 VERIFY) � i � 4 MOUNT ON RAISED FLOOR IN DOWNFLOW CONFIGURATION. INSTALLATION SHAIL 1" 1HICK INSULATING BOARD ON DUCT. I I I I I I I I I I I I - f 21 - I .�:-- � � 8E ON fL00R STAND WITH NRNING VANES PROVIDED BY OTHERS. MOUNT IN I I I I I I I I I I I I I '._ _ --- , I , 2" HIGH 20 GAUGE GALVANIZED STEEL WELDED CONTAINMENT PAN PROVIDED ZS UPON UNIT 3HUTDDONT.ER. SET DAMPER TO 800 CFM. DAMPER TO CLOSE I I I I I I I I I I I I I ' BY M.C. INCLUDE LEAK DETECTOR IN PAN. .� '_..I 38 I I I,� . I ( I I I I � I ��, ' �g �� '---� �-- � - '�. I O RETURN AIR PLENUM ON TOP OF UNIT. PROV�CED BY OTHERS INSTALLED BY 26 �Bx�Z RENRN AIR DUCT W/ Y" x Ya" SCREEN AND VOLUME DAMPER. _ �g 5 BALANCE TO 500 CFM � � � � � � � LI �� 0 � ■ �,- �.-. ,.:_,: i c7 ■ _ — -_ � z ¢ ' 37 a � W � 35 � ' ' Z O _..._ r - Z ■ _ �� CRAC-108-1 FSD �- I ❑' 1 3 - z 0 V 2 6 7 . .._. . � � i�_ , = I —_ . U � ,,. F– I ,, '_.._. Q � ■ ■ I I _ r----��-�--�oo- -- - -�__ ..__.._ - ■ o0 I ■ � , . ............. I � _ — I ' ■ ■ ' -........... ■ _ ■ ' ■ ■ I"--`.: __,-�, -__ ._____ � I - � -- ---- -.�. _ .- - I '.. .',..... CRAC-108-5 4 5 6 7 I - � I----- I --I -��-� Q -__- - - -� M.C. FlLTER ACCESS TO BE THRU DOOR ON fRONT OF PLENUM. EXTEND ' DUCTWORK INTO CEIUNG PLENUM. ���� �__ - I 12"0 (FIELD I� � T� �� O�N RL AND 1J§" RS REFRIGERANT PIPING UP TO CONDENSING UNIT ON ROOF L� L� � 'I_ � L J o L J �- � � L � i O �y4" CONDENSATE DRAIN FROM UNIT. CONNECT TO CONDENSATE DRAIN PIPING 27 ABOVE. ROUTE THRU EXISTING FLUE OPENING TO ROOF. 17 � � BELOW RAISED FLOOR AND EXTEND TO FLOOR DRAIN. r� �� _�� r� �� I :.� VERIFY) i_,. ' I � , -- � 1" CONDENSATE DRAIN PIPE DN, ROUTE BELOW RAISED FLOOR AND CONNECT �I-- -I- �-� r I� I� � I I � . i I i I ��, �. . i' _ O7 Yz" COLD WATER PIPING TO UNIT WITH ISOLATION VALVE. PIPING ROUTED 28 TO 1Y" DRAIN PIPE. ,I I I I� � I I� I I I � � I i ; � BELOW RAISED FLOOR. SEE PLUMBING DRANnNGS. 18 � � pg PROVIDE COM8INATION STARTER/DISCONNECT SWITCH FOR SUPPLY FAN MOTOR. I I I I I � � , � Og 24"x24" PERFORATED F100R PANEL. COOROINATE WITH G.C. 30 yqx6 SUPPIY REGISTER � 350 CFM. 25 _ w � �� I � I', ... _. , . I gO 24"x24" RETURN GRILLES MOUNTED IN CEILING OF HOT AISlES. I I I I L- IJ � i � I � I � � _ _ I _ 31 12z6 SUPPLY REGISiER � 150 CFM. .� � � � - � � � � � � r 7� �.I I I I q I I I I u i ---- -" � I � 70 (6) tYe" RL AND (6) 13/" RHG REFRIGERANT PIPING. VERIFY S2ES W1TH I L I�� I� J F--- 32 14z10 SUPPLY REGISiER � 400 CFM. BOTTOM AT 8'-6" AFF. . 26 . MZ I f t _ LIEBERT. ROUiE ABOVE LAY-IN CEILING CENTERLWE OF SUPPORT 14'-0"t _ "_...._ L�..�1 L� I I I -.::-: - ABOVE RAISED FLOOR. , , , , I 33 �4K�0 SUPPLY DUCT CAPPED FOR FUTURE CONNECTION. i 23 �� � '� � ��' O(4) 1Ye" RL AND (4) i�" RHG REFRIGERANT PIPING. VERIFY S2ES W1TN O � �, v�+ I .. _ i l 34 RELOCATE FILTER 80X TO LOCATION SHOWN, PROVIDE NEW FILTERS. -- LIEBERT. ROUTE ABOVE LAY-W CEILING, CENTERLINE Of SUPPORT 14'-0"t _ - �� _ -_ - _ -__ �_ _ ��. _ _._ _ __ ... . �„�_ . _ C `. ABOVE RAISED FLOOR. 35 (4) �' RL AND (4) 1�" RHG REFRIGERANT PIPING (STACKED) MOUNTED __. . . ..__ -_-..... -__ �"� - - -�-� � 12 (2) 1J(�" RL AND (2) i�§" RHG REFRIGERANT PIPING. VERIFY SIZES N1TH CENTERLINE OF SUPPORT 9'-0"3 ABOVE RAISED fL00R. 24 �� - � � LIEBERT. ROUTE ABOVE LAY-�N CEILWG, CENTERLJNE OF SUPPORT 14'-0"t 36 ROUTE �° RL AND 1�" RHG REFRIGERANT PIPMG UP THRU GRATING i0 ACCU �� "�� ABOVE RAISED F�OOR. 1 22 MAU-i -c> EH 1 - - ABOVE. I Ic+ 8 ., EH Z. 13 (4) �" RL AND (4) 1�" RHG REFRIGERANT PIPING (STACKED) MOUNTED 10' � 0 r= - -- Ly-_ tA ���� �I � M3 pg 18 - �=.� -- -� � . � ... - CENTERLME OF SUPPORT N'-0"t ABOVE FINISHED 'RA�E. REFER TO 37 (4) � RL AND (4) 1� RHG REFRIGERANT PIPING (STACKED) MOUNTED w �� 33 �. - .- --_ ' CENiERLINE OF SUPPORT 12'-4"f ABOVE RAISED FLOOR. - - �- -� - --- SECTION A/M2. � , _ �... � ,._. .... ... . ,, _ � � � - ROUTE (2) ib" RL AND (2) 13§" RHG REFRIGERANT PIPING UP THRU GRATING --18x1 �t2� -� �=-- � - � -- -- � � � �q (4) �/e" RL AND (4) 13§" RHG REFRIGERANT PIPING (STACKED) MOUNTED 38 TO ACCU ABOVE. �. . . .- _— - CENTERLME OF SUPPORT 14'-4't ABOVE FINISHED GRADE. REFER TO SECTION A/M2. _ . . �.�. ° � � - �---� /r� ` _~ ILJ � � � r-a - -- I ��--p �� � Z^�a- p+�- -+�-.�" `�`�� - I � N � 15 (2) 1�° RL AND (2) 1§b" RHG REFRIGERANi PIPING THRU WALL TO ACCU ON �___ x --- � . � PLATFORM. SEE ROOF PLAN ON M3 AND SECTION A/M2. -�. . AD - � , �.� .. �-/2' � I I � _ --_ _K. `CZ p J, � l� � 6 EXISTING AIR HANDLWG UNIT. PROVIDE PITOT NBE READING TO DETERMINE � FSD��D ,��4 �6 ' �� I I , EXISTING AIR VOLUME (CFM). � - _ . I I . ..— _-_- I -� . 17 EXISTING AIR COOLED CINJDENSING UNIT. � 32 FLOOR �� � 18 EXISTING REFRIGERANT PIPING. DRAIN BY � � --- - '. OTHERS i � �� �y INSTALL RELOCATED THERMOSTAT FOR EXISTING AIR HANDLING UNIT IN THIS I LOCATION. - � � � � x � . NI ^� pnp �. � �, <O i � LJ ,. _ ........_ . '� ... . _. .__ . ...- -t�.:r:i � ,'. �� , ; GENERAL NOTES: � __ . � .._ -�'� � �� A. UNISiRUT TRAPEZE SUPPORTS SHALL BE S2ED TO ��� . .. ' C�, 26z18 I 22x16 ` �.�� . SUPPORT REFRIGERANT PIPING AND ASSOCIATED POWER -- � __- _-__ -0-__- -__� � WIRING CONDUITS AND CONTROL VARE CONDUItS ( _ _ -� _—__ �.i� . ; . g � . . ._..-..- ' , . i . . ...:. _'.:�...:� _ _ __ ._____ I ° \. � . , a � ^ 9� 7VP __-.-- � . -- Zi�r� _�8 .....__ '.. _ � __. ', _ I � . � �' ... .... ...... � -,._-- GUARDRAIL _ .,�� __ ; ACCU-108-7 ROOF BEYOND '-" . <I ' 12 ,.� -- . - ._ --,- 1 i .. _. ,. �-�-� ...�2� ...., ,- 24x24 SD CRAC-108-6 � 12"0 NECK q 5 6 7 I 400 CFM I, � (TYP. OF 3) .-_ ... . �i �-I_� .. ACCU-108-6 (4) �y�" RL AND ACW-108-5 . .... . -_ . � F; OQR ORAIN ' BY OTHERS - ..��-- �:_:::: �� � (4) i�" RHG EXIST. �' I I _ .. CONDENSER 7 ■i�fll c`������� � � .IIIII . . _.- _ t_.... � -�I � _ �-2�� ..... . _. __ � ��� - �� I � — � j a ��-� _...--.s d. 1 � E I i _ � - -, __L_Z__^� I . 19�'.. .. I � � � V _ � ,,, .. ... �. .. �I�f.J� _ _ - � . -- .. .. . / ` — . _... .._--_.-.�. CRAC-108-7 24x24 RG-� � .. !!'�iOi� 11` Ce PARTIAL FLOOR PLAN - NEW WORK - SCALE: 1/8" = i'-0" BUILDING NORTH 12 STEEL � � PLATFORM � (4) tYe" RL ANO (4) 1�" RHG CANOPY " --- -- ��DOORING DOCK _ - " PLATFORM _ - __ SUPPORT _ ,__ „ COWMN -� RAISED _ FLOOR n - = 1 A SECTION M2 SCALE: 1/4" = 1'-0" �(4) 1J�" RL AND (4) 1�" RHG - �_ , � L: I _ ____ - ....._._... . � . _.-__ �._.. . �QQn.�99� �- EXIST. PLATFORM 13 CANOPY - EXIST. REFRIGERANT PIPING 12'-0"t ABOVE GRADE � EXIST. COLUMN ' GRADE i Z � � ' �i W � �}� i � � V � z � `L W 4 � � � d �Na� N � N � � O 3a�� � m N .� N � 2� c r � o " �Nc`�na� 1�, �� � ^ � �: • � . � � v� � A � � � sFA1 tvo. � N M L � � �� e z �,oa W a�� � W �°� �a � ��� z W OQ O � 0 � W N � � NO. UATh REVISWN o u z1-�3 �BIDDINf.AND CONStRUCT10N PROJgCCNUMBER: ._ PROJECIDAiE: , DR4WNAY: LGB CkIECICEDBY: TJS SCALE: ' . DRAWING"I]TLE PARTIAL FLOOR PLAN - NEW WORK oasw�NC nvessea M2 AIR CONDITIONING UNIT SCHEDULE (UNIT BY OTHERS) NOMINAL SUPPLY FAN EXiERNAI COOLING CAPAqTIES ELEC. HUMIDIFIER FILTERS ELECTRICAL DATA MANUFACTURER TAG SERVES COOLING 7YpE �� S.P. REHEAT � ACCESSORIES TONS N�' HP IN. W.G. �BH MBH DB RH (kW) TYPE LBS/ T1PE THICKNESS AREA MERV VOLTS PHASE FLA WSA �P� MAKE MODEL BLOWERS � ) SENS. TOTAL DEG f % HR (S.F.) (AMPS) CRAC-108-1 CO-L0108 30 DOWNFLOW 15,500 3 15�� 0.2 260.3 300.4 72 50 30.0 INFRA- z20 THROW- y Z5.0 il 460 3 95.4 109.1 125 LIEBERT DS-105 1,2,3,4,5,6,7,8,9 (1 MOTOR RED AWAY CRAC-108-2 CO-L0108 30 DOWNFLOW 75,500 3 15�� 0.2 260.3 300.4 72 50 30.0 INFRA- z20 THROW- y p5.0 11 460 3 95.4 109.1 125 LIEBERT DS-105 1,2,3,4,5,6,7,8,9 1 MOTOR RED AWAY CRAC-708-3 CO-L0108 30 DOWNFLOW 15,500 3 15�� 0.2 260.3 300.4 72 50 3p.p INFRA- p2.0 TMR�W 4" 25.0 11 460 3 95.4 109.1 125 LIEBERT DS-105 1,2,3,4,5,6,7,8,9 1 MOTOR RED AWAY CRAC-108-4 CO-L0108 30 DOWNFLOW 15,500 3 15'� 0.2 260.3 300.4 72 50 30.0 INFRA- 220 THROW- q• p5.0 17 460 3 95.4 109.1 125 LIEBERT DS-105 1,2,3,4,5,6,7,8,9 1 MOTOR RED AWAY CRAC-108-5 CO-L0108 30 DOWNFLOW 15,500 3 15�� 0.2 260.3 300.4 72 50 30.0 INFRA- 2z0 THROW- 4" 25.0 il 460 3 95.4 109.1 125 LIEBERT DS-105 1,2,3,4,5,6,7,8,9 (1 MOTOR RED AWAY CRAC-108-6 CO-l0 708 30 DOWNFLOW 15,500 3 15�� 02 260.3 300.4 72 50 30.0 MFRA- 2z0 iHROW- y- p5.0 11 460 3 95.4 109.1 125 LIEBERT DS-105 1,2,3,4,5,6,7,8,9 (1 MOTOR RED AWAY CRAC-108-7 CO-L0108 30 DOWNFLOW 15,500 3 3 02 260.3 300.4 �2 50 30.0 �NFRA- ZZQ THROW- 4^ y5.0 11 460 3 95.4 709.1 125 LIEBERT DS-705 1,2,3,4,5,6,7,8,9 (1 MOTOR RED AWAY ACCESSORIES NRNISHED WITH EOUIPMENT: 1. FOUR STEP SEMI-HERMEPC COMPRESSORS 5. AUDIBLE AND LCD VISUAI ALARMS 9. iCOM CONTROLLER 2. IOCKING DISCONNECT SN7TCH 6. OPEN COMMS - DIGITAL OUTPUT ALARM CONTACT BOARD 3. SMOKE DEIECTOR 7. LEAK DETECTOR BELOW Fl.00R 4. ADVANCED MICROPOCESSOR BASED TEMP AND HUMIDITY CONIROLS 8. FLOOR STAND (WiiH NRNING VANE) AIR COOLED CONDENSING UNIT SCHEDULE NOMINAL TOTAL REFRIG. SAT. COMPRESSOR CONDENSER FAN UNIT WIRING TAG N0. SERVES CAPACITY CAPACIIY REFRIG COND. TEMP. N0. OF MAX AMB. AIR REMARKS TYPE CIRCUITS TEMP (F) Hp (TONS) (MBH) ��) N0. VOLT/0 RLA LRA N0. EACH �A VOLT/6 MCA MOP CU-1 MAU-1 5 58.7 R-410A 40' 1 1 480/3 7.8 52 95' 1 1/5 0.6 480/3 10.0 15.0 T�ANE TYPE 4TTA3060A4 NOTE: 7. PROVIDE TXV, FILTER/DRYER, SIGHT GLASS, REFRIGERANT SPECIAlTIES. SIGHT GYASS RS NOTES: � ALL REFRIGERANT PIPING SHALL BE INSTALLED ACCOROMG TO THE MANUFACNRERS RECOMMENDATIONS. 2 ALL FINAL REFRIGERANT PIPE SIZES SHALL BE VERIFlED BY THE EQUIPMENT MANUFACNRER BASED ON 7HE FINA� REFRIGERANT PIPE ROUTING BY THE CONTRACTOR. iHE CONiRACTOR SHALL SUBMIT AN ISOAIETRIC PIPING LAYOUT OF iHE SYSiEM TO THE UNIT MANUFACNRER FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK. AND SUBMIT iHE MANUFACIURER APPROVfO ISOME7FtIC TO THE ENGINEER FOR APPROVAL. FlLTER DRYER �T�) 1/4" CAPPED CHARGING VALVE (il'P) SENSING BULB SOLENOID VALVE (TYP.) RS �� - RL - DISTRIBUTOR (TYP.) �r----- -i fu'� ..-. - � I �I �� MAU-t �j �EVAPoRATIXi I I I CqL qRCUIT I � -__I� �L - -_J� ROOF FLOOR REFRIGERANT PIPING DET,41L (,MAU-1� SCALE: N.T.S. AIR COOLED CONDENSER UNIT SCHEDULE (UNIT BY CINJDENSER UNIT ELECTRICAL DPTo REFRIG. N0. HOT LIqUID TAG SERVES �E OF GAS LWE CIRCUITS LWE ACCU-108-1 THRU 108-4 CRAC-1U8-1 THRU 108-4 R-407C 2 1-3/8. 7/8. ACCU-108-5 THRU 108-7 CRAC-108-5 THRU 108-7 R-407C 2 1-3/8" 1 1/8" ACCESSORIES FURNISHED N7TH EQUIPMENT: 7. FURNISH W1TH FAN SPEED CONTROI FOR -20 DEGREES FAHRENHEIT 2. FURNISH VATI-i PACTORY W1RED CONDENSER DISCONNECT SWITCH AMBIENT FANS MFX M� N0. nPE EACH VOLTS PHASE FLA 100 -10 4 DIRECT 3/4 460 3 7.6 100 -20 4 DIRECT 3/4 460 3 7.6 MANUFACTURER OPD MAKE MODEL \MPS) 15 11EBERT CD-415 15 L�EBERT CD-415 ISKNi.Y.Y�l:�li. 1,2 1.2 NOTES A. ALL REFRIGERANT FIPE SIZES SHALL BE TNE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR AND EQUIPMENT MANUFACTURER BASED ON THE FINAL EQUIPMENT LOCATION(S) AND PIPE ROUTING. ALL REFRIGERANT PIPING SHALL BE INSTALLED ACCOROWG 70 THE MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS. AIR HANDLING i!NIT SCHEDULE CFM COOLING COIL TAG FAN FAN TOTAL VOLTAGE TOTAL FILTERS REMARKS PRESENT FUTURE HP RPM E.S.P. MBH SEMSBIHLE EDB EWB LDR LWB MAU-7 900 1300 1.0 1416 1.5 460-3-60 58.7 39.8 85.3F 68.7F SS.OF 54.6'F (2) 16u25 TRANE PERFORA�ANCE CLIMATE CHANGER SIZE 3 NOTES: t. VALUES ARE FOR fUTURE CONDIiIONS. ELECTRIC DUCT HEATER SCHEDULE TAG SERVES KW DUCT SIZE VOLTS/0 CFM NOTES MANUFACTURER EH-1 OATA CENTER 9 14x12 4fi0/3 800 1 INDEECO QUZ EH-2 SERVICE CORRIDOR 5 14z8 460/3 500 1 INDEECO QUZ EH-3 WLD STORAGE 5 14x8 460/3 500 1 INDEECO QUZ NOiES: 1. ALL DUCT SIZES ARE OUTSIDE �IMENSIONS. MECHANICAL SYMBOLS AND ABBREVIATIONS NEW WORK OT THERMOSTAT/ SPACE TEMPERATURE SENSOR EXISTING WORK TO REMAIN TS TEMPERANRE SENSOR -------- DEMOLITION -p-p P-TRAP ----- WLD WATER (DOMESTIC) CRAC-X COMPUTER ROOM AIR CONDITIONING UNIT DIRECTION OF FLOW AC-X AIR CONDITIONMG UNIT PI� DIRECTION OF PITCH ACCU-X AIR COOLED CONDENSER UNIT - D- DRAIN AFF ABOVE FINISHED FLOOR - RHG - REFRIGERANT HOT GAS CO CLEAN OUT -RL - REFRIGERANT LIQUID CU CONDENSING UNIT - RS - REFRIGERANT SUCiION FD FLOOR DRAIN �� ELBOW TURNED UP G.C. GENERAL CONTRACTOR -O ELBOW TURNED DOWN M.C. MECHANICAL CONTRACTOR _� P.C. PLUMBING CONTRACTOR TEE TURNED DOWN �UH UNIT HEATER TEE TURNED UP � CAP � N�W TO E I�T1NC TION - ��� GROUND JOINT UNION � BALL VALVE i m LIQUID LINE FlIiER DRYER - SIGHT GLASS - SOLENOID VALVE TX VALVE - r----- i I I i I I I � I i-----J 1 I i 1 1 i I A� CONDITIONING UNIT � I ROOF 1ST FLOOR FACTORY PROVIDED I FIELD INSTALLED � c� � x I � FULL PORT REFRIGERANT BALL VALVE (T1P.) INVERTED TRAPS ON DISCHARGE AND RETURN PIPING TO EXTEND ABOVE BASE OF COIL BY A MINIMUM OF 7 }�p" (TYPICAL). - FIELD INSTALLED I FACTORY PROVIDED PLUG _ +-rti- RL ` - � � I I I I I i PLATFORM �---- ._.__. _ . _........ ____________.� i I RH AIR COOLEO � R� CONDENSER ! - RL - RHG c� � x MOUNT PIPING SECURELY ON UNISTRUT SUPPORTS ALONG WALL. ��,��� � EXTERIOR WALL NOTES: � 1. PIPE SIZES AND ARRANGEMENT ARE SCHEMATIC AND SHAIL BE APPROVED � BY EQUIPMENT MANUFACTURER AND CONiRACTOR BASED ON FINAL . EOUIPMENT LOCATION AND PIPE ROUTING. REFRIGERANT PIPING DETAIL SCALE: N.T.S. I I i -_-_J ...... .... _.. ..................._.... � SEQUENCE OF OPERATION (MAU-1� A. MAU-1 SHALL RUN CONiINUOUSLY. THE OUTSIDE AIR DAMPER SHA�� BE SET AT 400 CiTA PRESENT/800 CFM FUTURE. THE OUTSIDE AIR AND RETURN AIR SHALL MIX AND BE FILiERED 7NROUGH ANGLED FlI.TER SECTION. B. A DISCHARGE TEMPERANRE SENSOR SHALL CYCLE THE CONDENSING UNIT COMPRESSOR TO MAINTAIN 55'F DISCHARGE AIR TEMPERANRE. G DUCT HEATER EH-1 SHALL BE ENERGRED TO MAINTAIN A DISCHARGE AIR TEMPERANRE SET POINT OF SSF (ADJ.). D. DUCT HEATER EH-2 SHALL BE ENERGIZED FROM ITS iHERMOSTAT TO MAINTAIN A SET POINT OF 75F (ADJ.). E. UPON FAILURE OF EITHER DUCT HEAiER AND/OR THE CONDENSWG UNIT NhIERE TEMPERATURES CANNOT BE MET iHE FAN SHALI BE DE-ENERGI2ED AND THE O.A DAMPER CLOSED. f. UPON DETECTION OF SMOKE BY THE FIRE ALARM SYSTEM (FE-25) THE FIRE/SMOKE DAMPER AT DATA ROOM 108 SHALL BE CLOSED AND THE UNIT DE-ENERGIZED. ALL CONDUIT AND WIRING FROM DAMPERS AND STARTER TO ALARM CONTROL PANEL, SHALL BE FURNISHED BY M.C. SEQUENCE OF OPERATION (DATA ROOM) A. THE SEVEN (7) AIR CONDITIONING UNITS WiLL BE PROV�DED WIiH ONBOARD MICROPROCESSOR CONTROLS (iCOM CONTROLLER) EACH SET TO MAINTAIN A ROOM iEMPERATURE SET POINT OF 72' FAHRENHEIT (F) (ADJUSTABLEj. EACH AIR CONDITIONING UNIT SHALL BE EQUIPPED WITH TWO (2) INDEPENDENT COMPRESSORS, CONNECTED TO AN AIR COOLED CONDENSER IN A DUAL CIRCUIT PIPING ARRANGEMENT. WHEN THE UNIT THERMOSTAT SENSES A NEED 'i0 HEAT OR COOL, IT SHALL ENERGIZE THE ASSOCIATED SYSTEM COMPONENTS THRU MICROPROCESSOR CONTROL. IN ORDER TO MAINTAM THE SPACE SET POINT TEMPERANRE. UNDER NORMAL CONDITIONS, SIX UNITS SHALL "RUN" WHILE THE OTHER IS SEQUENCED TO THE "STANDBY' POSITION. A CHA4GEOVER/SEQUENCER SHALL ROTATE THE UNITS EVERY THREE (3) DAYS (ADJUSTABLE) UNLESS A UNIT IS SEQUENCED TO "START° AND FAILS. IF FAILURE OCCURS FOR ANY UNIT, AN A�ARM MESSAGE SHPLL BE SENT TO THE iERMINAL PANEL AND THE FAILED UNIT WILL REMAIN OFF-LINE. ALL CONTROL CONDUIT AND CAT-5 NIRING fROM iHE CRAC UNITS TO THE TERMINAL PANEL SHALL BE PROVIDED BY E.C. ALL CONTROL CONDUIi AND CONTROI WIRING FROM CRAC UNITS TO CONDENSERS SHALL BE PRONDED BY M.C. B. FIRE ALARM- THE MECHANICAL CONTRACTOR SHAI.I. BE RESPONSIBLE FOR PROVIDING EQUIPMENT START/STOP CONiROL CONDUIT AND W1RWG FROM THE FIRE ALARM (FE-25) PANEL, TO "STOP" ALL AIR CON�ITIONMG DURING A FIRE SUPPRESSION ENGAGEMENT FOR iHE SPACE. EACH UNITINCORPORATES A FACTORY PROVIDED SMOKE DETECTOR. UPON DETECTION OF SMOKE THE DETECTOR SHALL SHUT �OWN THE UNIT AND AlL OPERATIONAL CAPABIUTIES. SEQUEN�cEACOF OPERATION (ELECTRIC ROOM) A. THE CONTROLS OF TNE CRAC UNITS SHALL BE SET TO MAINTAIN A ROOM TEMPERATURE SET POINT OF 72' FAHRENHEiT (F) (ADJUSTABLE). UNITS SHALI OPERATE IN A LEAD/lAG FASHION. A CHANGEOVER/SE�UENCER SHALL ROiATE 7HE UNITS EVERY SEVEN (7) DAYS (ADJUSTABLE) UNLESS A UNIT IS SEOUENCED TO "STARi AND FAILS. IF FAILURE OCCURS FOR EITHER UNIT, AN ALARM MESSAGE SHALL BE SENT TO THE TERMINAL PANEL AND THE FAILED UNIT NhLL REMAIN OFF-LINE. NORMAI OPERATION: ONE UNIT OPERATES TO MAINTAIN SPACE TEMPERANRE. IF THE UNIT FAILS, IT'S ISOLATION DAMPER SHAIL CLOSE AND iNE SECOND UNIT'S ISOLATION DAMPER SHALL OPEN AND THE SECOND UNIT SHALL ENERGIZE. IF THE SPACE TEMPERANRE RISES 3' F(ADJ.) ABOVE SETPOINi, THE LEAD UNIT SHALL DE-EMERGIZE, IYS ISOlATION DAMPER SHALL CLOSE, AND THE SECOND UNIT'S ISOLATION DAMPER SHALL OPEN AND THE SECOND UNIT SHALL ENERGIZE. IF FAILURE OCCURS FOR ANY UNIT OR TEMPERANRE RISES 3' F(ADJ.) ABOVE SETPOINT, AN ALARM MESSAGE SHALL BE SENT TO THE TERMINA� PANEL. THE FAILED UNIT WILL REMAIN OFF-LINE. ALL CONIROL CONDUIT ANO CAT-5 `MRING FROM THE CRAC UNITS TO THE TERMINAL PANEL SHALL BE PROVIDED BY E.C. ALL CONIROL CONDUIT AND CONTROL WIRING FROM CRAC UNITS TO CONDENSERS SHALL BE PROVIDED BY M.C. 8. EACH UNIT INCORPORAiES A FACTORY PROVIDED SMOKE DETECTOR. UPON DETECTION OF SMOKE THE DETECTOR SHALI SHUT DOWN THE UNIT AND AlL OPERATIONAL CAPABILITIES. �n � � w+ � W W � � ` z� a: � � i_ ; Z � I..L W § � :: � � d � �NO� � � N O � : 3aN� � o� 0 3 n � � c r o? O " " � o�aa � �� `� ^ � �� � 4.-���. �:. V,. I i � � � SEAL � M � o a d W �p°�� A az� W� ��Ca � � C z W o� �z n� �.7 = � � � � � NO. DATE RLVIStON o v-2t-y3 81DDINCAND CONSTRUCTION PRWECI'NUMBBR: _. _., .... PxaF:cr onre: _.- _ - - oxnwrv xv: LGB CHECKEDBY: TJS SCALE: ... ... .. _ DRAWINGTITLE SCHEDULES, SYMBOLS, BBREVIATIONS, SEQUENCE OF OPERATION & DETAILS �unw�NC Nuhtuex m