Loading...
HomeMy WebLinkAbout05090194-Site Plan~ [mia ~ ~~ 's 0 ased p field survey. The ~neider CorPoration l~ttaaa,~ ~ ~ ~ as US does not warrant the accuracy or sufficiescy of th $ information. m?-s~-ql~o Contrsctors should verify existing conditianS Prior to (my ma ¥~ construction. Any dtsm'eponcy found on this drawing should be reported to The Schneider Carporoticn immediatel$ fuging to do so results in the contractors essumPticn of di! liehifity. ~' ~1' ~ Storm Lines -- v ~ Water SerWce Lines n Lines 6' B.H. Finished Rant Bavarian Information Pal grade = 91.8;9 per plan P~ grdde + 0,2 = Sorege FiE (919.1) Sorege PrE + 0.5 = Reeidontidi FFE Resdidesce FFE - 9.0' = Soesment FFE (910,6) Gn~nd Ca~r Caicuiation¢ Seeding = 4,902 SF~ Sod =26~- SY~ , from froot of home. TC=919.76 =916.39 Note ~ me ger~Je flni~ed floor devotion is 1.6 above the curb et the dri~ per TC=gt9.76 pan. ~ RECORD Note: Builder to ensure positive drdinage away from structure(s), 127.94 FLOOD HAZARD STA1EMENT CERllFICATION PEa i } .sro: ~ :.. ] ~ Note: 1he contractor is to me~ntoln a 1he basement eiewtion, depicted hereon, has been determined ~ /,,, ..,, ~ m~nimum distance of tee feet (10') and based upon the pad gredes and/or conteors taken from the ~<.~;'?./.~DIA?,.?,,.:~,~<~:,.~ ~et~eee the sanitary sewer and water construct,on pens far this subdivision. Unless stated, no ~ ~7 elm~l~.~,.,,~ . reformation about flu. ctuatlng water, table, soil ) be at Rood Hazard Statement: The accuracy of any flood hazard data sho~ on thL~ plot plan is subject to map s~e uncertainty and to any other uncertainty in location ~ elevation au the referenced flood insurance rate map (RRM). N~,e of the within doncn'bed land lies within that special flood hazard zeoe A, as said land plots by scale eo Community Map Panel ~t 18OR810001C of the flood insurance rate maps (RRM) for Hamilton County, Indiana, Dated May 19, 1981. least two feet (2') ~bove the normal ~)o~ elmmtton of any adjoining bodies of water, unless a study of facts reveals otherwise. If during the excavation process any ground water is witnessed, The 5al~neider Corporation ~ould be notified immediately. The basement election should be raised two feet (2') above the ground w~ter, and additional construction techniques should be incorporated to dile~te future arublerns. N01~ THE ~THIN PLOT PLAN WAS PREPARED AT THE CUENTS REQUEST WfiHOUT BENERT OF A RECORD PLAT. THE CONTRACTOR ANO/OR BUILDER HAS BEEN CAUTiONED THAT THE DE:PiClED UNES ~O~i H[EON ARE SUB.CT TO CHANGE