Loading...
HomeMy WebLinkAbout05100039-Sq. Ft. k, Al sideWalks and driveways , Sewer and water nes, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n, All drainage swales and subsurface facilities (retention / detention areas, etc...) o Sump pump -- Show sump pump p t(s) and discharge ina locations p, .Geothermal heat pump discharge locations *NOTE: If land is not Within a platted sUbdivision, a legal description is required. buildi ¢ will result FURTHER NOTES / NOTICES: > CARMEL ZONING ORDINANCE Z-289, SECT[ON 29.04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of ~he written applicaUon form and accompanying materials. The Improvement Location Permit shall be issued when the proposed ~ructure, improvement, or use and t~ ocation conform n ail reseects to th s o d nance. IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTSf THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDEANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEFT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITYED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITFA!. OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REV[EW. ~ THE OFFICE OF BUILDING & ?ODE ENFORC,E~ENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A BONUS ROOM TO BE UNOCCUPIAB iNFINF~HED SPACE. IF AN AREA SO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA ~ IS AN FTH PERMIT~ THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. ~ ALL CONSTRUCTION lS SUB3ECT TO FIELD ZNSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE ~ ISSUANCE OF THE BUZLDZNG PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, [b.,'~.~J INsuLATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning pdor to obtaining ~ a building permit and/or proceeding with construction beyond the Ccage of a required inspection without approval constitutes Late Fee penalUes, per Z-289 of the Carmel/Clay Zoning Ordinance;, 29.06.07, and 29.06.08. BUILDING & CODE ENFORCEMENT: CITY OF CARMEL. One Civic $~{.; Carmel, lN 46032. Ph. (317) 571-2444. , and accurately on the l, submitted with the Services. I further ~ply d in t able below is intentionally mislead the Dept. of [Finished and Unfinished) Porch Porch or Sunroom__ Garages APPLICANT!S SIGNATURE