HomeMy WebLinkAboutCorrespondence e Mr. Darrell G. Phillips, PE May 17, 2005 Building #3, 96th Street Professional Park-Project Review #1 Page 2 of4 e 5. TAC ReviewlDrawings submitted for approval: We request that all comments and comment letters generated by this office be answered in vvriting and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. All Carmel Utility issues must also re resolved. The design engineer must certify all drawings submitted for final approval. This office will require a minimum of four-sets (maximum of six-'sets) of approved dra\vings after all issues have been resolved. The drawings will be stamped approved arid signed by both the City Engineer and Director Carmel Utilities. The Developer/Owner will receive one-set \vhich is to be maintained on the construction site at all times. Carmel Utilities will receive one-set. Our Construction Manager will receive one-set and one-set will be maintained in the Department of Engineering. If more than the minimum of four-sets are requested to be approved, the additional sets (maximum total of two additional) must be submitted with the four required sets. 6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated easements and/or right of way will require Consent to Encroach approval. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all sanitary sewer main locations. 8. Carmel Utilities will provide a separate review of this project for sanitary sewer issues. 9. I am including copies of the following with this correspondence: . Performance and Maintenance Guarantees . Commercial Project Approval Procedures. . Building Permits . Permit Data, Contacts, etc. . Commercial Permitting Procedures. . City of Carmel Street Sign Standards BONDING REQUIREMENTS 10. Upon initial review, it appears the following bonding requirements may apply to this project: Performance GuaranteesfEngineer's Esti'mates Please provide a detailed and itemized Certified Engineer's Cost Estimate for 100% of the cost of labor and materials for the construction of the following improvements: . Entrance (within dedicated right of way) . Sidewalks (within dedicated right of way) It is our assumption that the storm sewer/storm drainage system will be privately owned and maintained. If this is not the case,. Performance Guarantees will be required for storm sewers. Individual Performance Guarantees will be required in the amount of the Engineer's Estimate. Please advise the Developer that there are 2-outstandine: Performance Guarantees for Buildines 1 and 2 that need to be released and converted to 3-year maintenance.. namely the entrance and sidewalks. He should contact Dick Hill of our office at 571-2459 to arrane:e to have these improvements released by our Board of Public Works and Safety. Street Cut/Right of Way Permit and Bonding Requirements Any work in the dedicated right of way of Randall Road will require a Right of Way Permit. If the work in the right of way is not included in the scope of work of a Performance Bond, a separate License & Permit Bond will be required. The bond amount will be determined by the number of instances of work in the right of way @ $2,000.00 per instance. Open pavement cuts in dedicated streets require separate approval by our Board of Public Works and Safety. It appears that the water service line across Randall Road will require additional bonding. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way permitting and right of way bonding. 11. We have engaged Crossroad Engineers to review all drainage plans and calculations for all projects submitted to this office for review and approval. We will share all Crossroad reviews as they are e Mr. Darrell G. Phillips, PE May 17, 2005 Building #3, 96th Street Professional Park-Project Review #1 Page 3 of 4 e received. If you have not already done so, please send I-set of plans and drainage calculations for this proj ect to: Mr. Greg Ilko, PE Crossroad Engineers, PC 3417 South Sherman Drive Beech Grove, IN 46107 AVAILABILITY AND CONNECTION FEES 12. Availability (acreage) Fees The Current Sanitary Sewer Availability Fee is $1,365.001 Acre . However, the acreage for this proj ect was included with the 96th Auto Park Development and Sanitary Sewer Availability Fees were paid with that development. Therefore, no additional availability fees are due for this project. Sanitary Sewer Connection Fees - Based upon the drawings submitted, the proposed building will contain 10,121 square feet of office space. The Current Sanitary Sewer Connection Fee is $795.00/EDU. Based upon our ordinance, the office classification is calculated at 0.5 EDUs/1,000 ft.2. Thus: 10,121 ft.2 x 0.5 EDUs/l,OOO ft.2 = 5.06 EDUs @$795.00/EDU = $4,023.00 Sanitary Sewer Connection Fees. PROJECT COMMENTS-CONSTRUCTION PLANS 1. Detention will be required for this development. Is a regional detention facility provided? 2. Is there proposed filling of the floodplain or floodway of Carmel Creek? Will the improvements indicated up to the limits of the floodway result in fill being placed in the floodway? The Department will not approve of fill in the floodway. Please also indicate the limits of the floodplain/floodfringe and the Base Flood Elevations of Carmel Creek across the parcel. The finish Floor Elevations of the buildings and/or the lowest opening of the structures must be a minimum of2-feet above the BFE. 3. Please contact Crossroad Engineers to obtain a drainage review checklist. The Department will expect the drainage system designed for this project to conform to the items outlined in the checklist. 4. Any off-site easements must be secured prior to the Department of Engineering approving the drawings. 5. The Department assumes that all internal areas will be blanket Ingress/Egress, Drainage and Utility Easements. 6. The entrance must be a minimum of 200-feet from the centerline of 86th Street. Please label this distance. 7. Please indicate and label a 10-foot asphalt multi-use path along the 96th Street frontage. The City standard section for multi-use path is 1 inch lIMA #11 surface on 2 inches HMA #8 binder on 5 inches # 53 stone. 8. ADA ramps will be required where the 10-foot multi-use path crosses the entrance. 9. The curb return radii at the entrance are required to be a minimum of 40 feet. Please label the radii. 10. Please incorporate the Department's cover and backfill standard for all storm sewers that will be maintained by the City or located within the right-of-way and for sanitary and water mains and laterals within the right-of-way into the design of the Construction Drawings. 11. Any street cuts must be delineated on the plans for sawcut, removal, and replacement. Please include with the details, the Carmel standard street cut patch detail. 12. For the Construction Drawings, please confirm that the Insight Engineering details for curb, sidewalk and pavement m~et of exceed the City Standard Details. If they do not, please include the City Standard Details in the Construction Drawings and delineate on the Development Plan that the City details shall apply for any installation within the City right-of-way. 13. Please provide a Maintenance of Traffic Plan with the Construction Drawings. e e e50 5CD~1 ffl)v5 Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: 96th Street Professional Park- Building #3 Plan Submittal Date: 05/03/05 Hydrologic Unit Code: Project Location Description: 9745 Randall Drive, Carmel Latitude and Longitude: Civil T 11.... Clay County: Hamilton not provided = = .. ~ Project Owner Name: Trumpington Builders E Contact: .Q = Address: 7130 Lantern Road ~ City: Indianapolis .~ Phone: 317-507-4650 Q J. ~ Quarter: Section: 11 1ge -- or State: IN Zip: 46256 FAX: E-Mail: Plan Preparer Name: Affiliation: Insight Engineering Address: 9765 Randall Drive Suite C City: Indianapolis Phone: 317 -848-9040 FAX: State: IN 317 -848-9080 Zip: 46280 E-Mail: Review Date: 05/17/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC .~ Agency: Hamilton County Soil and Water Conservation District ~ ~ Address: 1108 South 9th Street ; City: Noblesville 5: Phone: 317-773-2181 Assisted By: FAX: State: IN 317 -776-1101 Zip: 46060 E-Mail: john-south@iaswcd.org PLAN IS ADEQITAl'E: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NOl A NOI must also be sent to the SWCD, o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NOl A NOI must also be sent to the o PI.JA,N IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). o DO NOT file a Notice of Intent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 of 1 Revised 12/09/03, Form 1 e e OCS050oJ1 ~ Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: 96th Street Professional Park- Building #3 Plan Submittal Date: 05/03/05 Hydrologic Unit Code: Project Location Description: 9745 Randall Drive, Carmel Latitude and Longitude: Civil ..... 11 · ~ Clay County: Hamilton not provided = Q .". ~ Project Owner Name: Trumpington Builders E Contact: .= C Address: 7130 Lantern Road ; City: Indianapolis .~ Phone: 317-507-4650 Q J-c ~ Quarter: Section: T.... .J: Range State: IN Zip: 46256 FAX: E-Mail: Plan Preparer Name: Affiliation: Insight Engineering Address: 9765 Randall Drive Suite C City: Indianapolis Phone: 317 -848-9040 FAX: State: IN 317 -848-9080 Zip: 46280 E-Mail: Review Date: 05/17/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC .~ Agency: Hamilton County Soil and Water Conservation District ~ ~ Address: 1108 South 9th Street ; City: Noblesville 5: Phone: 317-773-2181 Assisted By: FAX: State: IN 317 -77 6-1101 Zip: 46060 E-Mail: j ohn-south@iaswcd.org PLAN IS ADEQ'U'Al'E: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO!. A NOI must also be sent to the SWCD, o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO!. A NOI must also be sent to the o PIJA,N IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). o DO NOT file a Notice of Intent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 of 1 Revised 12/09/03, Form 1