Loading...
HomeMy WebLinkAbout05110059-Plot PlanlENT. IT IS TH SPONSIBIUTY OF THE ~NTRACTOR TO VERIFY SITE ~NDITIONS PRIOR TO ~NSTRUCTION AND NOTIFY E S E A CROUP LLC ond ENWICK OF ANY ~CREPANClES. CATION OF UTILITY TERALS ON PLOT PLAN E CENERAL LOCATIONS R PLAN AND SHOULD BE :~tFIED tN THE FIELD. ILDER TO ENSURE POSITIVE )W AWAY FROM ~UCTURE, TE: MP TO BE PLACED BY ILDER AS NEEDED. ADE SIDEYARD SWALE TO ADES SHOWN ON THIS kN. IF BUILDER IS ABLE TO ACHIEVE SITIVE DRAINAGE AWAY ~M PROPOSED {UCTURE THE ENCINEER ALL BE CONTACTED LDER IS NOT TO DEVIATE )M GRADES SHOWN ON S PLAN WITHOUT THE ~SENT OF BOTH THE ~INEER AND BRENWICK. 11[: THE FINISHED :)OR ELEVATIONS AND ~ GRADES DEPICTED ON 'S PLOT PLAN IS OPEN R REVIEW BY BRENWICK '-~LOPMENT, THE BUILDER CAUTIONED THAT SAID 'ORMATION IS SUBJECT CHANGE. qOTES LOCATION PER NSmUCTION PLAN ~wiNCS, CONFIRM .~EFORE 'ISTRUCTION OF B ",IITARY LATERAL AND TER SERVICE L{NE LOCATION OF UTILITIES ON PLOT PLAN ARE GENERAL LOCATIONS PER PLAN AND SHOULD BE VERIFIED IN THE FIELD. GRANULAR BACKFILL SUGGESTED UNDER DRIVEWAY AT SANITARY SEWER LATERAL TRENCH, WATER LINE TRENCH AND ANY OTHER EXCAVATED AREAS. (IF SITIJATION OCCURS) NOTE: (SECONDARY AREAS - WESTCLAY) MAX HE GHT: 35 ON LOTS 100' AND LARGER (TO EVE Lt,NE) 30 ON LESS THAN 100 MAX, COVERAGE: 50% NOTE: THE INFORMATION FOR THE ELEVATION DIFFERENCE BETWEEN THE PRIMARY FINISHED FLOOR ELEVATION TO THE TOP OF BASEMENT WALL AND TO THE BASEMENT FINISHED FLOOR WAS PROVIDED BY ERE NEEDED TO KEEP D OFF OF STREETS AND ~ OF STORM SEWEES~ PROPOSED GRADE PER PLAN GROUND WATER FLOW SANITARY SE'AER UNE STORM SEWER UNE WATER LINE EASEMENT LiNE BUILDING SETBACK LINE NOTE: (PRIMARY AREAS - j ~W~,STCLAY) MAX. HEIGHT: 30 BUILD:,..UP LINE: 2 STORIES MAX. COVERAGE: 50~ NOTE: PAD ELEVATION SHOWN IS PER PLANS AND IS NOT THE AS-BU LT ELEVATION. · LOT# 932 -'~ ~, 17 691 S.F. ' I ~ 155 00' -~ ~ ~ ~ ~ moo' ww~~ -- ~, ~5~ / ' ~ ~ ~ .... o ............................... I 150.00 TEE AL TO WITH N 10~! OF CHEE D = OF CURB~ - W ~TORED TO iTS Gl J NSTEUCTION; [ OF