HomeMy WebLinkAbout05110059-Plot PlanlENT. IT IS TH
SPONSIBIUTY OF THE
~NTRACTOR TO VERIFY SITE
~NDITIONS PRIOR TO
~NSTRUCTION AND NOTIFY
E S E A CROUP LLC ond
ENWICK OF ANY
~CREPANClES.
CATION OF UTILITY
TERALS ON PLOT PLAN
E CENERAL LOCATIONS
R PLAN AND SHOULD BE
:~tFIED tN THE FIELD.
ILDER TO ENSURE POSITIVE
)W AWAY FROM
~UCTURE,
TE:
MP TO BE PLACED BY
ILDER AS NEEDED.
ADE SIDEYARD SWALE TO
ADES SHOWN ON THIS
kN. IF BUILDER IS
ABLE TO ACHIEVE
SITIVE DRAINAGE AWAY
~M PROPOSED
{UCTURE THE ENCINEER
ALL BE CONTACTED
LDER IS NOT TO DEVIATE
)M GRADES SHOWN ON
S PLAN WITHOUT THE
~SENT OF BOTH THE
~INEER AND BRENWICK.
11[: THE FINISHED
:)OR ELEVATIONS AND
~ GRADES DEPICTED ON
'S PLOT PLAN IS OPEN
R REVIEW BY BRENWICK
'-~LOPMENT, THE BUILDER
CAUTIONED THAT SAID
'ORMATION IS SUBJECT
CHANGE.
qOTES LOCATION PER
NSmUCTION PLAN
~wiNCS, CONFIRM .~EFORE
'ISTRUCTION OF B
",IITARY LATERAL AND
TER SERVICE L{NE
LOCATION OF UTILITIES ON
PLOT PLAN ARE GENERAL
LOCATIONS PER PLAN AND
SHOULD BE VERIFIED IN THE
FIELD.
GRANULAR BACKFILL
SUGGESTED UNDER
DRIVEWAY AT SANITARY
SEWER LATERAL TRENCH,
WATER LINE TRENCH AND
ANY OTHER EXCAVATED
AREAS. (IF SITIJATION
OCCURS)
NOTE: (SECONDARY AREAS
- WESTCLAY) MAX HE GHT:
35 ON LOTS 100' AND
LARGER (TO EVE Lt,NE) 30
ON LESS THAN 100 MAX,
COVERAGE: 50%
NOTE: THE INFORMATION
FOR THE ELEVATION
DIFFERENCE BETWEEN THE
PRIMARY FINISHED FLOOR
ELEVATION TO THE TOP OF
BASEMENT WALL AND TO
THE BASEMENT FINISHED
FLOOR WAS PROVIDED BY
ERE NEEDED TO KEEP
D OFF OF STREETS AND
~ OF STORM SEWEES~
PROPOSED GRADE PER PLAN
GROUND WATER FLOW
SANITARY SE'AER UNE
STORM SEWER UNE
WATER LINE
EASEMENT LiNE
BUILDING SETBACK LINE
NOTE: (PRIMARY AREAS - j
~W~,STCLAY) MAX. HEIGHT:
30 BUILD:,..UP LINE: 2
STORIES MAX. COVERAGE:
50~
NOTE: PAD ELEVATION
SHOWN IS PER PLANS AND
IS NOT THE AS-BU LT
ELEVATION.
· LOT# 932
-'~ ~, 17 691 S.F.
' I ~ 155 00'
-~
~ ~ ~ ~ moo'
ww~~
-- ~, ~5~ / ' ~ ~ ~
.... o ...............................
I 150.00
TEE AL TO WITH N 10~! OF CHEE D
= OF CURB~
- W
~TORED TO iTS Gl J
NSTEUCTION; [
OF