Loading...
HomeMy WebLinkAbout05110002-Sq. Ft.p. Geotherma~ tnd driveways · lines, septc system, (tanks & fi ed system) and/or well locations IS and subsurface fac lities (retention / detention areas, etc.,.) line locations *NOTE: If land is not within a CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the reCeipt of the written application form and accompanying materia s. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance" IN ADDITION TO THE ABOVE-LISTED SUBMI'YI'AL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE pROpERTY INVOLVED. THIS WOULD INCLUDE ANYPLAN COMMISION~ BOARD OF ZONING APPEALSt AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLAP`FrY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL PERMIT REVIEW. ~NY ROOM/AREA DESIGNATED ON SPACE. IF AN AREA SO 3ECOME A UPDATED / 3UILDING & LDING & COP 46032. Ph. (317) is $: Permits J FORMS/RES](DENTZAL PROCEDURES 2 of 2