HomeMy WebLinkAbout1299.98 Correspondence ��;1��:,� ���v��-� 1�,����io� .
I CERTIFY THAT ALL OF THEAB�E LISTED INFORMATION'IS SHOWN.COMPLETELY AND ACCURATELY ON THE '
ATFACHED PLOT OR SITEPLAN AS SUBMITTED:WITH A BUILDING PERMIT APPLICATION TO THE CARMEL-CLAY
DEPARTMENT OF COMMUNITY SERVICES. I FURTHER CERTIFY,THAT THE JOINING OF WATER SUPPLY PIPING
SHALLBE MADE WITH LEAD-FREE SOLDERS AND FLUXES. FAILURE TO COMPLY WILL RESULT IN A
REP.LAGEMENT OF THE.SYSTEM. PLUMBING GODE P-509-5.
BUILDER'S SIGNATURE: PHONE: �`f Y'�D� �
ADDRESS: /�o� � � !1O
NOTE: Additional plans and/orinformation may,be�equired,if submitted plans:are not of sufficient clarity or detail,to
indicate the nature and eztent of the work proposed and to determine compliance with all applicable codes and
o�dinances.
In addition to the above,the Building �nspector will be provided with any information relative to commitments made
in ttie zoning process for the property involved. This would include any ADLS and BZA activity.
April, 1996 s:form�mprvlac/perminfo
' BUILDING PERMIT INFOFZMATION
CARMEL-CLAY TOWN:iHIP
Depaftment of.Community :iervices
If tM� infiormafiioe� requ�red'(listed bela.u+r? is insufficientf i�w�lE e�ertd #he;�trae
it takeS tci get an. appro�ied bu'rld�ng permit:;
CARMEL ZONING ORDINANCE°Z-289, SECTION 29.42(3): The Director, Department of Community'Services (or stafQ
sfiall approve or deny the improvement locatiort pe�mR(building permit) witfiin five (5)workinq davs of the receipt:of the
written application form and accompanying materials. The impro4emenl:location permit(building permit) sball'be issued
when the proposed structure, improvementor use and its location conform in all respectsQo this ordinance.
The followinq=must be received bv the Department of Communitv Serviczs before anvbuildina or remodelinq oermit carcbe
reviewed or.issued'bv staff:
1. ONE completed Improvementiocation Permit (Building Permit) application,
2. TWO (2) complete sets of construction plans. Building elevations, foundatiort plan, floor,plan and typical
wall section must be shown. All cross-sectionsmust be.properly detailed and labeled. At lease one cross-
section musYshow R-values of building materials to ensure compliance wi4h the Indiana Energy Codes. lf
minimum R-values are not met on cross-section an Energy Code Gompliance:Worksheet must be`'
completed: If manufactured trusses are used, a diagrarri,must be included with 6uilding plansforall trusses
being used. Truss diagrams must be'stamped with tFie seal of the regisfered architecf or engineer who is
responsible for that design. Only Indiana,registradons,will be recognized. If a commercial construction,
plans!must be stamoed approved bYthe Indiana`State CieoartmenYof'Fire Prevention 8=Buildina Safetv.
Indicate total height of building on plans.
3. ONE copy of sewer permit(from Ciiy of Carmel Engineeering Dept.,'Hamilton Western Utilities or Clay
Regional Sewer District whichever applies), or septic peirmit(Hamiltbn County Health Department).
4. ONE (1) copy of plot plan from subdivision developmenl:plan.
5. TWO (2) copiesof a site plan or,plot plan showing the following REQUIRED"information (can be obtained
from the landowner or developer):
—Name and address,of designer of plan with date
—Name and address:'of owner
—Lot number and subdivision or applicable gen��ral descnption
—Lot drawn to scale—all dimensions
—Scale and north arrow
—LoUProperty lines
—Minimum front building setback line per approved development plan (include all front yard)
—All roads, alleys; rights-of-way, etc.
—All other uUlities and drainage rights-of-way and easements
—Any applicable flood plain area (Elevation Certificate'if necessary)
—Building pad elevation and lot comerelevations
—All accessory buildings—existing or proposed
—All sidewalks and driveways
—Sewer and water lines, septic system (tanks 8 filed.sy§tem) and well location
—Drainage flow arrows
—All drainage swales ahd subsurface;faciiities (reten6oNdetention areas, etc.)
—Sump pump(sump pump pits)sliowing dischargeJocations
—Geothermal;heat pump discharge.loca6ons
Ifland is not within a platted subdidision;a legal description is needed.
ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION