Loading...
HomeMy WebLinkAbout1305.98 Correspondence I CERTIFY THAT ALL OF THE ABOVE LISTED.INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED PLOT OR SITE PLAN AS,SUBMITTED WITH A BUILDING PERMIT APPUCATION TO THE CARMEL-CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. I FURTHER CERTIFY THAT THE JOINING OF WATER SUPPLY PIPING SHALL BE MADE WITH LEAD-FREE SOLDERS AND FLUXES. FAILURE TO COMPIY WILL RESULT IN A REPLACEMENT OF THE SYSTEM.'PLUMBING CODE P-509-5. BUILDER'S SIGNATURE: PHONE: ADDRESS: NOTE: Additlonal plans and/or infortnatlon may be required, if submitted plans are not of sufficient clarity or detail, to indicate the nature and extent of the work proposed and to determine compliance with all applicable codes and orclinances. In addition to the above, the Building Inspedor will be provided with any information relative to commitmeMS made in the zoning process forthe property involved. This would include any ADLS and BZA activity. July, 1993 C:ITEXT1006 dep .� ._., BUILDING PERMIT INFORMATION CARMEL-CIAY TOWNSHIP Department of Community Development CARMEL ZONING ORDINANCE Z-160, SECTION 29,4.2(3): The Building Commissioner (Director, Department of Community Development or staf� shall approve or deny the improvement location perrnit (building perinit) within five (51 workina davs of the receipt of the written application form and accompanying materials. The improvement location pertnit (building permit) shall be issued when the proposed structure, improvement or use and its locadon conform in ail respects to this ordinance. The followinq must be received bv the Deoartment of Communitv Development before anv buildinq or remodelinq permit can be reviewed or issued bv staff: 1. ONE completed Improvement location Permit (Building Pertnit) application. 2. TWO (2) complete sets af construction plans. Building elevations, foundation plan, floor plan and typical wall section must be shown. All cross-sections must be properly detailed andJabeled. At lease one cross- section must show R-values of building materials to ensure compliance with the Indiana Energy Codes. If minimum R-values are not met on cross-section an Energy Code Compliance Worksheet must be completed. If manufadured trusses are used, a diagram must be included with buiiding plans for all trusses being used. Truss diagrams must be stamped with the seal of the registered architect or engineer who is responsible for that design. Only Indiana registrations will be recognized. If a commercial construction, plans must be stamped approved bv the Indiana State Deoartment of Fire Prevention 8 Buildina Safetv. Indicate total height of building on plans. 3. ONE copy of sewer permit (from City of Cartnel Engineering Dept., HamiRan Westem Utifities ar Ciay Regional Sewer District whichever applies), or septic pertnit (Hamiiton County Health Department). 4. ONE (1) copy of plot plan from subdivision development plan. 5. THREE (3) copies of a site plan or plot plan showing the following REQUIRED infortnation (can be obtained from the landowner or developer): —Name and address of designer of plan with date —Name and address of owner —Lot number and subdivision or applicable general description —Lot drawn to scale — all dimensions —Scale and narth arrow —LoUProperty lines —Minimum front building setback line per approved development plan (nclude all front yard) —All roads, alleys, rights-of-way, etc. —All other utilities and drainage rights-af-way and easements —Any applicable flood plain area (Elevation Certificate if necessary) —8uilding pad elevation and iot corner elevatlons —Ali accessory buildings — existing or proposed —All sidewalks and driveways —Sewer and water lines, septic system (tanks 8 filed system) and welt location —Drainage flow arrows —All drainage swales and subsurface facilities (retention/detention areas, etc.) —Sump pump (sump pump pits) showing discharge locations —Geothermal heat pump discharge locations If land is not within a platted subdivision , a legal deseription is needed. ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION If this irAortnation i� not submitted, it will extend the tone it takes to get an approved building pertnit