Loading...
HomeMy WebLinkAbout1314.98 Correspondence I CERTiFY THAT ALL OF THE ABOVE USTED INFOR�+AAA'fION IS SHOWN COMPLETELY ANO ACCURATELY ON Tf-'E ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A 6UI�plNG PEFtMIT RPPLSCATION TO THE CARMEL-CLA'? DEPARTMENT OF COMMUNITY SERVICES. I FURTHER CERTIFY THAT THE JOINING OF WATER SUPPLY PIPING SHAL1.BE MADE WITH LEAD-FREE SOLDERS AND FLUXES. FAILURE TO COMPLY WILL RESUIT IN A REPIACEMENT OF THE SYSTEM. PLUMBING CODE P-509-5. BUILDER'S SIGNATURE: A.../.� `.,.�� �"�--- PHONE .YYJ �O�!O ADORESS: Y�/ � =� �✓c �/� G<i..,�/ .I,✓. Y603�Z NOTE: Additional plans and/or infartnation may be required, if submitied plans are not of suffident clarity or detail,to indicate the naGire and eztent of the wortc proposed and to determine compliance with all applipble codes and ordinances. In addi�on to the above, the Building Inspecfor will be provided with any infortnation relative to commitrnents made in the zoning process for the property imoived. This would include any ADLS and BZA activity. Departrnent of-Cornmunity Services One Civic Square (317) 571-2444 a:r«,,,alFnprv�or.oe�ro rc,,. ,,Ae � E3UILDING PERMIT INFOF�MATION CARMEL-CLAY TOWNSHIP Department of Community Sen�ces If'fihe irtforma�ion requiKecf ([FSt�d belQw� is: insr�ffcien�, it wiil e�ne� �he ti�ne ifita�C�s tc� gefan ap;provec� buEfclzng.pe�� CARMEL ZONING ORDINANCE Z-289, SECI'ION 29.42(3): The Director, Department of Community Services(orstafn shall approve or deny the improvement location permit(building permit) within five (5)workina davs of the receipt of the written applicadon forin and accompanying materials. The improvement location permit(building permit) shall be issued when the proposed structure, improvement or use and its location conform in all respects to this ordinance. The followinq must be received bVthe Deoartment of Communitv Services before anv buildina or remodelina �ermit can be reviewed or issued bv staff: / � 1. j/ONE completed fmprovement Location Permit(8uilding Permit) application. 2. `_ON_C�(2)-cam�feEe-sets-oi-cons n_plans._Buil i g elevations, foundation plan, floor plan a d pical v>all se:tion m;;.=t be siio�-;n. '-.n crc:s-sections m e properly detailed and labeled. At lease one cross- section must show R-values btfi4di s to ensure compliance with the Indiana Energy Codes. If minimum R-values are not met on cross-section an Energy Code Coinpliance Worksheet must be completed. If manufactured trusses are used, a diagram must be included with building plans for all trusses being used. Truss diayrams must be stamped wiih the seal of the registered archt:ect cr engineer who is responsible for that design. Unly Indiana registrations will be recognized. Jf a commercial construction, nlans must he stamne�! anp�oveci_hv the Indiana State Department of Fire Prevention 8 Buildina SafeN Indicate total height of building on plans. 3. O E y of se�er.�nd(from C' fiCarme!-€agiae ' , a ' stem..11gli�esvr Clay ona r District�bie ver applies), or sepbc permft(Hamilton County Healtfi Department). 4. copy lo roms ' �opmentl plan. 5. TWO (2) copies of a site plan or plot plan showing the following REQUIRED information (can be obtained from the landowner or developer)' �� —Name and address of designer of plan with date —Name and address of owner —Lot number and subdivision or applicable general description —Lot drawn to scale—all dimensions —Scale and noRh arrow —LoVProperty lines -Minimum front building setback line per approved development plan (nclude all front yard) —All roads, alleys, rights-of-way, etc. —All other utilities and drainage rights-of-way and easements —Any appiicatife ftood plain area (Eleva6on Certificata if necessary) —Building pad elevabon and lot comer elevafions —All accessory buildings— ebsting or proposed —All sidewalks and driveways —Sewer and water lines, septic system (tanks&filed system) and well location —Drainage flow arrows —All drainage swales and subsurtace facili�es (retention/detenUon areas, etc.) —Sump pump (sump pump pits) showing discharge locations —Geothermal heat pump discharge IocaUOns N land is not within a platted subdivision, a legal description is needed. ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION