Loading...
HomeMy WebLinkAboutCorrespondence e e C1 EL June 16, 2005 ]ANIES BRAINARD, MAYOR Mr. Mark T. Monroe Wooden & McLaughlin, LLP One Indiana Square, Suite 1800 Indianapolis, IN 46204-4208 RE: Blue Ridge Estates Primary Plat-Project Review #1 Dear Mr. Monroe: We have reviewed the primary plat submitted for this project for review for the June 22, 2005 Technical Advisory Committee. We offer the following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Streets and Right of Way (Shelbome Road) - City of Carmel. . Water - City of Carmel Utilities . Sanitary Sewers - Clay Township Regional Waste District . Storm Sewers/Drainage - Hamilton ~ounty Surveyor's Office (City of Carmel Review). . Regulated! Legal Drains - Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements: . Water Availability approval from the Board is based upon the total number of single-family residences @ 1.0 EDU/single family residence. If entryway or other community irrigation systems are planned, these will also require additional Water Availability approval from the Board and additional Water Connection Fees will be assessed. . Residential Curb Cut Approval will be required, regardless if there is one driveway serving three lots or three individual driveways. Please provide drawings of the driveway( s) with the request for Board approval. The drawings should include all pertinent dimensions (throat width, overall width, radii, right of way lines, edge of pavement, location of all existing opposing driveways, etc. . Temporary Construction Entrance (if applicable and if located at a location other than planned permanent entrances) . Please be advised tltat any open cuts of existing perimeter-dedicated streets will require separate Board of Public Works and Safety approval. . Any permanent improvement (including irrigation systems) to be installed within dedicated right of way or dedicated easements. This approval would require a Consent to Encroach Agreement between the Owner and the City of Carmel. . Secondary Plat approval. . Right of Way Dedication (if applicable) A schedule for Board of Public Works and Safety meeting dates is enclosed for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to tlte Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals (ifapplicable) and completion of review by tlte Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or the Board of Zoning Appeals (if applicable). 4. T.A.C. Review/Drawings submitted for approval: DEPARTwlENT OF ENGINEERING ONE CMC SQUARE, CAR\IEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 El\1AlL engineering@ci.carmel.in. us e e Mr. Mark T. Monroe June 22, 2005 Blue Ridge Estates Primary Plat-Project Review #1 Page 2 of5 We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Pinal drawings will not be approved for construction until all Engineering Department, Carmel Utilities and Hamilton County Surveyor's Office issues have been resolved. The design engineer must certify all drawings submitted for final approval. Because of the dual jurisdiction between the City of Carmel and the Hamilton County Surveyor, we will require a minimum of eight-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and by Carmel Utilities. The eight-sets will then be sent to the Hamilton County Surveyor's Office for approval and signatures. Three approved sets are to be returned to the City of Carmel. The Hamilton County Surveyor's Office will retain two-sets. The Developer, the Engineer and the Contractor will each receive one-set. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or dedicated easements will require a Consent to Encroach Agreement with the City of Carmel's Board of Public Works and Safety. 6. Carmel Utilities/W ater Distribution should be provided copies of all'drawings and revisions for review of water issues. They will provide a separate review regarding these issues. 7. Carmel Utilities does subscribe to "Holey Moley" and they should be contacted directly for all water main locations. 8. We are enclosing copies of the following: . Subdivision Project Approval Procedures . Performance Release Procedure . Subdivision Building Permits . Permit Data, Contacts, etc. BONDING REQUIREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performance GuaranteeslEngineer's Estimates Individual Performance Guarantees will be required for the following subdivision improvements: . Perimeter Street Right of Way Improvements if applicable (right of way pavement including accel, decel, passing blister, widening, stone shoulders, striping, multi-use asphalt paths, etc.) If applicable, Storm Sewer/Drainage and Monument & Marker bonding will be under the jurisdiction of the Hamilton County Surveyor's Office. Sanitary sewers are under the jurisdiction of the Clay Township Regional Waste District. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineers Estimates for each improvement including unit costs, quantities, materials and types of materials, etc. Upon completion and release of individual Performance Guarantees, a three-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please reference the enclosures for more detailed explanation of our procedures. Right of Way Permit and Bonding Any work in the dedicated right of way ofShelbome Road will require a Right of Way Permit. If the work is included in the scope of work of a posted Performance Guarantee, no additional bonding will be required. If it is not included, a License & Permit type Right of Way bond will be required in the amount of$2,000.00 per instance of work in the right of way. Any open cut in the pavement of either Towne Road or 141 st Street will require separate Board of Public Works and Safety approval. 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. e e Mr. Mark T. Monroe June 22, 2005 Blue Ridge Estates Primary Plat-Project Review #1 Page 3 of5 When construction plans are submitted for review for this development, please provide 2-sets of plans and calculations to allow us to send the extra set to Crossroad to save some time in the review process. AVAILABILITY AND CONNECTION FEES 11. Availability ( acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to the start of construction activities. Availability Fees are based upon total platted acreage for the development at the current rate of$1,010.00 per acre (Water Availability Fee). Based upon the primary plats indicated acreage, the following Water Availability Fees would apply: 5.99 Acres @ $1,010.00/Acre = $6,050.00 Connection Fees are currently $1,310.00 for water per single-family residence. Connection Fees are paid when the infrastructure has been complete, satisfactory test results obtained and the subdivision has been released for permits. Water Connection Fees are paid on a per-lot basis. . If an irrigation system is planned for this development, additional Water Connection Fees will be assessed based upon the recommendation of the Director of Carmel Utilities. PRIMARY PLAT COMMENTS 12. Please provide monuments at the external comers. 13. The Department of Engineering will not approve individual driveways for each of the three lots. Please revise so that all lots are accessed from one street or common driveway off Shelbome Road, or provide access to Blue Ridge Estates from an adjacent development. If access from a single street oh Shelbome Road is provided, please locate the proposed access point so that its intersection with Shelbome Road is at least 500 feet from adjacent intersections or align the street with any streets on the west side of Shelbome Road. Because this is such a significant revision, the Department of Engineering will provide a more complete review and further comments after the revision is completed. 14. The access point may only be 30 feet maximum measured face of curb to face of curb. 15. Please contact Crossroad Engineers to obtain drainage review checklist for consideration in developing secondary plat and that design effort. The Department would expect the secondary plat ancl, construction drawings submitted to conform to the requirements of the checklist. 16. Please provide detention volume for the fully developed site and for the fully developed thoroughfare plan right-~f-way for the Shelbome Road frontage. This requirement shall apply regardless of watershed limits. Please provide adequately sized pipes to carry water from the street to the proposed ponds. 17. Thank you for maintaining the roadside drainage. How does this drain? 18. Sheet C102 Please remove "TO BE CONSTRUCTED IN THE FUTURE" from the note "10' ASPHALT PATH TO BE CONSTRUCTED IN THE FUTURE." The asphalt path construction needs to be accomplished when the rest of the subdivision construction is accomplished. 19. If off-site easements will be necessary to install the utilities, these easements must be secured prior to the Department of Engineering approving the drawings. 20. Have the three septic fields been approved? 21. Please remove Sheet LID 1, Tree Preservation Plan, from plans submitted for approval by the Department of Engineering. The Department of Engineering does not approve the Tree Preservation Plan. 22. In Land Description on back sheet, please provide net acreage. 23. Please indicate a comer cut that will accommodate a 120- foot radius roundabout centered at the intersection of 121 st Street and Shelbome Road. The Department requires that the Developer dedicate this right-of-way. The Department understands that this dedication will go through the Board of Public Works in the future but needs the right-of-way to be shown on the plans to ensure that the site plan is able to accommodate the future construction. e e Mr.. Mark T. Monroe June 22, 2005 Blue Ridge Estates Primary Plat-Project Review #1 Page 4 of5 24. If access to this subdivision is from Shelbome Road, please provide an acceleration lane, a deceleration lane, and passing blister at the entrance. The dimensions of these auxiliary lanes should conform to the requirements of the 20 Year Thoroughfare Plan functional classification. 25. Please indicate widening across the property frontage or to the extents of the auxiliary lanes, whichever is greater for I5-foot travel lanes on the property side of Shelbome Road. Auxiliary lanes shall be measured from the edge of the 15-foot travel lane. Please add a note to the site plan that all existing pavement shall be saw cut to a clean edge where new pavement (for widening or for auxiliary lanes) is to be installed adjacent to existing pavement. Any new pavement placed in the Shelbome Road right-of-way for widening, for auxiliary lanes and for each entrance up to the mainline right-of-way limit shall meet the following section: 1.5 inches HMA #11. surface on 2 inches HMA #8 binder on 3 inches HMA #5D base on 7 inches #53 stone on 4 inches #2 stone or match existing, whichever is greater. Please delineate this section with hatching on the plans and appropriate reference in the legend. 26. The City typically requires 1" milling with 1.5" R.A.C. #11 resurfacing for the entire width of the existing roadway across the property frontage or to the limits of the auxiliary lanes, whichever is greater. The roadway would then also need to be restriped with thermoplastic striping. Please develop a plan for the restriping and for striping of the auxiliary lanes. Please add a note to this plan that all striping shall be thermoplastic. Please delineate the milling and resurfacing areas with hatching on the plans and appropriate reference in the legend. 27. Please add an Asphalt Path Detail that requires 1 inch HMA #11 surface on 2 inches HMA #8 binder on 5 inches #53 stone. 28. All paving within the existing and proposed City right-of-way shall conform to the requirements of the Department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre-construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right-of-way. 29. A three-foot wide #73 stone shoulder at a minimum depth of six inches is required across the property frontage or to the limits of the auxiliary lanes, whichever is greater. Subsurface drain is required beneath the stone shoulder. 30. Please provide concrete curb within the right-of-way at the entrance. 31. Please establish Base Flood Elevation and Flood Hazard Areas of Brendle Drain. FFE, including basement FFE and any structure openings (windows, doors, etc.) must be 2 feet above 100-year elevation of flooding source. Refer to City flood hazard area ordinance. 32. Please show the proposed access on the primary plat and indicate how roadside drainage will be maintained under the drive (pipe must be sized to convey upstream watershed, not simply a 12" drive culvert). These comments represent the Department of Engineering's initial review of the primary plat for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews and on the grading and drainage system upon receipt of drainage calculations and more detailed construction drawings