Loading...
HomeMy WebLinkAbout1328.98 Correspondence I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURA'fELY ON TFi� ATTFCHED PLOT OR SITE PI.AN AS SUBMITTED WITH A BUILDING PERMITAPPLJCATION TO THE CARMEL-CLAY DEPARTMENT OF COAMAUNITY SERVICES. I FURTHER CERTIFY THAT THE JOINING OF WATER SUPPLt'P{P;NG SHALL BE MADE WfTH LEAp-FREE SOLDERS AND FLUXES. FAILURE TO COMPLY WILL RESU�T IN A � REPLACEMENT OF THE SYSTEM. PLUMBING CODE P-509-5. BUILDER'S SIGNATURE�_� �/�.f' �t�l J/��� PHONE ✓ / � ��J� ADDRESS: NOTE: Additional plans and/or information may be required, if submitted plans are not of suffident clarity or detail,to indicate the nature and extent of the work proposed and to determine compliance witti all applicable codes and ordinances. In addition to the above,the Building Inspedor will be provided with any infortnation relative to commitrnen�made in the zoning process for the property imoNed, This would includa any ADLS and BZA activity. Departrnent of�ommunity Services One Civic Square (31� 571-2444 3:r«mykrprHOUVmmro re�. „rse ; - " BUJLDING PERMIT INFORMATION CARMEL-CLAY TOWNSHIP Department of Community Services L: Y. . ': `: ' )i �- :' :: :' If fihe �n�orma�on r�qu�red ([FSted below} ; �s �nsuffcienf, �t_w�ll < , ; , ,.; ex�end fhe fime �t taKes fQ,ge� arr approved but[drr�g pe�tn�t CARMEL ZONING ORDINANCE Z-289, ScCTION 29.4.2(3): The Director, Department of Community Services (or staffj shall approve or deny the improvement location permit(building permit) within five (51 workina davs of the receipt of the written application form and accompanying materials. The improvement location permit(building permit) shall be issued when the proposed structure, improvement or use and its locatlon conform in alI respects to this ordinance. The foliowina must be received bv the Department of CommunitY Services before anY buildinq or remodelinq permit can be reviewed or issued bv staff: 1. ONE completed Improvement Locabon Permit (Building Permit) application. 2. TWO (2) complete sets of construction plans. Building elevations, foundation plan, floor plan and typical wall section must be shown. All cross-sections must be properly detailed and IaC�led. At lease one cross- section must show R-values of building materials to ensure compliance with the Indiana Energy Codes. If minimum R-values are not met on cross-section an Energy Code Compliance Wo:ksiieei rnust oe completed. If manufactured trusses are used, a diagram must be included wi�h building plans for all trusses being u:�A. Truss diagrams must be stamped wRh the seal oi tlie reyistered archRect or engineer who is res�onsible for that design. Only Indiana regisVations will be recognized. If a commercial construction, plans must be stamped approved bv the Indiana State Department of Fire Prevention & Buildinq SafeN Indicate total height of building on plans. 3. ONE copy of sewer permit(from City of Carmel Engineering Dept, Hamilton Western Utilities or Clay Regional Sewer District whichever applies), or sepbc permit(Hamilton County Health Department). 4. ONE (1) copy of plot plan from subdivision development plan. 5. TWO (2) copies of a site plan or plot plan showing the following REQUIRED in(ormation (can be obtained from the landowner or developer): —Name and address of designer of plan with date —Name and address of owner —Lot number and subdivision or applicable general description ' —lot drawn to scale—all dimensions —Scale and north arrow —LoUProperty lines —tvlinimum front building setback line per approved development plan Qnclude all front yard) —All roads, alleys, rights-of-way, etc. —All other utilities and drainage rights-of-way and easements —Any applicable flood plain area (ElevaOon Certificate if necessary) —Building pad elevation and lot comer elevabons —All accessory buildings— ebsting or proposed —All sidewalks and driveways —Sewer and water lines, septic system (tanks & filed system) and well location —Drainage flow arrov+s —All drainage swales and subsurface facili�es (retention/detenbon areas, etc.) —Sump pump (sump pump pits) showing discharge locabons —Geothermal heat pump discharge loca�ons If land is not within a platted subdivision, a legal description is needed. A�L CONSTRUCTION IS SUBJECT TO FIELD INSPECTION