HomeMy WebLinkAbout05110080-Sq. Ft. k. A sidewalks and drveways
I. Sewer and water lines, sept c system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc..)
o. Sump pump -- Show sump
p. Geothermal heat
*NOTE: %f land is not withi 'equired.
FURTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289~ SECTION 29,04.02 (3). The Director shall approve or deny ~he Improvement
Location Permit with n five (5) workir~g days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall b,,e issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance.
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WlTH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED THIS WOULD INCLUDE ANY PLAN COMMISION, BOARDOFZONINGAPPEALS~AND/ORDEPT, OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED,
ADDI~ONAL INFORMATION MAY BE REQUESTED BY~ AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMITI'ED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL AppI ~CABLE CODES AND ORDINANCES,
SUBMI'rTAL OF ADDI~ONALLY REQUESTED/REQUIRED INFORNATION, AFTER THE INITIAL SUBMI'rTAL, ~/[LL
EXTEND THE TIME IT TAKES COMPLETE THE PERM1T REVIEW.
THE OFFICE OF BUILDING & ,C, ODE ENFORC.E,?,ENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCT[ON PLANS AS A BONUS ROOM' TO BE SPACE. IF AN A~RFE~[ SO
LABELED IS TO BE A FINISHED SPACE~ CONSTRUCFJ,O, N PLANS MUST BE LABEEED ACCORDINGLY. I IT IS
DETERMINED THAT AN UNFINISHED~ BONUS ROOM AREA IS TO BECOME A FINISHED AREA AFTER THE
~F THE PERN__~_~_,~ THE PLANS AND PERM1T RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
on the