Loading...
HomeMy WebLinkAboutE&B Paving/Street/CO 1/increase $113,531.98/Street Paving CITY OF CARMEL TO: City of Carmel CONTRACT CHANGE ORDER NO.: 1 Board of Public Works DATE:12/10/13 One Civic Square PROJECT NAME: 2013 Paving Program Carmel, IN 46032 CITY PO NO.:31253 I. You are directed to make the following changes in this Contract: (Brief Description) ITEM AMOUNT (+) OR (-) DAYS O act II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: X W.D.C. No.: • Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,691,069.53 Contract Price will be increased/decreased by this Change Order $ 113,531.98 New Contract Price including this Change Order $ 1,804,601 .51 Contract Time Prior to this Change Order Days Completion Date Net increased/decreased resulting from this Change Order Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Acce ted: ft C■hy F ('ai Lusk-3e c E 1 � PA I . / 1 Project Manager CONTRACTOR /4. • s Brai' .rd, M. 0. r z c;.r;r; Sov,a_r Irie 2 AIDDLE'�okJ4 Qbtt if Address dOr&eLEss S VIL-( I401z) Mary A n'Bur " e Member W C siwe jV T,n1 i City/State/Zip City/State/Zip Lori Wason Member B-120/ / 6,e-,e By5 ty G _e0 eg-mki-w ATTEST: Z � i �� (pri ame) (print kr M�3�t� Gr_r.�u4 aJzzL 4 . (signature ( . ature Phone: 3/7- 7/¢-goCe Phone: 311- PC" `q'c2 Tana Cordray, Clerk-Treasurer Date: /2-/ 7— /3 Date: /2- "13 Date: /-/ - David Huffrha Street C missioner Date: /e /6 ao/3 9, E&B PAVINQ.inc .., World-Class Solutions at a Local Level' ITEMIZED QUOTE Date September 18, 2013 Owner City of Carmel Project Turn Lanes on Hazel Dell Parkway Address Location S of 131st St City/State/Zip Carmel, IN City Carmel Attn Dave Huffman, Dan Greskamp Phone Fax E & B Paving would like to submit price quotations for the following items: Biditem Bidltein Description Unit Unit Price BldiEem Total _ _—. Quantity 1 CLEARING R/W 1.000 LS $5,500.00 $5,500.00 Includes removal of trees and other items in Right of Way to be removed prior to construction 2 COMMON EXCAVATION 374.000 CYS $46.51 $17,394.74 Includes the excavation of both turn lanes, backfill of the new curb and finish grading. 3 CURB REMOVAL 550.000 LF $11.54 $6,347.00 includes removal and disposal of existing chairback curb 4 TYPE III CURB 525.000 LF $19.31 $10,137.75 includes placement of new 2' Chairback curb in both turn lanes 5 TYPE 0 STONE 252.000 TON $25.78 $6,496.56 Includes placement of stone base (5" south leg and 12" north leg) in the turn lanes 6 GEOGRID 270.000 SYS $5.93 $1,601.10 Includes the placement of the geogrid at the bottom of the n turn lane 7 3, 64, 25mm BASE 312.000 TON $87.73 $27,371.76 Includes the various lifts of base material per the provided pavement sections 8 PETROMAT 539.000 SYS $3.95 $2,129.05 Includes the 2 layers of the petromat specified on the n turn lane. The mat will be adhered with .50 gal/sys of 551-H Tack 9 5, 76, 19mm OG'S 74.000 TON $95.63 $7,076.62 Includes the various lifts of Open Graded asphalt material per the provided pavement sections 10 3, 70, 19mm INTERMEDIATE 60.000 TON $112.61 $6,756.60 Includes the 2" lift of Intermediate asphalt material per the provided pavement sections 11 3, 70, 9.5mm SURFACE 30.000 TON $188.07 $5,642.10 Includes the 1" lift of Surface asphalt material per the provided pavement sections 12 RESTORATION AND SEEDING 100.000 SYS $15.15 $1,515.00 Seeding and mulching of disturbed areas. 13 MAINTENANCE OF TRAFFIC 1.000 LS $9,230.00 $9,230.00 Includes all material, supplies and signage necessary for the maintenance of traffic. One lane in each direction will be closed during the construction of the new lanes. The median crossing will be opened each night for access. AN EQUAL OPPORTUNITY EMPLOYER 17042 Middletown Ave. • Noblesville, IN 46060 Page 1 of 2 PHONE:317.773.4132 • FAX: 317.773.4137 www.ebpaving.com ASPHALT MD CONCRETE GlnaliTiCCE E&B PAVING.inc (CM,0,79. World-Class Solutions at a Local Level" 14 CONSTRUCTION ENGINEERING 1.000 LS $4,979.70 $4,979.70 Includes layout of new lanes and excavation 15 ONLY, WHITE,THERMO 2.000 EA $189.00 $378.00 16 ARROW, LEFT, THERMO 2.000 EA $283.00 $566.00 17 LINE 4" SOLID THERMO 200.000 LF $2.05 $410.00 Bid Total: $113,531.98 Please note the following: 1 The above work is based upon being completed on weekdays and in the 2013 construction season. 2 Winter weather protection for concrete work is not included in the above prices. 3 A signed quote or contract is necessary before E & B Paving can begin work 4 E&B Paving is not responsible for any utility relocations 5 Work subject to existing drainage conditions Please contact our office if you have any questions or if we can be of any further assistance. Sincerely, E & B avl Inc. Accepted By: Ji ilr-c 4---- Title: Broermann Project Manager Date: Terms: A 1 ''/;% monthly finance charge may be applied to all past due accounts.This computes at an annual percentage of 18%. If any amount due for services or materials provided by E&B Paving, Inc. is not fully paid within 30 days from the date such services or materials were provided, it is agreed and understood that all costs and expenses including but not limited to attorney fees incurred by E&B Paving relating to the collection of such amounts will be recoverable by E&8 Paving." AN EQUAL OPPORTUNITY EMPLOYER 17042 Middletown Ave. • Noblesville, IN 46060 Page 2 of 2 • PHONE:317.773.4132 • FAX:317.773.4137 www.ebpaving.com ASPHALT MD cONEREITIE CONITLRACITLO.RS