At the request of Weber Concrete Construction, I inspected the new basemenl for the home
just started ha the new Aberdeen Bend development. The project had been red tagged by the
City of carmel because the walls had not been braced prior to backfilling.
My inspection revealed that the walls are square, stralghl, and plumb, The walls have
numerous comers that act as buttresses to stiffen the walls. I saw no signs of crackh~g.
; opemtion.
~' yours,
Professional Engineer
Copy: Mr. JeffWeber
Weber Concrete Consm~cfion
Box 837
Zionsville. IN 46077
5, 2005 2:50 PM
N
September 3.5.2005 2:44 PM
Release
Mr. Terry of Arbor Homes is reporting that Carmd Utilities is okay with an early
rele.ase o~ a building permit for lot 9 of the Aberdeen Bend subdivision. I need to verify
this -so that we can gO ahead and issue a water connection permit for the site.
Enforcement
571-2499
13, 2005 10:51 AM
!arly Release
Release
obtained a conditional permit from them.
.in.gov]
:othis subdivision?
09/I5/2005
Thanks for you
Mike T.
"niket@ArborHomesLLC.com]
10:34 AM
~ay; Terry Reeser
g. It involves some
N
19, 2005 8:22 AM
release ILP.
amp, Dan
is reporting that the Engineering requirements needed to get
· Jr lot ~c of Aberdeen Behd are complete· I am
will knoTM when to begin the review process.
~:miket@ArborHomesLLC.com]
10:34 AN
r early release and suggested I contact you
may have not been delivered but should
It involves some bamer protection on
Mike
09/19/2005
Mike Terry
From: Hoyt, Gary A [Ghoyt~carmel. in.gov]
Sent: Tuesday, August 23, 2005 2:55 PM
To: Lillard, Sarah N
Cc: Mike Teny
Subject: Aberdeen Subdivision
Sarah,
I spoke with Mike of Arbor Homes and told him I would go out to the general site and take a look at the closet fire
hydrant. I found one directly across from the drfve leading into the site. Mike also told me ~hat pavement should
be in by Fdday, as of now there are curbs in and gravel. The developer is hoping permanent water with be tested
and in service within bvo weeks. I feel comfortable in allowing them to start their model, as I have a water supply
in proximity,
Thanks you,
Gary Hoyt
Fire Marshal
Carmel Fire Prevention Bureau
317.57 f'2600~n ' Office
3~7-57~-2674 - Fax
8/30/2005
_LC.com]
7:01 AM
ical building
a on the north and
) cover permit expenses.
eve JDH
are in order? is that about the
ks for your help.
· ' A
M, Weddlngton, Trudy .
M~. Terry,
n you mean?
ce ks regards
sting
tinge. I
appears to be a
has been
a
2all 1SSU~
Ple
to the ~
: City of
packet that is not
~r company, and copies of three
we cannot be
been approved to use the
release. Until that time. we will hold
Again, though the extra paperwork and blank
~mmediately. If you l~ve any furtl{~r questions please
contact me again.
ber 15, 2005 2.18 P
So the next
15. 2005 3:13 PM
S; Dolan. Veronica A: Stewart, Lisa M; Weddington, Trudy A.
with the Planning
1.31C
Building & Code Enforcement
City of Carmel
Ph, (317) 571-2475
Fax (317) 571-2499
slilla~:d(~4canne Lin.g~v
..... Or. iginal ~essage .....
Fro~: Nike Terry [mailto:miket@ArborHomesLLC.com]
.~e.nt: Thursday, ~ptember 15, 2005 2:18 PM
To~ Lillard, Sarah N .
CC; Bren.nan, Kevin S; Don Chesney; Terry Reeser
Subject: Permit AvailabilitY
Sarah:
Infrastructure mprovements are nearing completion at Aberdeen and Hayden Run. So the next question
will be when we can apply for and receive building permits? I would greatly appreciate it if you would
please respond to me as by tomorrow morning, Thanks,
Mike Terry
August 30, 2005
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
Attn.: Kevin Brennan
Re: Aberdeen Bend, Lot #9- Early Release
Dear Kevin:
We formally submit in order to obtain an early release for our model The purpose for
this early release is to take advantage of the current weather conditions to dig and pour
the basement. As I am sure you are aware, even a month can make a huge difference
going into the autumn and winter season especially when excavation, basement pours
and concrete curing is involved. Our request is also based upon the fact that all the
necessary infra-structure is in place which will support this request. The single
exception, aa I discussed yesterday with Mr. Gary Dunkin with the City Engineer's office,
involves the lack of pavement throughout the entire section which, according to Mr.
Dunkin ia a policy of the City Engineer's office. Nevertheless, policy notwithstanding, we
are willing to commit to placing barricades at the end of the paved section to protect the
subgrade. Further we will also commit to restricting work to the necessary erosion
control measures, dig, form and pour the basement and framing only. Any additional
activity will require that the remainder of the section he paved up to the binder course.
In addition to this letter please find enclosed: Executed Application,
I confirmed the address with Mr. William Akers as 13075 Aberdeen Way,
Four copies of the Plot Plan,
Two full sets of architectural plans with a copy of the typical wall section and
truss details,
A conditional sewer permit,
I confirmed with Mr. Paul Pace that water service was not an issue and I also
confirmed with Mr. Gary Hoyt that fire protection was not an issue as well (e-mall
copy enclosed),
I also confirmed with Pam Day with Equicor that all the appropriate availability
fees have been paid.
To repeat, our request is to take advantage of the late summer weather to install the lot
erosion control, basement and frame the structure only. The time required for these
three activities alone will cover the time Pam Day with Equicor has indicated it will take
to completely pave the section by the end of September.
~LLC
with any comments or questions. I
file
P:~ProjectslAberdeentLtr. CarmeI. KBmnnan-LotgEarlyReleaseSub.8.30.OS. doc