HomeMy WebLinkAbout05100172-Sq. Ft. k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. AIIdrainage swales and subsurface facilities (retention / detention areas, etc...)
o Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump discharge ocations
*NOTE: ~[f land is not within a platted subdivision, a legal description is required.
CARMEL ZONING ORDINANCE Z-289, SECT]ON 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five {5) working days of the receipt of the written application form and accompanying
materials. The Improvement Locat on Permit shall be,, issued when the proposed structure, improvement, or use and
ts ocat on conform in all respects to this ordinance.
IN ADDITION TO THE ABOVE-L~STED SUBMi'[TALREQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
'ACTH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED, THIS vVOULD INCLUDEANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADDI~ONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROWDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOT OE SUF~CIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE Wl'I'H ALL APPLI:CABLE CODES AND ORDINANCES.
SUBMI-I-rAL OF ADDI~ONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITrAL, WILL
EXTEND THE T~ME 1T TAKES COMPLETE THE PERMIT REVIEVV.
THE OFF~CE OF BUILDING & ,C, ODE ENFORC.E,~ENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A BONUS ROOM TO BE - i. - UPIABLE UNFZNISHED SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THATAN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE_
I ; - E. FTHEPERMIT THEPLANSANDPERMITRECORDSMUSTBEUPDATEDATTHEOFF~CEOFBUILDING&
CODE ENFORCEMENT.
ALL CONSTRUCT[ON [S SUB3ECT TO FIELD ZNSPECT~ON, AND SHOULD NOT BEGt'N PRIOR TO THE
1~SSUANCE OF THE BU]~LDING PERMZT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BL/ILDI NG & CODE ENFORCEMENT; CITY OF CARMEL. One Civic Sc].; Carmel. IN 4~O32. Pi]. ¢317) 571-2444.
~, the undersigned, certify that is shown completely and accurately on the
ttached plot or site plan(s), construction plans, and any other submitted documentation, submitted with the
building permit applicatio~ to the City of Carmel / Clay Township Department of Community Services. ! further
certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply
will result in a replacement of the system. (Plumbing Code P-509-5) Under the penalties of Perjury (Indiana
Code 35-44-2-1)~ ! also hereby affirm, under oath, that all of the information ! have provided n the table below is
true and accurate, tO the best of my knowledge and belief, and that ! have not knowingly or intentionally
prov ded or omitted any information that would tend to hide, obscure, or ( of
Community Services regarding the truth of the matters addressed therein.
S:Permi~/FORHS/RESIDENT'-.ALPROCEDURES 2of2