Loading...
HomeMy WebLinkAbout05110097-Building PlansScope of Work September 2, 2005 Gary and Debbie Haire 12421 Bay Hill Drive Carmel, IN 46032 Good until: October 3, 2005 material, labor and supervision necessary to Complete the Basement Renovations , Install and maintain floor protection and dust barriers as needed · Demo and/or remove the following; carpeting, drywall and stud wall at steps and treads to new wall opening · Provide 20 yard dumpster for construction debris · Frame in walls in craft room . Insulate and drywall walls in croft room · Electrical o Install 15) 6" can lights in game room and media room o Install2) hockey puc lights in wet bar cabinet o Provide and 2) pendent lights at wet bar - Rough in plumbing for wet bar sink - Interior trim o Installbase and case to match existing in craft room, media room and garde room o Install 2) columns at media room entrance o Install oak open end treads at steps o Install new balustrade at steps - Cabinetry o Provide and install wet bar as l~t drawm4g o Provide and install granite counter tops o Provide and install entertainment center per drawing o Craft room desk and counter top o Provide and instal124" deepM84' tall white storage cabinets per · Flooring o Provide and install new carpeting 620 sqft o Provide and install VCT flooring for craft room o Paint walls, ~ and trim as needecl o Stain balustrade to match existing