September 2, 2005
Gary and Debbie Haire
12421 Bay Hill Drive
Carmel, IN 46032
Good until: October 3, 2005
material, labor and supervision necessary to Complete the
Basement Renovations , Install and maintain floor protection and dust barriers as needed
· Demo and/or remove the following; carpeting, drywall and stud wall at steps
and treads to new wall opening
· Provide 20 yard dumpster for construction debris
· Frame in walls in craft room
. Insulate and drywall walls in croft room
· Electrical
o Install 15) 6" can lights in game room and media room
o Install2) hockey puc lights in wet bar cabinet
o Provide and 2) pendent lights at wet bar
- Rough in plumbing for wet bar sink
- Interior trim
o Installbase and case to match existing in craft room, media room and
garde room
o Install 2) columns at media room entrance
o Install oak open end treads at steps
o Install new balustrade at steps
- Cabinetry
o Provide and install wet bar as l~t drawm4g
o Provide and install granite counter tops
o Provide and install entertainment center per drawing
o Craft room desk and counter top
o Provide and instal124" deepM84' tall white storage cabinets per
· Flooring
o Provide and install new carpeting 620 sqft
o Provide and install VCT flooring for craft room
o Paint walls, ~ and trim as needecl
o Stain balustrade to match existing