HomeMy WebLinkAbout05110090-Sq. Ft. flow arrows
All drainage swales and su
Sump pump -- Show sump pump p
Geothermal heat pum.p
*NOTE: If land is not within a description is required.
CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): The Direct:or shall approve or deny the'Improvement
Location Permit within five (S) working days of the receipt of the Written application form and accompanying
materla s The Improvement Location Permit shall be Issued when the proposed structure, improvement, or use and
ts location conform in a respects to this ordnance"
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL P-,E(~UIP, EMENTS, THE BUILDING INSPECTORR WILL BE PROVIDED
WITH ANY INFORRMATIoN RRELATIVE TO COMMITMENTS MADE IN THE ZONING pRROCESS FOP, THE PRROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMtSION~ BOARRD OF ZONING APPEALS, AND/ORR DEPT. OF
COHMUNITY SEP. VICES ADMINISTRATIVE APPROVALS RRE(~UIRRED
ADDiTiONAL INFORRMATiON MAY BE RRE(;~UESTED BY~ AND WILL BE PRROVIDED TO THE BUILDING INSPECFORR, IF
OF THE WORK PRROPOSED AND TO DETEPJVlINE COMPLIANCE WITH ALL APPLICAB_LE~ CODP.5
SUBMITTAL OF ADDITIONALLY P.E(~UF..ETED/RE(~UIRED INFORMATION, AFTER THE INITIAL SUBMITi'AL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE pERMIT P. EVIEW.
THE OFFICE OF BUILDING & ,,C~,DE ENFORRC,E,,M. ENT RECOGNIZES ANY RROOM/ARREA DESIGNATED ON-
CONSTRRUCTION PLANS AS A BONUS RROOM TO BE, _ p- - .... SPACE. IF A.NyAiEIEA .S~
LABELED IS TO BE A FINISHED SPACE~, CONSTEUCTI.ON PLANS MUST BE LABELED ACCOP. DINGL. F 1TS
DETERMINED THAT AN UNFINISHED, BONUS RROOM AREA IS TO BECOME A FiNISHED ARREA
THE PLANS AND PERMIT RRECORRDS ~ BE UPDATED AT THE OFfiCE OF BUILDING &
EN FOP. CEMENT ......
;UB3ECT TO FZELD INSPECT~ON~ AND SHOULD NOT BEGIN PRIOR TO THE
46032, Ph.