Loading...
HomeMy WebLinkAbout05110090-Sq. Ft. flow arrows All drainage swales and su Sump pump -- Show sump pump p Geothermal heat pum.p *NOTE: If land is not within a description is required. CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): The Direct:or shall approve or deny the'Improvement Location Permit within five (S) working days of the receipt of the Written application form and accompanying materla s The Improvement Location Permit shall be Issued when the proposed structure, improvement, or use and ts location conform in a respects to this ordnance" IN ADDITION TO THE ABOVE-LISTED SUBMITTAL P-,E(~UIP, EMENTS, THE BUILDING INSPECTORR WILL BE PROVIDED WITH ANY INFORRMATIoN RRELATIVE TO COMMITMENTS MADE IN THE ZONING pRROCESS FOP, THE PRROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMtSION~ BOARRD OF ZONING APPEALS, AND/ORR DEPT. OF COHMUNITY SEP. VICES ADMINISTRATIVE APPROVALS RRE(~UIRRED ADDiTiONAL INFORRMATiON MAY BE RRE(;~UESTED BY~ AND WILL BE PRROVIDED TO THE BUILDING INSPECFORR, IF OF THE WORK PRROPOSED AND TO DETEPJVlINE COMPLIANCE WITH ALL APPLICAB_LE~ CODP.5 SUBMITTAL OF ADDITIONALLY P.E(~UF..ETED/RE(~UIRED INFORMATION, AFTER THE INITIAL SUBMITi'AL, WILL EXTEND THE TIME IT TAKES COMPLETE THE pERMIT P. EVIEW. THE OFFICE OF BUILDING & ,,C~,DE ENFORRC,E,,M. ENT RECOGNIZES ANY RROOM/ARREA DESIGNATED ON- CONSTRRUCTION PLANS AS A BONUS RROOM TO BE, _ p- - .... SPACE. IF A.NyAiEIEA .S~ LABELED IS TO BE A FINISHED SPACE~, CONSTEUCTI.ON PLANS MUST BE LABELED ACCOP. DINGL. F 1TS DETERMINED THAT AN UNFINISHED, BONUS RROOM AREA IS TO BECOME A FiNISHED ARREA THE PLANS AND PERMIT RRECORRDS ~ BE UPDATED AT THE OFfiCE OF BUILDING & EN FOP. CEMENT ...... ;UB3ECT TO FZELD INSPECT~ON~ AND SHOULD NOT BEGIN PRIOR TO THE 46032, Ph.