HomeMy WebLinkAbout05100163-Sq. Ft. k A I s dewa ks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well ocat ons
m. Drainage flow arrows
n. All drainage swales and subsurface fac ities (retent on / detention areas, etc )
o Sump pump -- Show sump pump pit(s) and d scharge ne ocati0ns
p ,Geothermal heat pump discharge ocations
*NOTE: Zf land is not Within a platted subdivision, a legal description is required.
FURTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289, SECTION 29.0~.02 (3): ' The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written app icat on form and accompany ng
materials, The Improvement Locatiori Permit sha b,,e issued when the proposed structure, improver~enf~, or use and
its location conform in all resPeCtS to this ordinance.
IN ADDITION TO THE ABOVE-LISTED SUBMITI'AL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMEN~'S MADE IN ~FHE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING AppEALs, AND/OR DEFT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED,
ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THESUBMITTED PLANS ARE NOT OF SUFFICI[ENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OFTHE WORK PROPOSED AND TO DETERMINE COMPLIANCE WTrH ALL APPLICABLE CODES AND ORDINANCES,
SUBMITTAL OF ADDJ'T~oNALLY RE~UESTEDJREQUIRED INFORMATION, AFTER THE INiTiAL SUBMITTAL, WILL
EXTEND THE TIME 1T TAKES COMPLETE THE PERMIT REVIEW,
THE OFFICE OF BUILDING & ~ODE ENFORCE.,,I~?NT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A BONUS ROOM TO BE SPACE IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, tED AREA AFTER THE
IS ~-J- EOF TI PERMIT ] AT THE OFFICE OF BUILDING &
abUi di~c~
NOT BEGIN PRZOR TO THE
~ NOT BE POURED,