CITY OF CARMEL 241/ 6
•TO: The Hunt Paving Company, Inc. CONTRACT CHANGE ORDER NO.: #2 (FINA )
Post Office Box 42517 DATE: Octoberber 9, 2013
Indianapolis, IN 46242-0517 PROJECT NAME: Auman & Nappanee Neighborhood
Improvements Phase 2 (09-06)
CITY REQ. NO.:
CITY PO NO.: 25820
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
(Brief Description)
ITEM AMOUNT • •. j+)OR (-) DAYS
See Attached Sheets
II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to
be considered a pad of this Change Order: R.F.P.: NA W.D.C. No.: NA
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Chan•e Order $ 723;803.75
Contract Price will be increased ;;, ;,z by this Change Order $ 4,611.30 4,54 I •38
New Contract Price including this Change Order $ -7-267-8454+ 72 8. 345. ( 3 -964
Contract Time Prior to this Change Order NA Days NA Completion Date
Net increased/decreased resulting from this Change Order NA Days
Current Contract Time including this Change Order NA Days NA Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Approved:
Recommended Accepted:
Department of Engineering 4L Flantlagm co
ENGINEER CONTRACTO'Ri James Braina d, Mayor
One Civic Square ,9460 S Avte., 'nog 2€xJ
Address Address Mary Ann Meber
Carmel IN, 46032 -f'fi cintyo/'i 5 NL121t( t� � m
City/State/Zip City/State/Zip Lori Wat ern,iMember
BYVar / kcein By ATTEST:
pri n me) ! (pr' t nam
(signature) (/ / (signature) cl�,ti Cr//� aoinj
Phone: (317) 571-2441 Phone: 30 ':21-11 0313
1�/� ,Diana Cordray, Clerk-Treasurer
r
Date: October 9, 2013 Date: . / Date: /1 ,cm-/L.,/
Michael- McBrideR
City Engineer
Date: DG1 /8, 2013
CHANGE ORDER #2 (FINAL)
AUMAN AND NEWARK NEIGHBORHOOD IMPROVEMENTS
PHASE 2: NAPPANEE DRIVE SIDEWALK& DRAINAGE IMPROVEMENTS
Item No. Item
4 B-Borrow for Structural Backfill overrun because sand used to backfill an existing
sanitary sewer on Nappanee Drive would collapse into the new trench excavated for the
storm sewer. This unforeseen condition increased the size the trench and caused more #8
stone to be used for backfill. Quantity adjustment -
86.17 Cyds. X $72.00 = $6,204.24 (Increase)
19 Flowable Fill (Class A Concrete for Patch) - underrun because areas that were to be
patched with concrete were eliminated because they were backfilled with #8 stone. An
existing sanitary sewer trench continued to collapse during the excavation for the storm
sewer. The thickness of the patches on Range Line Road and Nappanee Drive were less
than shown on the plans. More Flowable Backfill (Item #10) was used in its place.
Quantity adjustment -
2.0 Tons X $100.00 = $200.00 (Increase)
29 Compacted Aggregate, 53, Base - overrun. Final quantity was substantially as planned.
Quantity adjustment—
5.05 Tons X $37.00 = $186.85 (Increase)
44 QC Testing/Videotaping - underrun because#8 stone was used instead of B-borrow to
backfill over the pipes. #8 stone is open graded material and cannot be tested for density.
No QC Testing was done by the contractor. Quantity adjustment—
Percentage of work not required because of change in material used - 70%
0.70 X $7,400.00 = $5,169.20 (Decrease)
EWA 6 Castings R4882-A, Installed - overrun because drainage structures were modified to
allow for flat castings along the edge of the roadway on Nappanee Drive. This was done so
that snowplows would not hit the castings.
3 Each X $1039.83 = $3,119.49 (Increase)
CHANGE ORDER #2 (FINAL)
AUMAN AND NEWARK NEIGHBORHOOD IMPROVEMENTS
PHASE 2: NAPPANEE DRIVE SIDEWALK & DRAINAGE IMPROVEMENTS
4 B-Borrow for Structural Backfill - Quantity Increase - $ 6,204.24
19 Flowable Fill (Class A Conc. for Patch) - Quantity Increase - $ 200.00
29 Compacted Aggregate, 53, Base - Quantity Increase— $ 186.85
44 QC Testing/Videotaping - Quantity Decrease— 5 5,169.20
EWA6 Castings R4882-A, Installed - Quantity Increase— $ 3,119.49
TOTAL INCREASE $ 4,541.38
-as4 Post Office Box 42517
The Hunt Paving Company, Inc. Indianapolis, IN 46242-0517
317/241-8313
Fax 317/487-5779
10/10/13
Dan Greskamp
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Auman & Newark Neighborhood Improvements
Phase 2: Nappanee Drive, Sidewalk and Drainage Improvements
Dan:
Please find below the pricing for Specialties Company to video inspect the pipe.
approx.
item description quantity unit unit price total price
NEW Video Inspection 1,352.00 LF $ 1.65 $ 2,230.80
If you should have any questions or require any additional information please give me a call.
Thank you,
THE HUNT PAVING COMPANY, INC.
-11 46TO
Emily Lucas
cc: Job File
2013
COMPANY NAME DATE: 10/10/2013 PAGE: 1
THE HUNT PAVING COMPANY DAY: OF: 1
PURCHASE ORDER NO. RELEASE NO. JOB NO. 667
NA NA
JOB DESCRIPTION
Below is a breakdown for the work requested.
LABOR
EMPLOYEE NAME EMPLOYE CRAFT REG HRS OT HRS DT HRS RATE RATE RATE DT HRS TOTAL
REG HRS OT HRS
TOTAL LABOR
Additional Work (Specialties Company)
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
Video Inspection LF 1,352.00 $ 1.50 $ 2,028.00
_ TOTAL $ 2,028.00
EQUIPMENT and small tools
EQUIP TYPE HRS EQUIPMENT# RATE TOTAL
INDOT markups:
TOTALS
TOTAL LABOR +10% 0.00
TOTAL MATERIAL +10%
• TOTAL EQUIP +10% 0.00
TOTAL SUBS +10% 2230.80
TOTAL INSUR/BOND/LIABILITY
EQUIPMENT TOTAL 0.00 PAGE TOTAL total 2230.80
INSPECTOR APPROVAL
signature date
REMIT TO: INVOICE
Invoice 13913
Pape No. --
SPECIALTIES COMPANY, LLC Pa.,
S•ECIALTI. 9350 East 30th Street Application Date Terms Contract
'man Indianapolis, IN 46229 I ,
(317) 594-0291 • Fax (317) 594-0271 N_
) ) 31 xae 2013 I 30 DAYS 1 0667 1
V Specialized for Construction V
Contract Location
1 1
Customer 1020 1 Job Cost Project 4 61305:
I l
HUNT PAVING CO INC 1 ADMAN 6 NEWARK- HUNT
FO BOX 42517 1
INDIANAPOLIS, IH 46242
I IN
Estimated Previous Current To Dace Unit Current To Date
Bid Item Description UOM Quantity Quantity Quantity Quantity Price Amount Amount
001 PIPE VIDEO INSPECTIO LET 1300.0000 0.0000 1352.0000 1352.0000 1.5000 2,028.00 2,028.00
..Total Base Contract.. 2,028.00 2,028.00
Total Contract And Change Orders 2,028.00 2,028.00
Billing Summary For Contract 613058
Current To Date
Complete To Date 2,028.00 2,022.00
Materials On Hand 0.00 0.00
Sales Tax 0.00 0.00
Less Retainage Per Item 0.00 0.00
Balance 2,028.00 2,028.00
Less Previous Payments 0.00
Total Amount Due 2,028.00 2,022.00
Soil Stabilization V Concrete Breaking V Guardrail V Fencing V Milling V Video Inspection
Finance chard=_of 1V20,,,,per month(18%annual)will be applied to all past due balances.Reasonable Attorney's lees and court costs will be added.
Post Office Box 42517
The Hunt Paving Company, Inc.
Indianapolis, IN 46242-0517
317/241-8313
Fax 317/487-5779
10/10/12
Dan Greskamp
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Auman & Newark Neighborhood Improvements
Phase 2: Nappanee Drive, Sidewalk and Drainage Improvements
Dan:
Please find below the pricing for replacing three castings.
approx.
item description quantity unit unit price total price
NEW Castings R4882-A, Installed 3.00 EA S 1,039.83 $ 3,119.50
If you should have any questions or require any additional information please give me a call.
Thank you,
THE HUNT PAVING COMPANY, INC.
6i,),
Emily Lucas
cc: Job File
2012
COMPANY NAME DATE: 10;1012012 PAGE: 1
THE HUNT PAVING COMPANY DAY: , OF: 1
PURCHASE ORDER NO. RELEASE NO. JOB NO. 667
NA NA
JOE DESCRIPTION
Below is a breakdown for the work requested.
LABOR
EMPLOYE RATE RATE
EMPLOYEE NAME CRAFT REG HRS OT HRS DT HRS REG HRS I OT HRS (RASE DT HRS TOTAL
I
I I I
I Foreman 6 ( 39.93 I 319.44
Laborer 8 37.65
I 301.20
I_
I I f I
I I I I
TOTAL LABOR I I I 1 1491.10
Additional Work (Roudebush Grading) •
ITEM DESCRIPTION I UNIT I QUAN T ITYI UNIT PRICE I TOTAL
I
Castings EA 3.00 $ 330.00 5 1,140.00
Misc Materials _ EA 3.00 + 50.00 S 150.00
I l I
.
I
I TOTAL I $ 1,290.00
EQUIPMENT and small tools
EQUIP TYPE HRS I EQUIPMENT" RATE TOTAL
PM 8 1528 5 21.51 172.08 3/r. 4 T 28
C!r. tr82
sfr. x.33
I I
i 1
I I
_ I
INDOT markups:
TOTALS
TOTAL LABOR +10% I 1640.21
TOTAL MATERIAL +10%
i I TOTAL EQUIP +10% 189.29
I (TOTAL SUBS +10%
I (TOTAL INSURIEONDILIABILITY
I EQUIPMENT TOTAL I 172.08 (PAGE TOTAL total 3119,50
INSPECTOR APPROVAL
signature date