Loading...
HomeMy WebLinkAbout05110115-Sq. Ft. k. All sidewalks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m Drainage flow arrows n All drainage swales and subsurface facilities (retention / detention areas, etc...) o. Sump pump - Show sump pump pit(s) and discharge line locations p. Geothermal heat pump discharge ~ocations *NOTE: If land is not within a platted subdivision~ a legal description is required. FURTHER NOTES / NOTICES CARMEL ZONING ORDINANCE Z-289, SECTION 29.04,02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and its location conform in ali respects to this ordinance." IN ADDITION TO THE ABOVE-LISTED SUBMiTtAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROV[DED WI?H ANY INFORMATION RELA'I~VE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERWCES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROWDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFIC/ENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITr. AL SUBMiTfAL, W~LL EXTEND THE TIME IT TAKES COMPLETE THE PERM1T REVIEW. > THE OFF~CE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE N-'' -'-'.B k. r~ ----':q iED SPACE. IFANAREASO LABELED IS TO BE A F/NISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF i"r IS DETERMINED THAT AN UNF/NISHED, "BONUS ROOM" AREA IS TO BECOME A F/NISHED AREA ~ ~S_._SUANCE OF THE PERM1T_, THE PLANS AND PERM1T RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. ~ ALL CONSTRUCTION IS SUB3ECT TO F/ELD INSPECT/ON, AND SHOULD NOT BEGIN PP~OR TO THE ISSUANCE OF THE BUILDING PERHll'. ONCE THE PERMI-F IS ISSUED, WORK SHOULD NOT BE POURED, INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning pdor to obtaining a bui ding permit and/or proceeding with construction beyond the stage of a required inspection without approval constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06 08 BUILDING & CODE ENFORCEMENT; CI'W OF CARMEL. One Civic Scl.; Carmel, IN 46052. Dh. ('517) 571-2444. true Commun ~ to comply penalties of Pedury (Indiana obscure, or otherwise mislead the Dept. of truth of the matters addressed therein. Front Rear Porch Porch or Ft. of sunroom Garages TOTAL DATE S:PermitslFORHSIRESIDENTIAL PROCEDURES 2 of 2