GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFICATION OF ALL DIMENSIONS AND JOB
CONDITIONS. ANY DEVIATION FROM WHAT IS NOTED
IN DRAWINGS SHALL BE BROUGHT TO THE ATfENTION
OF THE ARCHITECT IMMEDIATELY.
2 ALL DIMENSIONS SHOWN ARE FACE OF BRICK,
MASONRY OR METAL STUD FRAMING-UNLESS NOTED
OTHERWISE.
3. PROVIDE DEEP LEG DEFLECTION TRACK AT ALL
METAL STUD CONNECTIONS WITH STRUCTURE
ABOVE-TYPICAL
4. PROVIDE FIRE RATED WOOD BLOCKING IN METAL
STUD WALLS FOR ANY WALL SUPPORTED ITEMS.
5. PROVIDE APPROVED FIRE RATED STOPPWG MATERIALS
IN ANY OPENINGS W FlRE RATED ASSEMBLIES.
6. REFER TO DOOR AND WIN�OW SCHEDULES FOR ALL
MATERIALS, RNISHES AND HARDWARE WFORMATION.
7. REFER TO EXTERIOR ELEVATIONS FOR ALL BRICK
MASONRY AND OTHER EXPANSION JOINT LOCATIONS.
8. ALL MATERWLS LOCATED IN CEILING PLENUM SHALL
BE RATED FOR SUCH WSTALLATION OR PROTECTED
TO PROVIDE COMPLIANCE THIS WCLUDES BUT IS
NOT LIMITED TO POWER AND LOW VOLTAGE WIRING,
TELECOMMUNICATIONS CABLWG, PLUMBING SUPPLY
AND DRAW LMES AND SUPPORTING BRACKETS
AND�OR BLOCKING FOR CBLING HUNG ITEMS.
9. PRIOR TO ORDERING ANY PRODUCTS-CONTRACTOR
SHALL SUBMIT SAMPLES TO THE ARCHITECT OF ALL
FlNISH MATERIALS TO BE USED ON THE PROJECT.
THE CONTRACTOR SHALL BEAR SOLE RESPONSIBILITY
FOR ANY MATERIALS ORDERED MCORRECTLY WHEN
THAT MATERIAL WAS NOT REVIEWED BY THE
ARCHITECT.
10. PROVIDE CONCRETE FlLLED STEEL PIPE BOLLAR�S
AT ALL REQUIRED UTILIIY EQUIPMENT LOCATIONS
SUCH AS GAS METERS, ELECTRICAL
TR4NSFORMERSPANELS ETG COORDINATE WITH
UTILITY COMPANY AND CONTRACTORS-WHEN
APPLICABLE-FOR NECESSARY LOCATIONS. REFER TO
CIVIL DRAWINGS FOR BOLLARD SPECIFlCATIONS AND
11_ ANY WOOD USEq PLYWOOD SHEATHING, WOOD
BLOCKING ETC TO BE FlRE TREATED.
w
w�
>�
�w
J F
aw��� �
Z=¢�� U
hw¢���=
oa�
-z�� w¢
QwVC�F
Ow �O=�
xO���Q�
Fws7�Zu
�?�mFC�
QF�OQ°o
ZaFd�F
Z � Q ~ ? U S
����o�
0
�U� <�v�'ia
Z�,J,pOZO
��?Q��O
�
O
m m � w
F
Z '"
� V Z w
� S J N
0 V V '!'
KEYED NOTES °
w
�
1. BRICK VENEER OVER INSULATION BOARD, SHEATHING AND
METAL STUD FRAMING. REFER TO WALL SECTIONS FOR ALL
WFORMATION.
2 METAL PANEL.
3.
4- TENANT DEMISING WALL BUMP OUTS AROUND COLUMNS T(
HAVE TWO LAYERS OF GWB FOR 2-HOUR R4TING.
5- COORDINATE WITH STRUCTURAL DRAWINGS ON EXTENTS OF
FLOOR SLAB POUR.
7. 5/8" GYP. BD. SHEAiHING TO DECK TAPED MUDDED, "�
SANDED SMOOTH READY TO RECEIVE FINISH. VERIFY LEVEL
5 FlNISH_
w
w
K
�
Q
Z
>
�
Z
Z
w
a
Z
PROJECT
LOCATION
WEST CARMEL DRIVE
KEYPLAN
�N
0 0
� i
M N
i
o �
w �
� �
� -
m �
��
0
�w
�o
�a
F
0
. u
LLI
Q �
�
H
V
�/ w
Li ~
2
U
�
� a
Z
�
� �
�
U
�
U-�
� O L1� X
O �/1 () Q
— N LL
� � O M
Z �
� — ^
N 00 O
_ Uj �O .
� J � �
"'OooN
� Q N ^
�O Z ' —
O� Q h M
N Q M
Q Z
W —
u'f
N
O�
�
`"U�ni. nih� '/'
.� N
�. � ........ ,,
�J�o M '
a
_ "`W O °o k ` _ �
=�:.N z � � � �
Z &
Jd
_ r
O ;�L . K �
F :�1y�... a � Q,:
� '��'9un����o�a�`
�
V
�
Z
—
�
J
—
�
m
J
Q
W
GC
W
H
a
H
�
W
Q
W
�
J
Q
W
GC
2
�
J
�
W
�
W
W
�
�
�
a
�
Z
Q
i
J
�
N
Z
Z
W
�
Q Z
� A�
O v`
= M
H -
130168
AI.I
N
M
N
�
�
Q
Z
Q
—
�
Z
w
W
�
Q
V