The Owner and General Contractor request a substitute 1-hr rated wall construction, in lieu of the
odginal design and cited assemblies. The walls are within 5 feet of the Property Line and assumed
to be protected both sides. See attached revised drawings.
The current East and West walls are noted as Wall Type W8.
A. Wall Description: The contractor has used a 6" -18 ga. metal stud ~ 16" OC
that is connected to the CMU base and roof/floor trusses that it bypasses(adequate
structural fastenings were installed per the engineer). The extedor face is 3 %" clay
bdck masonry, attached with metal ties every 8th course. The air gap is %~ and the
cavity is faced with an extedor '~' non-rated gypsum board screw fastened at 12"
OC. The wall will have a R-13 fiberglass batt. The interior face will be sheathed
with (2)-layers of Type "X" Gypsum Board, staggered joints, taped, and nailed at 8"
OC.
B. Reasoning for its Use: Per Table 720.4.1(2) under the last citing, a similar
steel beadng wall with veneer bdck is described with the interior using 1' cement
plaster. As this wall is rated for 2-hour it is more than adequate (need only 1-hr), but
as we do not have the inner %" sheathing rated, we feel the 2-layers of 5/8" Type 'X'
is still prudent to effect protection and integrity of the metal stud from fire on the
intedor side.
The current North or rear wall is now noted W10., original note was Wla & Wlb.
A.
Wall Description: The contractor has used a 6' -18 ga. metal stud @ 16" OC.
that is connected to the CMU base, bypasses the second floor framing (supported
by other interior load beadng studs) and which supports the roof truss ends. The
exterior face of stud will have a 5/8" Fire Guard Dens Glass Gypsum Product screw
fastened at 8" OC) with an EIFS system applied to outside. The wall will have a R-
13 fiberglass batt. The interior face will be sheathed with (1)-layer of Type "X"
Gypsum Board, staggered joints, taped, and screwed at 8" OC.
Reasoning for its Use: Per UL U468 or Table 719.1(2) 150-1.11 or U465, we
fee! the substitution of the UL labeled Fire Guard product will meet the intent of the
assembly cited. The contractor will need to infill the "truss gaps" where the roof
trusses penetrate the assembly with studs and Type "X" 5/8"
~NCARB
Architect
I D 3 A T e c h n ~e K r a f t A Joint Venture Company
(317) 251-4976 Voice (317) 251-7254 Fax (317) 432-4875 Cell jeffsipe~prodigy, net
1NDIANA GOVERNMENT CENTER SO~
4o2 w WASHINGTON ST~ E2~
ww~vlstate:inius/sema
Professional Me~cal Offi6b
Meeha~eal
~ Ail Abgve ~t ~er (.~pec/fv)
· projeCt height or~
m~ed by the
ADDENDUM APPLICATION
State Form 28284 (R2 / 3-95)
Return to: INDIANA DEPARTMEN"I' OF FIRE AND BUILDING SERVICES
PLAN REVIEW DIVISION
OFFICE OF THE STATE BUILDING COMMISSIONER
INDIANA GOVERNMENT CENTER SOLrFH
4(Y2 W WASHINGTON ST RM E245
INDIANAPOLIS IN 46204-2739
www.s~ate,in.us/sema
PLEASE PRINT CLEARLY
Brad Subrin dba Leechco Properties, LLC
Address (site laca~on, number and street) Phone Number
C/OBradSubrin 1344SouthRangeLineRoad Carmel, IN 46032 (317) 848-9081
Signature of 1)csign Professional (if required) Architect / Engineer Number
Charles R. Homburg IN 18939
Signature of Owner E-Mail Address
Spectaclesinc 1 ~aol.com
Name of project
Opton~try Office Addition & Renovation
P~ject Address
~oject Number
306124
Facility Use
30 l~SlreetSW Carmel, IN 46032
Professional Medical Office
Cod~ Review Official ~ ]City Conlact person
Cra'reel Brad Subrin
Documents required for this filing:
1. Addendum Application.
One assembled set of modified drawings which clearly ~ the changes.
3. Addendum fees for each system affected.
NOTE: An addendum may not be used to enlarge or expand the scope of the original filing release.
Addendmnchangeistothe folloWingsyslems: X Stmctund o__~y_~ n Architectural ~ Mechanical
Plumbing x Electricai ~ Fire Suppression ~r All Above ~ Other (specify)
:ovexed by this addendtun:
Change North Wall above existing CMU to a Load Bearing Metal Studs.
. (a) No design changes or addilions to the scope of work shall be made on a construction project subsequem to the issuance of an
applicable design release unless an addendum or a revision design release is issued by the Office of the Slate Building Commissioner with the
approval of the Office of the State Fire Marshal.
Co) Such design changes shall not include increases in project height or area.
(e) Subsequent to the issuance of an addendum or revision design release, the original design release remains in effect as modified by the
addendum or rmdsion de--lease.
IL~TI~~ (Q)!F u~~IG!!~IR:1I~Tnr~1L
OS()SOO'l7
ARGO Consulting Engineers, Inc
618 North Davidson Street
Indianapolis, Indiana 46202-3508
(317) 639-9244
(317) 639-9249
Email argo@argoce.com
Mr. James Ochs, C.B.O.
Department of Community Services
One Civic Square
Carmel, IN 46032
Drs. Lauck and McLean
September 20, 2005
RE:
30 1 st Street
Carmel, IN
Project Number
WE ARE SENDING YOU 0 Attached D Under separate cover via_
the following items:
o Shop Drawings
ISI Copy of Letter
OPrinls
o Change Order
o Plans
OPlols
o Samples
o Disk~ttes
o Specifications
o Other
COPIES DATE NO. DESCRIPTION
1 7/12/2005 Enqineer's Field Report S-1
1 8/9/2005 Engineer's Field Report S-2
1 8/30/2005 Engineer's Field Report S-3
1 8/29/2005 Inspection Letter - LaFever Electric
1 8/30/2005 Letter from Excel Mechanical
.
THESE ARE TRANSMITTED as checked below:
o For Review
[8J For Your Use
[8J As Requested
o For Review and Comment
o Reviewed
o Furnish as Corrected
o Rejected
D Revise and Resubmit
o Resubmit
o Submit
o Return
copies for Review
copies for Distribution
corrected prints
Remarks:
Please call me if vou need additional information or have anv Questions
SIGNED
ARGO Consulting Engineers, Inc.
618 North Davidson Street
Indianapolis, Indiana 46202-3508
TeL (317) 639-9244
Fax. (317) 639-9249
Email argo@argoce.com
ENGINEER'S FIELD REPORT
PROJECT NAME:
Drs Lauck and McLean
Optometry Office Addition
30 1" Street
Carmel, iN
REPORT NO: S-1
PROJECT NUMBER:
DATE: July 12, 2005
EST. % OF COMPLETION:
TIME: 1 :30 pm
WEATHER: 78 of
drizzle
WORK IN PROGRESS
No Work
PRESENT AT SITE
No Workmen
OBSERVATIONS:
The work is in general conformance with the Design Drawings at this phase of construction.
ITEMS TO VERIFY:
. The contractor should verify and report to the engineer the connection between the wood
plate and the steel beams. The light gage wire is not sufficient or acceptable. (The bolts
between the plate and the steel beam were not installed as shown in the design
documents)
. What action has the contractor made to reinforce the foundations along the north wall?
. The contractor shall provide documentation that the wood joists are equal to those as
shown on the construction documents.
INFORMATION OR ACT!ON REQUIRED:
ATTACHMENTS: Photos
REPORT BY: Bob Homburg
CC Jeff Sipe
ARGO Consulting Engineers, Inc.
618 North Davidson Street
Indianapolis, Indiana 46202-3508
Tel. (317) 639-9244
Fax. (317) 639-9249
Email argo@argoce.com
ENGINEER'S FIELD REPORT
PROJECT NAME: Drs. Lauck and McLean
Optometry Office Addition
30 1" Street
Carmel, Indiana
PROJECT NUMBER: REPORT NO: S2
DATE: August 9,2005
TIME: 11 AM
WEATHER: Sunny 85"F
EST. % OF COMPLETION:
WORK IN PROGRESS
Installing drywali ceiling and insulation
Instaliing ductwork
Installing Brick along west wali
PRESENT AT SITE
Brian Warner, superintendent with Superior
6 Masons
2 HVAC
4 Carpenters
OBSERVATIONS:
. The masons were installing appropriate 3/16" brick ties and anchors.
. The bolts requested in FR 5-1 were partialiy instalied; two beams to be bolted.
.
ITEMS TO VERIFY:
. Brian reported that A-1 instalied two push piers at the NW and two push piers at the NE
building corners to stabilize the walls. Documentation should be provided for the owners file
(warranty information etc.)
INFORMATION OR ACTiON REQUIRED:
. Finish bolting the beam to the blocking plate
. Instali (4) #12 screws each side of second fioor window cripple into 6" steel 18 gage jamb
stud.
. Suggested that the roof vents be instalied before the second fioor ceiling drywali is
completed.
. Requested that the contractor forward documentation on the joist and trusses for the owners
file. The documents should include the design loads certification and recommendations from
the supplier for instaliation and bracing.
. Requested that blocking be instalied between joist where non-bearing walis sit paraliel to
supporting joist.
. Need to instali 3/16" dia Hilti Kwick Bolt II through track into masonry wali at 32" oc.
ATTACHMENTS: None
k::&.1o(,( ~
REPORT BY: Bob Homburg
CC: Brad Subrin and Jeff Sipe
Page 1
ARGO Consulting Engineers, Inc.
618 North Davidson Street
Indianapolis, Indiana 46202-3508
Tel. (317) 639-9244
Fax. (317) 639-9249
Email argo@argoce.com
ENGINEER'S FIELD REPORT
PROJECT NAME:
Drs. Lauck and Mclean
REPORT NO: S3
PROJECT NUMBER:
DATE: 8/30/2005
TIME: 11 AM
WEATHER: Rain 700F
EST. % OF COMPLETION:
WORK IN PROGRESS
None
PRESENT AT SITE
Brad Subrin
Brian Jones, Superior
Scott Brattain, Superior
Brian Werner, Superior
James Ochs, Carmel Building Inspector
OBSERVATIONS:
. Work to be completed prior to covering with drywall:
o (2) #10 screws between track and track top and bottom.
o Vents through roof at rear and front of building.
o Gaps in wall board between west at second floor window head height shall be filled,
. taped and spackled.
. Fire stopping at top of all walls.
ITEMS TO VERIFY:
o Flue support, flue distance to property line and distance to parapet wall.
INFORMATION OR ACTION REQUIRED:
o The fire rating on the West Wall is not completed. (Brian Jones is investigating)
o Mr. Ochs' satisfaction with the quality of the roof trusses.
ATTACHMENTS: Drawing of Detail 4 sheet A4 showing screws and attachments required. The
installation was changed from the original design.
iTEMS TO COMPLETED:
o Screws between track and old wall.
o Masonry anchors and screw attachments.
o Received truss shop drawings.
o Received Work proposal from A-1 for corner piers.
o Mechanical and Electrical review items as approved by Mr. Ochs.
REPORT BY: Bob Homburg
CC: Brad Subrin, Jeff Sipe and Brian Jones
Page 1
131 NORTH RANGELlNE ROAD . CARMEl, IN 46032
.
(317) 846-4687 . FAX (317) 844.7943
Commercial and Industrial Contractors
August 29, 2005
Superior Contractors, Inc.
2209 E. Beecher, Suite A
Indianapolis, IN 46203
Attn. Scott Brattain
RE: DfCauck & MCLean
30 I" Ave SW
Dear Scott,
LaFever Electric, Inc. Has made an inspection of the site listed above and will make the
following changes when we can again access the job.
I) Complete the bonding of junction boxes that had not yet been completed.
2) Install type HCF MC cable to the reccptacles and make home runs for them with type
HCF MC cable that will have equipment that will come in contact with the patients.
The above items were discussed with the inspector Jim Ochs and we were in agreement.
If you have any questions or I can be of further assistance please do not hesitate to call.
Sincerely,
Chris A. LaFever
From:
To:
Attn:
Excel Mechanical loc
3005 S. Rwal St
Indpls. In. 46237
Superior Contractors
Brian Jones
Copper tube supports
Sch 40 PVC
Horizontal
I Yz" & smaller every 6'
All sizes every 4 feet
Stud guards protecting plumbing pipes
Date: 8/30/05
(317) 788-0622
(fax) 788-0759
Job: Dr. Lauk
Verticle
Each floor not to exceed 10'
Base & each floor, mid story guides