Loading...
HomeMy WebLinkAbout05050047 CorrespondenceP R O J E C T A D D E N D U M TO: Edk Kassig Indiana Dept. of Fire and Building Services RE: Project No. 306124 30 1" Street SW Dr's Lauck & Conway Optical Office Carmel DATE: 9/2/05 The Owner and General Contractor request a substitute 1-hr rated wall construction, in lieu of the odginal design and cited assemblies. The walls are within 5 feet of the Property Line and assumed to be protected both sides. See attached revised drawings. The current East and West walls are noted as Wall Type W8. A. Wall Description: The contractor has used a 6" -18 ga. metal stud ~ 16" OC that is connected to the CMU base and roof/floor trusses that it bypasses(adequate structural fastenings were installed per the engineer). The extedor face is 3 %" clay bdck masonry, attached with metal ties every 8th course. The air gap is %~ and the cavity is faced with an extedor '~' non-rated gypsum board screw fastened at 12" OC. The wall will have a R-13 fiberglass batt. The interior face will be sheathed with (2)-layers of Type "X" Gypsum Board, staggered joints, taped, and nailed at 8" OC. B. Reasoning for its Use: Per Table 720.4.1(2) under the last citing, a similar steel beadng wall with veneer bdck is described with the interior using 1' cement plaster. As this wall is rated for 2-hour it is more than adequate (need only 1-hr), but as we do not have the inner %" sheathing rated, we feel the 2-layers of 5/8" Type 'X' is still prudent to effect protection and integrity of the metal stud from fire on the intedor side. The current North or rear wall is now noted W10., original note was Wla & Wlb. A. Wall Description: The contractor has used a 6' -18 ga. metal stud @ 16" OC. that is connected to the CMU base, bypasses the second floor framing (supported by other interior load beadng studs) and which supports the roof truss ends. The exterior face of stud will have a 5/8" Fire Guard Dens Glass Gypsum Product screw fastened at 8" OC) with an EIFS system applied to outside. The wall will have a R- 13 fiberglass batt. The interior face will be sheathed with (1)-layer of Type "X" Gypsum Board, staggered joints, taped, and screwed at 8" OC. Reasoning for its Use: Per UL U468 or Table 719.1(2) 150-1.11 or U465, we fee! the substitution of the UL labeled Fire Guard product will meet the intent of the assembly cited. The contractor will need to infill the "truss gaps" where the roof trusses penetrate the assembly with studs and Type "X" 5/8" ~NCARB Architect I D 3 A T e c h n ~e K r a f t A Joint Venture Company (317) 251-4976 Voice (317) 251-7254 Fax (317) 432-4875 Cell jeffsipe~prodigy, net 1NDIANA GOVERNMENT CENTER SO~ 4o2 w WASHINGTON ST~ E2~ ww~vlstate:inius/sema Professional Me~cal Offi6b Meeha~eal ~ Ail Abgve ~t ~er (.~pec/fv) · projeCt height or~ m~ed by the ADDENDUM APPLICATION State Form 28284 (R2 / 3-95) Return to: INDIANA DEPARTMEN"I' OF FIRE AND BUILDING SERVICES PLAN REVIEW DIVISION OFFICE OF THE STATE BUILDING COMMISSIONER INDIANA GOVERNMENT CENTER SOLrFH 4(Y2 W WASHINGTON ST RM E245 INDIANAPOLIS IN 46204-2739 www.s~ate,in.us/sema PLEASE PRINT CLEARLY Brad Subrin dba Leechco Properties, LLC Address (site laca~on, number and street) Phone Number C/OBradSubrin 1344SouthRangeLineRoad Carmel, IN 46032 (317) 848-9081 Signature of 1)csign Professional (if required) Architect / Engineer Number Charles R. Homburg IN 18939 Signature of Owner E-Mail Address Spectaclesinc 1 ~aol.com Name of project Opton~try Office Addition & Renovation P~ject Address ~oject Number 306124 Facility Use 30 l~SlreetSW Carmel, IN 46032 Professional Medical Office Cod~ Review Official ~ ]City Conlact person Cra'reel Brad Subrin Documents required for this filing: 1. Addendum Application. One assembled set of modified drawings which clearly ~ the changes. 3. Addendum fees for each system affected. NOTE: An addendum may not be used to enlarge or expand the scope of the original filing release. Addendmnchangeistothe folloWingsyslems: X Stmctund o__~y_~ n Architectural ~ Mechanical Plumbing x Electricai ~ Fire Suppression ~r All Above ~ Other (specify) :ovexed by this addendtun: Change North Wall above existing CMU to a Load Bearing Metal Studs. . (a) No design changes or addilions to the scope of work shall be made on a construction project subsequem to the issuance of an applicable design release unless an addendum or a revision design release is issued by the Office of the Slate Building Commissioner with the approval of the Office of the State Fire Marshal. Co) Such design changes shall not include increases in project height or area. (e) Subsequent to the issuance of an addendum or revision design release, the original design release remains in effect as modified by the addendum or rmdsion de--lease. IL~TI~~ (Q)!F u~~IG!!~IR:1I~Tnr~1L OS()SOO'l7 ARGO Consulting Engineers, Inc 618 North Davidson Street Indianapolis, Indiana 46202-3508 (317) 639-9244 (317) 639-9249 Email argo@argoce.com Mr. James Ochs, C.B.O. Department of Community Services One Civic Square Carmel, IN 46032 Drs. Lauck and McLean September 20, 2005 RE: 30 1 st Street Carmel, IN Project Number WE ARE SENDING YOU 0 Attached D Under separate cover via_ the following items: o Shop Drawings ISI Copy of Letter OPrinls o Change Order o Plans OPlols o Samples o Disk~ttes o Specifications o Other COPIES DATE NO. DESCRIPTION 1 7/12/2005 Enqineer's Field Report S-1 1 8/9/2005 Engineer's Field Report S-2 1 8/30/2005 Engineer's Field Report S-3 1 8/29/2005 Inspection Letter - LaFever Electric 1 8/30/2005 Letter from Excel Mechanical . THESE ARE TRANSMITTED as checked below: o For Review [8J For Your Use [8J As Requested o For Review and Comment o Reviewed o Furnish as Corrected o Rejected D Revise and Resubmit o Resubmit o Submit o Return copies for Review copies for Distribution corrected prints Remarks: Please call me if vou need additional information or have anv Questions SIGNED ARGO Consulting Engineers, Inc. 618 North Davidson Street Indianapolis, Indiana 46202-3508 TeL (317) 639-9244 Fax. (317) 639-9249 Email argo@argoce.com ENGINEER'S FIELD REPORT PROJECT NAME: Drs Lauck and McLean Optometry Office Addition 30 1" Street Carmel, iN REPORT NO: S-1 PROJECT NUMBER: DATE: July 12, 2005 EST. % OF COMPLETION: TIME: 1 :30 pm WEATHER: 78 of drizzle WORK IN PROGRESS No Work PRESENT AT SITE No Workmen OBSERVATIONS: The work is in general conformance with the Design Drawings at this phase of construction. ITEMS TO VERIFY: . The contractor should verify and report to the engineer the connection between the wood plate and the steel beams. The light gage wire is not sufficient or acceptable. (The bolts between the plate and the steel beam were not installed as shown in the design documents) . What action has the contractor made to reinforce the foundations along the north wall? . The contractor shall provide documentation that the wood joists are equal to those as shown on the construction documents. INFORMATION OR ACT!ON REQUIRED: ATTACHMENTS: Photos REPORT BY: Bob Homburg CC Jeff Sipe ARGO Consulting Engineers, Inc. 618 North Davidson Street Indianapolis, Indiana 46202-3508 Tel. (317) 639-9244 Fax. (317) 639-9249 Email argo@argoce.com ENGINEER'S FIELD REPORT PROJECT NAME: Drs. Lauck and McLean Optometry Office Addition 30 1" Street Carmel, Indiana PROJECT NUMBER: REPORT NO: S2 DATE: August 9,2005 TIME: 11 AM WEATHER: Sunny 85"F EST. % OF COMPLETION: WORK IN PROGRESS Installing drywali ceiling and insulation Instaliing ductwork Installing Brick along west wali PRESENT AT SITE Brian Warner, superintendent with Superior 6 Masons 2 HVAC 4 Carpenters OBSERVATIONS: . The masons were installing appropriate 3/16" brick ties and anchors. . The bolts requested in FR 5-1 were partialiy instalied; two beams to be bolted. . ITEMS TO VERIFY: . Brian reported that A-1 instalied two push piers at the NW and two push piers at the NE building corners to stabilize the walls. Documentation should be provided for the owners file (warranty information etc.) INFORMATION OR ACTiON REQUIRED: . Finish bolting the beam to the blocking plate . Instali (4) #12 screws each side of second fioor window cripple into 6" steel 18 gage jamb stud. . Suggested that the roof vents be instalied before the second fioor ceiling drywali is completed. . Requested that the contractor forward documentation on the joist and trusses for the owners file. The documents should include the design loads certification and recommendations from the supplier for instaliation and bracing. . Requested that blocking be instalied between joist where non-bearing walis sit paraliel to supporting joist. . Need to instali 3/16" dia Hilti Kwick Bolt II through track into masonry wali at 32" oc. ATTACHMENTS: None k::&.1o(,( ~ REPORT BY: Bob Homburg CC: Brad Subrin and Jeff Sipe Page 1 ARGO Consulting Engineers, Inc. 618 North Davidson Street Indianapolis, Indiana 46202-3508 Tel. (317) 639-9244 Fax. (317) 639-9249 Email argo@argoce.com ENGINEER'S FIELD REPORT PROJECT NAME: Drs. Lauck and Mclean REPORT NO: S3 PROJECT NUMBER: DATE: 8/30/2005 TIME: 11 AM WEATHER: Rain 700F EST. % OF COMPLETION: WORK IN PROGRESS None PRESENT AT SITE Brad Subrin Brian Jones, Superior Scott Brattain, Superior Brian Werner, Superior James Ochs, Carmel Building Inspector OBSERVATIONS: . Work to be completed prior to covering with drywall: o (2) #10 screws between track and track top and bottom. o Vents through roof at rear and front of building. o Gaps in wall board between west at second floor window head height shall be filled, . taped and spackled. . Fire stopping at top of all walls. ITEMS TO VERIFY: o Flue support, flue distance to property line and distance to parapet wall. INFORMATION OR ACTION REQUIRED: o The fire rating on the West Wall is not completed. (Brian Jones is investigating) o Mr. Ochs' satisfaction with the quality of the roof trusses. ATTACHMENTS: Drawing of Detail 4 sheet A4 showing screws and attachments required. The installation was changed from the original design. iTEMS TO COMPLETED: o Screws between track and old wall. o Masonry anchors and screw attachments. o Received truss shop drawings. o Received Work proposal from A-1 for corner piers. o Mechanical and Electrical review items as approved by Mr. Ochs. REPORT BY: Bob Homburg CC: Brad Subrin, Jeff Sipe and Brian Jones Page 1 131 NORTH RANGELlNE ROAD . CARMEl, IN 46032 . (317) 846-4687 . FAX (317) 844.7943 Commercial and Industrial Contractors August 29, 2005 Superior Contractors, Inc. 2209 E. Beecher, Suite A Indianapolis, IN 46203 Attn. Scott Brattain RE: DfCauck & MCLean 30 I" Ave SW Dear Scott, LaFever Electric, Inc. Has made an inspection of the site listed above and will make the following changes when we can again access the job. I) Complete the bonding of junction boxes that had not yet been completed. 2) Install type HCF MC cable to the reccptacles and make home runs for them with type HCF MC cable that will have equipment that will come in contact with the patients. The above items were discussed with the inspector Jim Ochs and we were in agreement. If you have any questions or I can be of further assistance please do not hesitate to call. Sincerely, Chris A. LaFever From: To: Attn: Excel Mechanical loc 3005 S. Rwal St Indpls. In. 46237 Superior Contractors Brian Jones Copper tube supports Sch 40 PVC Horizontal I Yz" & smaller every 6' All sizes every 4 feet Stud guards protecting plumbing pipes Date: 8/30/05 (317) 788-0622 (fax) 788-0759 Job: Dr. Lauk Verticle Each floor not to exceed 10' Base & each floor, mid story guides