HomeMy WebLinkAbout05030003-CorrespondenceApril l'9, 2005
Foundation picm Lot 29. Hayd~a M~aows
To Whom It May Concern.
The sides of the p~ers z~r~ ch~k~ with ~kit leve. h. I; was d~uamined ~ ail pi~a~.~ w=e
plumb, wilton acee~ted ~ieranaas. The grcat~ deviation found was 5,~ inch. For pior~ of/~.i*
siz~ that is r~o l>rob!em.
Very WAy yours,
'~ioara 0 A~txi~t .~./
COpy:
Box g37
Zio~i[l~. l~q 46077
INSPEtTION WORK LOG - ONE PER PAGE DETAIL FORMAT PAGE-09i
PRINTED ON 04/2~/05
PERMIT NU
PERMIT TYPE: RESSINC
USAGE CLASS: RES
12903 REEDY CT
RESIDENTIAL SINGLE
RESIDENTIAL
FAMILY
CARMEl
DWELLING
SPECIAL :LOT 29,
PERMIT :
CONDITIONS:
AND NOTES :
HAYDEN RUN MEADOWS.
PARCEL ID: ZHRN029
LOT: 29 BLOCK: 2
SUBDIVISION: HRN HAYDEN RUN
OWNER: CENTEX HOMES ~440
GEN CONTRACTOR:
CONTRACTOR NAME:
P
INSPECTION TYPE:
INSPECTION AREA:
SCS~D DATE:
CONTACT INFO:
INSPECTOR:
CENTHOM
CENTEX HOMES
ATTN: SHANNON
PRTMOOR R.T. MOORE CO.,
00 PROJECT NOTES
04/20/05 INSPECT TIME:
AJS SCHRINER, ADAM J.
INSTRUCTIONS:
COMMENTS:
INC.
SINGLE FAMILY HOME.
ALLISON POINTE BLVD, ~200
{317 915-2200
317 291-1052
SEE NOTES
INSPECTION NOTES:
Gary Kohnke, future home owner, came rc
our office with concerns aboun his
foundation. He provided us with
pictures /filed) and pointed out his
concerns after no~ get~%ng a response
from Cennex. After revzewlng the
photos, Jeff and I concluded that the
foundation issues pointed out needed nc
have an engineer evaluation done on it.
Chuck Seale showed me the engineers
report out in the field. ~he lot was
missed numbered so I t¢ld .huck to
contact Weber concrene, who hirec
Richard Albright) and get a new letter
with the correct lot n~mber and
subdivision on it with additional
verbage stating the engineer had
reviewed the pictures provided to Chuck
from Gary. I requested the enqineer
also address the positioning ot the
footing/pier in relation to the
dirtwall edge and the footing. AS of
right now we are waiting on the letter
fr6m the engineer. AS
RESULTS: PASS FAIL CANCEL RE-FEE FAIL CODE:
NOTES:
PRIOR INSPECTION RESULTS:
00 PROJECT NOTES
INSPECTION NOTES:
04/20/05 N SEE NOTES AJS
Gary Kohnke, future home owner, came to
our office with concerns about his
foundation. He provided us with
pictures (filed) and pointed out his
~oncerns after not getting a response
from Centex. After reviewing the
~hotos, Jeff and I concluded that the
oundation issues pointed out needed to
have an engineer evaluation done on it.
Chuck Seal~ showed me the engineers
report out in the field. ~he lot was
missed numbered $o I told ~huck to
consac5 Weber concrene, who hired
Richard Albright and ge5 a new letter
with the correct lot number and
subdivision on it with additional
verbage statinq the engineer had
reviewed the pictures provided to Chuck
from Gary. I requested the enqineer
also add~ess the positioning ot the
footing/pier in relation to the
dirtwall edge and the footing. As of
right now we are waiting on the letter
from the engineer. AS
~1 LOWER FOOTING 03/24/05 P JEB
~2 UPPER FOOTING 03/24/05 P JEB