Loading...
HomeMy WebLinkAbout05080226-Misc. (3;[7) S7:b2444 lnity Services i & Code Enforcement Carmel, IN 46032 OK TO INSUL~TE: (Znsulation on/y--no drywall) NO ~ A ~96,25 Commercial, Muki-Famiiy, ]nstituUonai, or Zndustrial reqnspe~Jon fee will ~ assessed, Yes ri No ~ A ~TE FEE has been as~sse~ for:~ In the amount of: INSPECTOR: -./ DATE. TheNuAireNU-2Oland NU-301 Horizontal Both models achieve minimal air Laminar Airflow Workstations are turbulence by making the wort~ area specially designed to provide the ideal enaosure zone an extension of the HEPA particle-free, bacteria-free, clean-air filters·actual flow area. The clean filtered, environment needed for laboratory uniform velocity air is then allowed work, testing, manufacturing, inspection, to flow outward m streamlines, or pharmaceutical procedures, eliminating "backwash". HEPA Filters create true All NuAire clean workstations use ~gh Mr (HEPA) filtration zone. for their supply air systems. The HEPA filters are rated 99.99% efficient for all particulate matter of 0 3 microns, w~tn greeter collection efficiency for larger and/or smaller particles. The life of the HEPA filter is extended by: 1) disposable fiberglass prefilters, which collects atmospheric dust; 2) an adjustable motor-speed controller, which NU-201 NU-301-424 maintains proper airflow requirements: Uneven particulate loading is orevenrec and 3) a high-capacity motor/blower, by maintaining high~static pressure over which automatically maintains consiJcent the entire filter surface. fitter pressure assuring uniform velocities. Performance and Quality Zero Leak Airflow the NU-201 and NU-301 are superior NuAire's HEPEX'" Zero Leak Airflow :lean workstations because they are se special built-in System provides quiet, uniform velocities throug~ the entire sterile work zone. NuAires system surrounds ali positive pressure flow chambers and ducts with vacuum (or negative) air pressure relati, to the room. This feature eliminates t~ possibility of cabinet and gasket lea~  I and allow viewing of the workstation by other personnel. ~; ~ ·Controls, adjustments, prefiltersand HEPA filters are conveniently accessible ~'~ from the front of the unifo Performance Specification ISo 14644 Airflow Control System Motor Speed Control; Factory sat at gO fpm (,46 m/s): regulated by solid state tralc motor speed controller HePA Filter: One (Supply) disposable extend- ed media, dry type tilter rate eir- Prefiltera; Fiberglass disposable Sound: Acceesorles a~d Options Less than 62 dba against ambi~n~ Ultraviolet Light 55 dba Electrical Requirements t1S VAC, 60 HZ single phase 8 fl, 3 wire grounded flexible power cord separate circuit breaker for cabinet moran an~ ights A I electrical components are U L Lis{e~ ar Recognized, Standard Features HEPEX Zero Leek Airflow System Clear TOp/S{de Acrylic Panels Textu[ed Powder Coat Ute[hone Finish Smooth Whi~e Formica~ Work Surface Front Maintenance Fluorescent Light Protec[we Fiber Grill Fiberglass Disposable Prefilter Full lnstr~ment Panel Minthelic Gauge Outlet Service Valves Ground Fault Interrupter (GFI) IV Bar Base Support Stand for NU-201 Footresl Storage Trays Stainless Steel Work Surface which may cause the product specifications to change, Please 11/08/2005 16:12 FAX 317 875 0434 [ L ^ S ~002/002 November 8, 2005 Rich Adams Laulb Proper~y Oroup 40~ Pem~yl~a P~kway lndi~apolis, ~ 462S0 De~ Rich, i ~ ~tt~g~respo~e~ yo~ ~ue~on at ~21 gSA ~ should have quid nitrogen ~orng¢ tn~a. PJeasc feel flee m cai: SincereIy~ COlen Adaniy~ Ph D Laboratory Director Midwes Fertility Spec/Mists Message I'Italy'S ?age 1 of 2 Adams, Richard From: Craig Mccormick [cmccormick@architectsfommilc com] Sent: Monday. November 28, 2005 9:40 AM To: Adams, Richard Subject: FW: Midwest Fertility ~ City of Carmel Inspection ,~ Rich - I thought your question was answered be ow by Sam Hurt~ N trogen s not flammable. Embryo storage are A~(~) tanks which use nitrogen as a refrigerant so embryo storage s not requ red to be rated The medgas rooms are 1-hour rated because of storage of oxygen They ~re a so Vented per ,~ode and have a 'blast wail' the ~ ~ia~ing/ventad wa t) · ( L-~Craig ..... Original Message Fro~= ~am Hurt [mailt:O:shurt@ob~?)esengrg~com] Sen,l:, Friday, November 04, 2005 J,l.:00 AH To= Adams, R'chard'.: Craig Mcr~ormtck Cc, Burge Hark, Eppink, John, Cusano, Breck Glen Adamya, ]oberhes@obeHtesengrg corn, George Russell Sul3jecl~= RE: Midwe~: Ferti ity - City of C~rmel [nspecti0n Rich: Nitrogen is neither ~ quid nitrogen First, any leak is not detactable by ours enses Thanks very much Sam Hurt ..... Or. iginal Message ..... . From= Adams, Richard [ma Ito. RAdams@lauth.net:] se,hr: Friday, November 04, 2005 10:18 AH To~ Sam Hurt; Craig McCormick Cc: Bu~,e, Hark Subject= Midwest Fertility - City of Carmel Inspection Importance: High Gentlemen: At yestarday's inspection Jim Ochs of the Cty of Carmet asked for some information to ved~ wa I rat ngs as it applies to the rooms housing liquid nitrogen (cryogenics), He asked if the Cryogen cs f~ I under the oxidizing or flammable use gr0ul~ which would make the wall rating either 1 hour ~r 2 hour based on the building class. I know that I am probably mixing up terms here, so simply put, I need to know how the gas storage room (first floor) and e~bryo st(~rage room use groups and fire r:afings were determined. Your assistance is greatly appreciated~ Thanks Rich Adams Project: Coordinator, Construction Operations 11/28/2005 Message Page 2 of 2 Lauth Construction~ LLC (317)663-.6304 DireCt Fox {3!7)428-6304 Corporate F,a.x: (317)848-651 P_e~ p. le, Tm st. Ex P__e rj.e._n.c_ e?m 1 t/28/2005 Notice Ochs, James A From: Adams, Richard [RAdams@lauth.net] Sent: Monday, November 28, 2005 3:46 PM To: Ochs, James A Cc:' Burge, Mark; Cusano, Brock Subject: North Meridian Medical Pavilion - Midwest Fertility - Violation Notice Mr. Ochs: permit # 05080226 (12' '~ for the Midwest Fertility sune. Th s -3-05, items #2 and #3. beer Thi working environment. This unit d utpment is actually an airflow a NU-301-4~. the filter he,gm nas along the work surface maintaining a t iS uid Nitrogen to be stored within the )age 4. On page 5 is email was flammable since the nitrogen is used as a gasses, the gas storage room ired rating and venting. not hesitate t~ I h~pe this meets your needs for these issues. If you require further information, please Od umentation.pdf>> Rich Adams Project Coordinator, Construction Operations Lauth Construction, LLC 17)428-6304 Web ht~p Since 1977 Lauth has been building facilities for its clients to lease or own throughout the United States. Lauth's years ofsolid experience coupled with $ billions worth of completed projects, make it one of the nation's teading development and construction firms. Lauth delivers all types of facilities including healthcare, industrial, office, and retail f~om offices in Indianapolis, Charlotte, Dallas, Den~er, Orlando, and PhoeniX. People. Trust. Experience.sm 29/2005 -. .c. System No. C-AJ-1346 F Roting - 2 Hr T Roting - 0 Hr cD ...- .., :;f u - <Q <Q 056 '80 220 GA v{'~ SECTION A-A /2/89 /)IJQ./.f)IIlJ 1. Floor or Wall Assembly -- Min 2-1/2 in. thick reinforced lightweight or normal weight (100-150 pcf) concrete. Wall may also be constructed of any UL Classified Concrete Blocks'. Max diom of opening is 3 in. See Concrete Blocks (CAll) category in the fire Resistance Directory for nomes of manufacturers. 2. Through-Penetrant -- Max one flexible metal pipe or conduit installed concentrically or eccentrically within opening. The annular space between penetrant and periphery of opening shall be min of 1/2 in. to max 1-1/4 in. Penetrant to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of penetrants may be used: A. Flexible Steel Conduit+ -- Nom 1 in. diam (or smaller) flexible steel conduit. See Flexible Metal Conduit (OXUZ) category in the Electrical Construction Material Directory for names of manufacturers. FlRESTOP SYSTEMS Reproduced ~ HILTI, Inc. Courtesy of Underwriters LobonJtorles, Inc. October 30, 2003 0'i;.SIFIL' I:J~O C~US Pogo: 1 of 2 C=JDb~D" .~. ,- System No. C-AJ-1346 F Rating - 2 Hr T Rating - 0 Hr <.0 "<l- n :t ~ B. Through Penetrating Praduct' -- Flexible Metal Piping -- The fallowing types af steel flexible metal gas piping may be used: 1. Nom 1 in. diam (ar smaller) steel flexible metal gas piping. Plastic covering on piping may ar may not be removed on both sides of floor or wall assembly. OMEGA FLEX INC 2. Nom 1 in. (25 mm) diam (or smaller) steel flexible metal gas piping. Plastic covering on piping may or may not be removed on both sides of floor or wall assembly. 11TEFLEX CORP A BUNDY CO 3. Nom 1 in. (25 mm) diam (or smaller) steel flexible metal gas piping. Plastic covering on piping mayor may not be removed on both sides of floor or wall assembly. WARD MFG INC 3. Firestop System -- The firestap system shall consist of the following: A. Packing Material -- Min 1 in. thickness of min 4.0 pcf mineral wool batt insulation firmly packed into the opening as a permanent form. Packing material to be recessed from top surface of floor or both surfaces of wall as required to accommodate the required thickness of fill material. B. Fill, Void or Cavity Materials'--Sealant -- Min 1/2 in. thickness of sealant applied within annular space, flush with top surface of floor or both surfaces of wall. HIL 11 CONSTRUC110N CHEMICALS, DIV OF HIL 11 INC -- FS-ONE Sealant 'Bearing the UL Classification Mark FlREsrap SYSTEMS Reproduced by HlLll, Inc. Courtesy of Undenrriter.l laboratories, Inc. October 30, 2003 ~S/F/", ~~o C ~ US I Poge: 2 of 2 C:=JDb~D.