Loading...
HomeMy WebLinkAbout0002.98 Sewer/Water Permit/s'pray,/Z;�V,(y$vs.�.�rA�ec.ayrrtvy,,k"r7w..'�'"MYY"�d'(iti5�1jY.^rrr'Y�"'qv�-h'"R'tt,vrYv+""�!iy'Sui1,^TiK.�:i.�`T'h���e:%YiN! �'�niG?t�lk4'•�j�'j,*`kid4f,'f+'� `City o'f Carmel' Application for SEWER PERMIT PERMIT NOt:,2.707 DATE: APPLICATION IS HEREBY"MADE FOR PERMISSION TO. CONNECT THE BUILDING AT: SUBDIVISION: a LOT'NO;, SECTION NO: ADDRESS:. 3� STREETS , WITH THE PUBLIC SEWER `ON —��—! Teti STREET. THIS APPLICATION.IS MADE BY '77 (OWNER OR AUTHORIZED PLUMBER) BUSINESS ADDRESS: TELEPHONE: THE'PLUMBER'MAKING INSTALLATION WILL BE:'+ ,.n2 Evc,vc}(�.5 PHONE: PLUMBER'S BOND -EXPIRES: PERMIT'ISSUED BY: (signature) ox The building sewer shall bey pvc sewer pipe meeting ASTM specifications 3034 SDR 35 of latest revision; orvitrified'clay pipe, meeting.ASTM.specifications C=700 for extra strength clay pipe of.latest;revision:,unless other'; materials areLhbreby permitteclin writing. The sewer shall be<installed in accordance with ASTM G12 for extra strength clay pipe and ASTM 2321 for pvc:pipe and :the Uniform Plumbing Code for -the State of Indiana. All installations shall be in strictcompliance with pertinent City of Carmel ordinances'. All building sewers shall be 6"' diameter. . All installations shall' be 'open trench" 'inspected and` aoproVed by the carmel. sewer• department before anv bac"llino is done Non-compliance imay result in digging up the" - sewer"installation and/or denial of future sewer permits and/or'denial;of water connections. No footing or foundation drains or other sources of; ground water or storm water shall be,, 'permitted to enter the public sewer: No inspections or installations will be made: on Situ rday'or.Sunday or holidays unless arrangements are made at least 24 hours in;;advance. All plumbers' o'r contractors installing sewer (or water) :lines shall have a plumbers bond posted with the CITY ENGINEER'S OFFICE. ;If any street;,must be.;cut, a separate street cut_permit shall°be'obtained.. I have read, 'rdone,under i signed-,^ Special cc /,n conditions of this permit 'and agree to accept the responsibility for all work