ON-SITE EVUATI
O • ON FOR EROSION AND SEgikIENT CONTROL
?j Hamilton County Soil and Water Conservation District
�` 1108 South 9`h Street,Noblesville, IN'46060 S P
1� ! Telephone: 317-773-2181 Fax : 317-776-1101 C 10 —C?fl
Date: 9// �/O Z. ,
Project Name: /416 H G g DUE
I
I Present at Site: John South,Hamilton Co. SWCD,
t
This report was Provided To: E.5 ra t06 a Doti, f# NI tOc,c Boa Da es CAenE . '
! ` /o yI +J. Nita Sr. YEto kJESTPOiMT Dk Sv toE iZ
l AZNEL, =N Sol TE lop F/LE '
! '1603 C. ,=NDIaw4lbttS,Vie/
II Type OF EVALUATION: ' zi4
❑ Initial ($1 Routine 0 Follow-up 0 Complaint
!I This evaluation is intended to assess the level of compliance with 327 IAC 15-5 (Rule 5). It is also intended to identify areas where
additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be
evaluated as to their feasibility by a qualified individual with structural practices,designed by a qualified engineer.
( All erosion and sediment control measures shall meet the design criteria,standards,and specifications outlined in the
I' "Indiana Handbook for Erosion Control/in Developing Areas" or similar guidance documents.
Current Site Information: 5/TE Woek COI{Pi.E Tel)
,I !:/acre Je.a..,OiNG Co '7'HU)S
II
I
The Following Items Have Been Evaluated and Assigned a Designation of:
S=Satisfactory M=Marginal U=Unsatisfactory NA=Not Applicable'
Construction Site Management for Erosion and Sediment Control
' S U NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
j sediment control measures.
1 S 0 U NA (2) Appropriate perimeter sediment control measures have been implemented.
(V M U NA (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
Sf.,) M U NA (4) Erosion&sediment control measures are installed properly.
p M U NA (5) Storm drain inlets have been adequately protected.
M U NA (6) Outlets have been adequately stabilized.
I S U NA (7) Existing erosion&sediment control measures are being maintained.
I Q M U NA (8) Public&private roadways are being kept clear of accumulated sediment or tracked soil.
1 S 0 U NA (9) Erosion&sediment control measures have been installed and maintained on individual building sites.
Status of Sediment Retention On-Site
® Site conditions present a high potential for off-site sedimentation.
II There is evidence of off site sedimentation.
0 Description provided:
I
I
(� Please Refer to the Comments Section of this Report
/Compiled By:Definitions
Satisfactory: The item is currently in compliance with the rule
Marginal: A concern has been identified; corrective action is strongly recommended to remain in compliance
Unsatisfactory: A violation has been identified and the site is not in compliance; corrective action is required
Not Applicable: Does not apply at this stage of construction Revised 4/98
I!
I i A
•
• 1
ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL
! i
COMMENTS
PROJECT NAME: ,/0GH GRDUE
I I I
The itbms checked below must be corrected prior to, /0 13=O Z. ,unless otherwise noted.
0 I (stall an appropriate sediment control practice between construction areas and lower lying areas.
I I
o Replace/Repair silt fence and/or straw bale barriers. •
o ntrench silt fence(6-8 in.)and/or straw bale barriers(4—6 in.)and stake straw bales.
o remove accumulated sediment from: o sediment traps/basins,o behind silt fence/straw bales, 0 around storm drain inlet
I
protection devices,0 streets and gutters(Do not flush with water)
Temporary seed,fertilize,and/or mulch: Cod Tv fir ED 11JeFr1S TWAT DOA' ' //Adde. ARRIZ tcUEE
0 li'ermanent seed,fertilize,and mulch areas that are at final
rade: •
o protect storm drain inlets:0 curb inlets,0 drop inlets
o Reshape and stabilize sideslopes of: 0 sediment traps/basins, 0 detention/retention basins
o Install/Maintain construction entrance(s):
o Reshape and stabilize conveyance channels:
o place greater emphasis on erosion and sediment control on building sites; contractors,subcontractors,material vendors, and
others should be made aware•of erosion and sediment control requirements. Appropriate perimeter!sediment controls
(e.g.silt fence)and stable construction entrances shall be utilized on all sites. Sediment tracked into the street shall be
removed(do not flush with water)at the end of each work day. I I I
% Other Requirements:
• �G
- o I
drr do Tcu ficmt b(U ti
•
cK e. r- ,.,c s. c Adcr co _ ocfr .
For questions regarding this report contact: John South