Loading...
2013 Illinois St pay request 08 IlUa+ U 0 0 0 U1)WI, Au nu 000 p ® o CITY OF c\ ARMEL JAMES I3RAINARD, MAYOR EXHIBIT B Disbursement Direction #8 E-Mail or Fax the signed Disbursement Direction to: The Huntington National Bank Corporate Trust Department (INHP22) Attn: Kim Wilson Tel: (317) 229-4094 Fax: (317) 229-4094 E-Mail: Kim.Wilson @huntington.com Re: Depositary Agreement between the City of Carmel and the Huntington National Bank, - Construction Account#4087000986 Dear Kim: On November 12, 2014, you are hereby authorized and directed as the Depositary under the above- referenced Agreement, to pay the amounts set forth on the attached Register of Claims from the above- referenced Trust account and overnight checks to: Carmel Engineering Department Attn: Kate Lustig 1 Civic Square Cannel, IN 46032 City of Cannel, Indiana By: Name: Diana L. Cordray Title: Clerk-Treasurer * Your Alternate contact at Huntington National Bank will be: Ellen Campbell Tel: (616) 235-5941 E-mail: Ellen.Campbell @huntington.com DEPARTMENT OF ENGINFERIN6 ONE Civic SQUARI:, CAinIEI.. IN 46032 Orru:r: 317.571.2441 FAx 317.571.2439 I.?IAIl, rnFinec•rint JCarmel.ill EQv Illinois Street Bond Construction Account#4087000986 Disbursement Request#08 November 12, 2014 PAYEE AMOUNT DUE CHARACTER OF EXPENDITURE ALL CHECKS LISTED HEREON TO BE MAILED TO KATE LUSTIG CITY OF CARMEL;ENGINEERING ONE CIVIC SQUARE;CARMEL,IN 46032 317-571-2432;KATE LUSTIG i Unless Otherwise Stated E8B Paving, Inc. $280,692.37 Project 10-10;Illinois Street Extension 17042 Middletown Avenue Invoice#8;PO#25297 Noblesville,IN 46060 Construction TOTAL $280,692.37 CONSTRUCTION PROJECT INVOICE DATE: November 11, 2014 COMPANY NAME: E&B Paving, Inc./Gradex, Inc. JV AND ADDRESS 17042 Middletown Avenue Noblesville, Indiana 46060 12900 N. Meridian Street, Ste. 120 Carmel, Indiana 46032 TELEPHONE NO.: (317)-773-4132 FAX NO.: (317)-773-4137 PROJECT NAME: Illinois Street Extension — City of Carmel Project#10-10. PROJECT NO.: 10-10 INVOICE NO.: 8 Construction pay items as per Progress Pay Estimates No. 8 as shown on the attached invoice for work completed between the dates of October 1, 2014 to October 31, 2014 TOTAL PAY THIS ESTIMATE: $311,880.41 MINUS 10% RETAINAGE: (-) $31,188.04 TOTAL NOW DUE: $280,692.37 Submitted by CrossRoad Engineers, PC P4/4 Project -resentative - gned name Date Lance Stahley Project Representative - printed name 1 of 6 CITY OF CARMEL CARMEL-ILLINOIS STREET EXTENSION PROJECT NO.10-10 PROGRESS PAY ESTIMATE NO. 08 For work done during the period of: 10/1/14 through 10/31/14 111'4,a P zP w a, ,§m «, a met r, U,. s r , s [ gym € Y ,,?en { $ wD po , 1e r E x Quany tti h iz To qatiy ie 4 r` Uit 41 1 Towta fiPp al P a k r N 7_,I0 M IN OI u rndfi e t l p Est�ma€e o Oate �, I*4 ne.1 t hiEstimate 7 o Dae g f,l� es;z� s 91 �:4pii- ar RS - « 0 1 � s : l L, ,k � 3 w n«e e , am A 1 CONSTRUCTION ENGINEERING LS 0.75 15 $75,000.00 $56,250.00 2 MOBILIZATION AND DEMOBILIZATION LS 1.00 LS $273,57000 $273,570.00 3 CLEARING RIGHT OF WAY LS 0.95 LS $75,000.00 $71,250.00 _ 4 PAVEMENT REMOVAL 43.98 SYS 43.98 SYS $10.00 $439.80 $439.80 S PAVED SIDE DITCH,REMOVE _ LFT 96.00 LFT $8.00 $768.00 6 CURB,CONCRETE,REMOVE LET LET $5.00 7 CURB AND GUTTER,REMOVE LET 2700.00 LET $4.50 $12,150.00 8 INLET,REMOVE EA 9.00 EA $415.00 $3,735.00 9 GUARDRAIL END TREATMENT,REMOVE EA EA $250.00 10 MAILBOX ASSEMBLY,REMOVE EA EA $300.00 11 LIGHT STANDARD AND FOUNDATION,REMOVE EA 3.00 EA $300.00 $900.00 12 PIPE,REMOVE 9.60 LFT 478.60 LFT $16.50 $158.40 $7,896.90 13 EXCAVATION,COMMON CYS 25839.00 CYS $7.15 $184,748.85 14 BORROW CYS 5504.00 CYS $1.00 $5,504.00 15 TEMPORARY EROSION&SEDIMENT CONTROL, CURB INLET PROTECTION EA 33.00 EA $85.00 $2,805.00 16 TEMPORARY CHECK DAM,REVETMENT RIPRAP TON 176.32 TON $26.50 $4,072.48 17 TEMPORARY DITCH INLET PROTECTION EA 1.00 EA $85.00 $85.00 18 TEMPORARY MULCHING TON 14.85 TON $700.00 $10,395.00 19 _TEMPORARY SEDIMENT TRAP TON _ 60.28 TON $26.50 $1,597.42 l20 TEMPORARY SILT FENCE LFT 4681.90 LFT $1.25 $5,852.38 21 NO 2 STONE TON 294.04 TON $17.25 $5,072.19 22 SUBGRADE TREATMENT,TYPE IA SYS 8269.70 SYS $6.25 $51,685.63 23 SUBGRADE TREATMENT,TYPE IIIA SYS 547.20 SYS $6.10 $3,337.92 24 STORMWATER QUALITY STRUCTURE,1.0 CFS EA 2.00 EA $19,100.00 $38,200.00 25 STORMWATER QUALITY STRUCTURE,1.6CFS 0.54 EA 0.54 EA $25,150.00 $13,581.00 $13,581.00 26 STORMWATER QUALITY STRUCTURE,3.0 CFS EA 1.00 EA $39,250.00 $39,250.00 27 STRUCTURAL BACKFILL,'I'YPE 1 68.00 CYS 2315.14 CYS $21.15 $1,438.20 $48,965.21 28 STRUCTURAL BACKFILL,TYPE 2 CYS CYS $27.15 29 CHEMICAL MODIFICATION,SOILS SYS 1906.10 SYS $5.45 $10,388.25 30 COMPACTED AGGREGATE,No.53,BASE TON 794.13 TON $20.00 $15,882.60 31 COARSE AGGREGATE,NO 8 TON TON $40.00 _ 32 COMPACTED AGGREGATE,NO.53, TON 93.19 TON $30.00 $2,795.70 33 MILLING,ASPHALT,1 1/2 IN SYS 153.34 SYS $12.50 $1,916.75 >IMPAC" 35 IIMA,INTERMEDIATE,TYPE C,06,19.0 MM _ TON 800.81 TON $49.00 $39,239.69 36 FIMA SURFACE,TYPE A TON 119.39 TON $86.00 $10,267.54 37 HMA SURFACE,TYPE C TON 615.06 TON $78.00 $47,974.68 38 HMA INTERMEDIATE,TYPE TON 289.30 TON $59.00 $17,068.70 39 HMA INTERMEDIATE,TYPE C TON 869.66 TON $53.00 $46,091.98 40 HMA BASE,TYPE C TON 2701.59 TON $52.00 $140,482.68 41 HMA FOR APPROACHES,TYPE B TON 174,70 TON $75.00 $13,102.50 42 ASPHALT FOR TACK COAT TON 0.44 TON $1.00 _ $0.44 43 CONCRETE PAVEMENT,TRUCK APRON,7" SYS 381.00 SYS $47.52 $18,105.12 44 GUARDRAIL,REMOVE LET LFT $5.00 45 GUARDRAIL,END TREATMENT,OS EA EA $3,000.00 _ 46 GUARDRAIL,W-BEAM,6 FT 3 IN SPACING LFT LET 530.00 47 CURB,CONCRETE,STRAIGHT LFT 250.00 LET $14.00 $3,500.00 48_CURE RAMP,CONCRETE,C SYS 62.60 SYS $117.00 $7,324.20 49 CURB RAMP,CONCRETE,L SYS 36.20 SYS $106.00 $3,837.20 SO HANDRAIL,PEDESTRIAN LOT LFT $145,00 51 CURB AND GUTTER,TYPE II LOT 2122.95 LFT $12.00 $25,475.40 52 CURB AND GUTTER,TYPE III LFT 1222.70 LET $12.00 $14,672.40 T 53 CURB,MODIFIED,ROLL LOT 336.00 LET $16.00 $5,376.00 54 PCCP FOR APPROACHES,9 IN. S S $45.00 55 MAILBOX ASSEMBLY,SINGLE EA EA $200.00 56 GEOTEXTILES SYS 1207.82 SYS $1.12 $1,352.76 57 RIPRAP,REVETMENT TON 255.65 TON $21.00 $5,368.65 58 SCREENING WALL CS LS $142,150.00 59 MOBILIZATION AND DEMOBILIZATION FOR SEEDING EA 2.00 EA $200.00 $400.00 60 EROSION CONTROL BLANKET SYS 4502.07 SYS $1.17 $5,267.42 61 SEED MIXTURE,T LOS LES $1.35 _62 MULCHING MATERIAL 1.10 TON 1.78 TON $400.00 $440.00 $712.00 63 WATER Kgal Kgat $1.00 64 TOPSOIL CYS CYS $1.00 65 SODDING,NURSERY SYS 807.22 SYS $3.10 $2,502.38 66 IRRIGATION,CONDUIT,PVC,4IN. LFT 356.00 LFT $11,40 $4,058.40 67 FIELD OFFICE,C 1.00 MOS 6.00 MOS_ $1,500.00 $1,500.00 $12,000.00 I 1 2 of 6 CITY OF CARMEL CARMEL-ILLINOIS STREET EXTENSION PROJECT NO.10-10 PROGRESS PAY ESTIMATE NO. 08 For work done during the period of: 10/1/14 through 10/31114 3''i T,1 e a rim @ ! 4 i , k. p u,a 6 v t r '� ,Y " `gi via$'' i ° i r Item Decription N: Qtity thi l Total Quantityi g Unit v TotalPay F Tota Pa No€: aV,r * FK la xt YEstima 2 fr1 irt DDae p � Price A A SEst mate 4 i�'Vi.ta Date 4.0.atf 11m i li. ga1� �iF I„ � a`t11:0114614013,? s v� 4 e ` . Z� 9 E: i ' aalSbMESi STRUCTURE,REINFORCED CONCRETE BOX 68 SECTIONS,9 ET X 3 FT LFT 150.00 LFT $497.35 $74,602.50 69 PIPE,REINFORCED CONCRETE,CIRCULAR,12 IN 29.90 LFT 834.90 LFT $33.25 $994.18 $27,760.43 70 PIPE.REINFORCED CONCRETE,CIRCULAR,15 IN LFT 16.50 LFT _ $36.00 $594.00 71 PIPE,REINFORCED CONCRETE,CIRCULAR,18 IN 191.00 LET 756.25 LET $39.00 $7,449.00 $29,493.75 72 PIPE,REINFORCED CONCRETE,CIRCULAR,24 IN I,FT 299.00 LEE $51.00 $15,249.00 73 PIPE,REINFORCED CONCRETE,CIRCULAR,30 IN LFT 74.00 LFT $76.00 $5,624.00 74 PIPE,REINFORCED CONCRETE,CIRCULAR,36 IN LFT 196.80 LFT $87.00 $17,121.60 75 PIPE,REINFORCED CONCRETE,CIRCULAR,54 IN _ LFT 159.00 LFT $138.00 $21,942.00 76 PIPE,REINFORCED CONCRETE,CIRCULAR,60 IN LFT LFT $191.00 77 _VIDEO INSPECTION FOR PIPE _ LFT LFT $1.20 78 PIPE,TYPE 4 CIRCULAR 6 I LET 1426.50 LET $5.20 $7,417.80 79 AGGREGATE FOR UNDERDRAINS CYS 122.68 CYS $32.00 $3,925.76 80 VIDEO INSPECTION FOR UNDERDRAINS LET _LET $0.95 81 GEOTEXTILES FOR IJNDERDRAIN SYS 1062.17 SYS $1.00 $1,062.17 82 INLET,CAP EA EA $460.00 83 INLET,E7 EA 1.00 EA $1,275.00 $1,275.00 84 INLET,F7 EA EA $1,300.00 85 INLET,J10 1.00 EA 7.00 EA $1,600.00 $1,600.00 $11,200.00 86 INLET,M10 EA 4.00 EA $1,600.00 $6,400.00 87 CATCH BASIN,117 EA 1.00 EA $1,500.00 $1,500.00 88 CATCH BASIN,K10 1.00 EA 11.00 EA $1,700.00 $1,700.00 $18,700.00 89 PIPE CATCH BASIN,18 IN EA EA $1,300.00 90 MANHOLE,C4 4.00 EA 16.00 EA $1,800.00 $7,200.00 $28,800.00 91 MANHOLE,L4 EA 1.00 EA $5,900.00 $5,900.00 92 MANHOLE,J4 EA 6.00 EA $2,900.00 $17,400.00 93 CATCH BASIN,M10 1,00 EA 4.00 EA $1,900.00 $1,900.00 $7,600.00 94 STRUCTURE,REINFORCED CONCRETE THREE- SIDED SECTIONS,240 IN X 72 IN LET 142.79 LEE $2,029.50 $289,792.31 95 SANITARY STRUCTURES,ADJUST TO GRADE EA EA $920.00 96 PUMP-AROUND EA 1.00 EA $12,000.00 $12,000.00 97 ROAD CLOSURE SIGN ASSEMBLY EA 18.00 EA $270.00 $4,860.00 98 DETOUR ROUTE MARKER ASSEMBLY EA 18.00 EA $100.00 $1,800.00 99 CONSTRUCTION SIGN,A EA 12.00 EA $200.00 $2,400.00 100 MAINTAINING TRAFFIC LS 0.75 LS $23,866.61 $17,899.96 101 BARRICADE,111B LFT 224.00 LET $10.00 $2,240.00 102 DECORATIVE STREET SIGN ASSEMBLY EA 100 EA $1,425.00 $4,275.00 103 SIGN POST,SQUARE,TYPE 1,REINFORCED ANCHOR BASE LET 221,60 LET $11.00 $2,437.60 104 SIGN,SHEET,WITH LEGEND 0.080''THICKNESS SET 80.60 SET $14.00 $1,128.40 105 SIGN,SHEET,WITH LEGEND 0.100"THICKNESS SFT 77.65 SET $15.00 $1,164.75 DECORATIVE STREET LIGHTING,WIRING AND 106 INSTALLATION EA 5.00 EA $8,875.00 $44,375.00 107 CABLE INTERDUCT LFT 862.00 LFT $9.50 $8,189.00 108 LIGHTING POWER DISTRIBUTION PANEL EA 1.00 EA $5,200.00 $5,200.00 109 HANDHOLE,LIGHTING EA 8.00 EA $600.00 $4,800.00 110 CONDUIT,STEEL,GALVANIZED,2 IN LFT 185.00 LFT $10.50 $1,942.50 111 WIRE,NO 6 COPPER IN PLASTIC DUCT,IN CONDUIT 41/C LET 185.00 LFT $7.25 $1,341.25 112 WIRE,NO 6 COPPER IN PLASTIC DUCT,IN TRENCH, 4 1/C LET 477.00 LFT $7.25 $3,458.25 113 HANDNOLE EA 2.00 EA $850.00 $1,700.00 114 TRANSVERSE MARKING,THERMOPLASTIC, "SHARKS TEETH" LFT 37.00 LET $5.00 $185.00 115 LINE,THERMOPLASTIC,BROKEN,WHITE,12 IN,3 FTSTRIPE-3 FT GAP LFT 84.00 LFT $2.00 $168.00 116 LINE,THERMOPLASTIC,BROKEN,WHITE,6 IN,3 ET STRIPE-3 FT GAP LFT LFT $1.00 117 PAVEMENT MESSAGE MARKING,THERMOPLASTIC, FISHHOOK LANE INDICA'T'ION ARROW EA 4.00 EA $80.00 $320.00 118 TRANSVERSE MARKING THERMOPLASTIC CROSSWALK,WHITE 24" LET 300.00 LET $6.00 $1,800.00 119 LINE,THERMOPLASTIC,BROKEN,WHITE,4IN LFT 190.00 LFT $0.60 $114.00 120 LINE,THERMOPLASTIC,SOLID,WIHTE,4IN. LET 1378.60 LFT $0.50 $689.30 121 LINE,THERMOPLASTIC,SOLID,YELLOW,41N LET 864.00 ',FT $0.60 $518.40 122 PAVEMENT MESSAGE MARKING,THERMOPLASTIC, LANE INDICATION ARROW EA 7.00 EA $50.00 $350.00 123 SNOWPLOWABLE RAISED PAVEMENT MARKER EA EA $200,00 124 GENERAL CONDITIONS LS LS $5,000.00 3o16 CITY OF CARMEL CARMEL-ILLINOIS STREET EXTENSION PROJECT NO.10-10 PROGRESS PAY ESTIMATE NO. 08 For work done during the period of: 1011!14 through 10/31/14 41 4 a. ` +a t S 5 r i a( 3 ro(�' , `� 3 € 7I L Z P.A. . ". y `p " "11702 E Item E' `,' i Descn tion s, e"k �4Quantit this t' TotalQuantit E ' Unit�C5" Le TotalPa t_ l Ellotai,Pa 9I .43 € #ol ii a P #� a r € yl t€ k¢x Y !ra: al. e, a ?,9,1 „ y € 6 Eshmate r €t a,--, Pace I4ttns Estimate to Dates"i 125 IMPORTED FILL CYS CYS $6.65 126 GRADING CYS 7800.00 CYS $6.50 $50,700.00 127 ASPHALT SURFACE COURSE TON 99.03 TON $87.63 $8,678.00 128 ASPHALT INTERMEDIATE COURSE TON 298.77 TON $69.60 _ $20,794.39 129 #53 CRUSHED LIMESTONE TON 465.72 TON $20.00 $9,314.40 130 36"RCP STORMWATER PIPE LFT 256.00 LFT $80.00 $20,480.00 131 CONCRETE END SECTION EA 6.00 EA $1,410.00 $8,460.00 132 6 FOOT PRECAST WALL SYSTEM LET 1973.00 LFT $143.00 _ $282,139.00 133 B FOOT PRECAST WALL SYSTEM LFT LFT $197.43 134 SEGMENTAL BLOCK WALL FF 323.26 FF $35.00 $11,314.10 135 IRRIGATION SYSTEM 0.45 LS 0.45 LS $97,500.00 $43,875.00 $43,875.00 136 OVERSIZED COBBLE STONE 11.05 CYS 12.99 CYS $100.00 $1,105.00 $1,299.00 137 LARGE MERAMEC STONE CYS 28.52 CYS $90.00 $2,566.80 138 STONE BARK CYS 22.78 CYS $130.00 $2,961.40 139 RIP RAP CYS 80.33 CYS $61.00 $4,900.13 140 MESIC PRAIRIE MIX AC AC _ $3,820.00 _ 141 LOW STATURE PRAIRE MIX AC AC $3,155.00 142 YARROW SEED AC 0.28 AC $1,960.00 $548.80 143 CREEPING FRED FESCUE SFT SFT $0.10 144 TURF SEED SFT 88240.23 SFT $0.10 $8,824.02 145 GINKGO(MALE) EA 7.00 EA 5400.00 $2,800.00 146 SWAMPWHTCE OAK EA EA $360.00 147 RED OAK EA 14.00 EA $330.00 $4,620.00 148 DOWNYSERVICEHERRY EA 22.00 EA $160.00 $3,520.00 149 KOUSA DOGWOOD EA 7.00 EA $190.00 $1,330.00 150 EASTERN REDBUD EA 20.00 EA $165.00 $3,300.00 151 KWANZAN CHERRY 8.00 EA 8.00 EA $165.00 $1,320.00 $1,320.00 152 WHITE PINE EA EA $185.00 1S3 BLACK CHOKEBERRY EA EA $45.00 154 KARL FOERSTER REED GRASS EA 139.00 EA $23.00 $3,197.00 155 ARTIC FIRE DOGWOOD EA 19.00 EA $37.00 $703.00 156 GREY OWL JUNIPER EA 95.00 EA $37.00 $3,515.00 157 IIAMELIN DWARF FOUNTAIN GRASS EA 130.00 EA $15.00 $1,950.00 158 NINEBARK EA EA $40.00 T 159 DAPPLED WILLOW EA EA $40.00 160 DWARF DELPHINIUM 19.00 EA 957.00 EA $4.20 $79.80 $4,019.40 161 KIM'S KNEE HIGH CONEFLOWER EA 311.00 EA $14.00 $4,354.00 _1.62 JOLYENE NICHOLE DAYLILY EA 251.00 EA $13.60 $3,413.60 1.63 EVERGREEN CANDYTUFT 195.00- EA 746.00 EA $4.20 $819.00 $3,133.20 164 BLACK EYED SUSAN EA 253.00 EA $14.00 $3,542.00 165 TEMPORARY SILT FENCE LET 2298.00 LFT $1.25 $2,872.50 166 EROSION CONTROL BLANKET SFT 10615.98 SFT $0.20 $2,123.20 167 INLET PROTECTION EA 13.00 EA $150.00 _ $1,950.00 168 PEDESTRIAN STOP SIGN EA EA $200.00 169 18 IN THERMOPLASTIC STOP BAR LET LET $6.00 170 WEED BARRIER FABRIC SFT 12920.02 SFT $0.18 $2,325.60 171 DOUBLE SHREDDED HARDWOOD MULCH CYS 87.24 CYS $60.00 $5,234.40 172 STEEL EDGING LFT 1536.10 LFT $5.25 $8,064.53 173 AUSTRIAN PINES(PINES NIGRA) EA EA $230.00 TOTAL $85,599.38 $2,560,734.39 'ALTERNATE BID A Al CONSTRUCTION ENGINEERING 0.50 LS 0.50 LS $10,000.00 $5,000.00 $5,000.00 A2 MOBILIZATION AND DEMOBILIZATION 1.00 LS 1.00 LS $44,400.00 $44,400.00 $44,400.00 A3 CLEARING RIGHT OF WAY 0.40 LS 1.00 LS $7,000.00 $2,800.00 $7,000.00 A4 CURB,CONCRETE,REMOVE 109.50 LFT 109.50 LFT $5.00 $547.50 $547.50 AS CURB AND GUTTER,REMOVE 3650.50 LFT 3650.50 LFT $4.50 $16,427.25 $16,427.25 A6 INLET,REMOVE EA EA $415.00 A7 LIGHT STANDARD AND FOUNDATION,REMOVE 3.00 EA 3.00 EA $300.00 $900.00 $900.00 A7A LIGHT STANDARD,REMOVE EA 4.00 EA $300.00 $1,200.00 A8 PIPE,ABANDON AND GROUT FILL LFT LFT $11.00 A9 EXCAVATION,COMMON 3948.00 CYS 3948.00 CYS $23.00 $90,804.00 $90,804.00 A10 TEMPORARY EROSION&SEDIMENT CONTROL, CURB INLET PROTECTION EA 12.00 EA $85.00 $1,020.00 All TEMPORARY SILT FENCE LFT LFT $1.25 912�NO2 STONE TON TON $17.25 1 �A13,SUBGRADE TREATMENT,TYPE I SYS SYS $6.24 4 of 6 CITY OF CARMEL CARMEL-ILLINOIS STREET EXTENSION PROJECT NO.10-10 PROGRESS PAY ESTIMATE NO. 08 For work done during the period of: 10/1/14 through 10/31/14 �, q,17 x a �a. 1?'.. ! t `1,� ,E 1 ,1`-4.-10, �v ca ' .' - t'"t w"0/ "i �l�in -� Item K`Rz pX 1 ;Description 3 0uartt/tythis# Total Quactity 0,„i' .,U(11t A iL fIM,:3 pay I .ajiPay9 ;No 4 Estimated nr,,to Date`� Priced, this EstimateP tobala ;.Y I. nerdk1 . ISAIir,agg + ,3 ` ttik,. .M 1 1-A4 N. '-1 i 1,o =,. ;z ana, �i$ev m6gilia iii A14 SUBGRADE TREATMENT,TYPE IIIA SYS SYS $12.00 A15 STRUCTURAL BACKFILL,TYPE 1 128.00 CYS 128.00 CYS $23.15 $2,963.20 $2,963.20 A16 CHEMICAL MODIFICATION,SOILS SYS SYS $5.45 A17 COMPACTED AGGREGATE,NO.53,BASE TON TON $20.00 A16 COARSE AGGREGATE,NO 8 TON TON $40.00 A19 MILLING,ASPHALT,11/2 IN SYS SYS $0,90 A20 PROFILOGRAPH,NMA LS LS $1.00 A21 HMA,INTERMEDIATE,TYPE C,OG,19.0 MM TON TON $52.00 A22 HMA SURFACE,TYPE A TON TON $106.00_ A23 HMA SURFACE,TYPE C TON TON $65,00 A24 HMA INTERMEDIATE,TYPE A TON TON $68.00 mm A25 HMA INTERMEDIATE,TYPE C TON TON $52.00 A26 HMA BASE,TYPE C TON TON $49.00 A27 ASPHALT FOR TACK COAT TON TON $1.00 A28 CURB RAMP,CONCRETE,TYPE C SYS SYS $113.00 A29 CURB RAMP,CONCRETE,TYPE K SYS SYS $130.00 A30 CURB AND GUTTER,TYPE II LFT LFT $12.00 A31 CURB AND GUTTER,TYPE III LFT LET $12.00 A32 PCCP FOR APPROACHES,9 IN. SYS SYS _ $52.00 MOBILIZATION AND DEMOBILIZATION FOR A33 SEEDING EA EA $200.00 A34 SEED MIXTURE,T LBS LOS $1.35 A3S MULCHING MATERIAL TON TON $400.00 A36 WATER Kg-a l Kgal $1.00 A37 TOPSOIL CYS CYS $1.00 A38 SODDING,NURSERY SYS SYS $311 A39 PIPE,REINFORCED CONCRETE,CIRCULAR 12 IN 332.00 LFT _ 332.00 LET $33.25 $11,039.00 $11,039.00 _MO PIPE,REINFORCED CONCRETE,CIRCULAR 18 IN 36.50 LFT 36.50 LET $45.00 $1,642.50 $1,642.50 A41 PIPE,REINFORCED CONCRETE,CIRCULAR 21 IN LFT LFT $76.00 A42 PIPE,REINFORCED CONCRETE,CIRCULAR 241N LET LFT $60.00 A43 VIDEO INSPECTIO FOR PIPE LFT LET $2.00 A44 PIPE,TYPE 4 CIRCULAR 6 IN LET LFT $5.20 A4S AGGREGATE FOR UNDERDRAINS CYS CYS $32.00 A46 GEOTEXTILES FOR UNDERORAIN SYS SYS $0.95 A47 CASTING,ADJUST TO GRADE EA EA $665.00 A48 INLET,CAP EA EA $460.00 A49 INLET,110 5.00 EA 5.00 EA $1,600.00 $8,000.00 $8,000.00 A50 INLETMIO 1.00 EA 1.00 EA $1,600.00 $1,600.00 $1,600.00 A51 MANHOLE,C4 1.00 EA 1.00 EA $1,800.00 $1,800.00 _ $1,800.00 A52 MANHOLE,J10 4.00 EA 4.00 EA _ $3,300.00 $13,200.00 $13,200.00 A53 ROAD CLOSURE SIGN ASSEMBLY 8.00 EA 11.00 EA $270.00 $2,160.00 $2,970.00 A54 DETOUR ROUTE MARKER ASSEMBLY EA 15,00 EA $65.00 $975.00 ASS CONSTRUCTION SIGN,A EA 6.00 EA $100.00 $600.00 AS6 MAINTAINING TRAFFIC 1.53 LS 1.53 IS $6,064.97 $9,279.40 $9,279.40 A57 BARRICADE, Il-B 248.00 LET 248.00 I.FT $10.00 $2,480.00 $2,480.00 A58 SIGN POST,SQUARE,TYPE 1,REINFORCED ANCHOR BASE LFT LFT $11.00 A59 SIGN,SHEET,WITH LEGEND 0.080 IN THICKNESS SF SF $14.00 A60 SIGN,SHEET,WITH LEGEND 0.100 IN THICKNESS SF SF $15.00 A61 DECORATIVE STREET LIGHTING,WIRING AND INSTALLATION EA EA $8,300.00 A62 CABLE INTERDUCT LET LFT $9.50 A63 HANDIIOLE,LIGHTING EA EA $600.00 A64 CONDUIT,STEEL,GALVANIZED,2 IN LET LFT $10.50 WIRE,NO 6 COPPER IN PLASTIC DUCT,IN TRENCH, A65 41/3 LFT LFT $7.25 A66 HANDHOLE EA EA $850.00 WIRE,NO 6 COPPER IN PLASTIC DUCT,IN CONDUIT A67 41/3 LFT LET $7.25 A68 TRANSVERSE MARKING THERMOPLASTIC CROSSWALK,WHITE 24" LFT LET $10.00 A69 LINE,THERMOPLASTIC,BROKEN,WHITE,41N LET LFT $1.00 A70 LINE,THERMOPLASTIC,SOLID,WHITE,4IN. LFT LFT $1.00 A71 LINE,THERMOPLASTIC,SOLID,YELLOW,41N LET LFT $1.00 TRANSVERSE MARKING THERMOPLASTIC STOP A72 LINE,24" LET LFT $10.00 PAVEMENT MESSAGE MARKING,THERMOPLASTIC, A73 LANE INDICATION ARROW EA EA $50.00 5 of 6 CITY OF CARMEL CARMEL-ILLINOIS STREET EXTENSION PROJECT NO.10-10 PROGRESS PAY ESTIMATE NO. 08 For work done during the period of: 10/1/14 through 10131114 At,1 4' '1t s 1 tj's..dr„ a E{, w i t rgalna �nr,,,j��f P gt .5 E ` its 'A Item I E E pescnphon Quantity this nsaTotal Quantty g, GSjOUnit 9 rd,-01°.41#.141-,..“3 Total Pay' �x'7"srx.YS m3 6 �No I � � 1' I 1 1 JEstimate a„ $� €o Data a Pricep*s this Est€mate 'L o Date`� fit, frI s 1 to dE. r w 1 ' L',f ,,, , �"4`�� .7a ✓1 �m.�. +�,.a.ea��.�' � "_, ,.gym#�:1°. '"�„ ��N P e r ..� . N11�,�ga i PAVEMENT MESSAGE MARKING,THERMOPLASTIC, A74 WORD,"ONLY" EA EA $100.00 A7S SNOWPLOWABLE RAISED PAVEMENT MARKER EA _ $200.00 A76 SIGNAL SUPPORT FOUNDATION,36 IN X 144 IN EA EA $2,100.00 A77 SIGNAL STRAIN POLE,STEEL,30 FT EA EA $4,500.00 A78 HANDHOLE,SIGNAL EA EA $875.00 A79 CONDUIT,STEEL,GALVANIZED,2 IN, UNDERGROUND LFT LFT $10.50 A80 SIGNAL CABLE,1C/14 GA LFT LFT $0.15 081 CONTROLLER AND CABINET,MASTER,MENU DRIVEN,B PHASE 0.99 EA 0.99 EA $8,665.00 $8,560.15 $8,560.15 TRAFFIC SIGNAL HEAD,3 FACE,12 IN RED,AMBER, A82 GREEN 3.19 EA 3.19 EA $620.00 $1,977.80 $1,977.80 TRAFFIC SIGNAL HEAD,S FACE,12 IN RED, 083 AMBER,GREEN,AMRER ARROW,GREEN ARROW 0.76 EA 0.76 EA $925.00 $700.23 $700.23 A84 SPAN,CATENARY,AND TETHER EA EA $1,700.00 _ A85 DISCONNECT HANGER EA EA $275.00 A86 SIGNAL CABLE,5C/14 GA LET LET $1.50 A87 SIGNAL CABLE,7C/14 GA LFT LET $1.65 A88 SIGNAL CABLE,3C/8 GA LET LFT $2.50 A89 SIGNAL CABLE,2C/16 GA,SHIELDEI7 LFT LET $0.75 A90 SIGNAL DETECTOR HOUSING EA _ EA $850.00 A91 SAW CUT FOR ROADWAY LOOP AND SEALANT LFT LFT $6.00 A92 CONTROLLER CABINET FOUNDATION,I'1 EA EA $1025.00 A93 SIGNAL.SERVICE EA EA $800.00 A94 LOOP DETECTOR DELAY AMPLIFIER,2 CHANNEL EA EA $250.00 MISCELLANEOUS EQUIPMENT FOR TRAFFIC 095 SIGNALS LS LS $500.00 TOTAL ALTERNATE BID A $226,281.03 $235,086.03 ALTERNATE BID B B1 CONSTRUCTION ENGINEERING LS _ LS $4,400.00 B2 MOBILIZATION AND DEMOBILIZATION LS LS $12,643.00 83 CLEARING RIGHT OF WAY LS LS $5,000.00 B4 EXCAVATION,COMMON CYS CYS $13.00 B5 TEMPORARY SILT FENCE LFT LET $1.25 B6 SUBGRADE TREATMENT,TYPE IDA SYS SYS $6.10 87 STRUCTURAL BACKFILL,TYPE 2 CYS CYS $27.15 B8 STRUCTURAL BACKFILL,TYPE 3 CYS s CYS $21.15 89 HMA SURFACE,TYPE B TON TON $110.00 E110 LIMA INTERMEDIATE,TYPE 8 TON _ TON $45.00 B11 ASPHALT FOR TACK COAT TON TON $480.00 B12 GUARDRAIL END TREATMENT,I EA EA $1,200.00 B13 GUARDRAIL,WHAM,6 FT 3 IN SPACING LFT LET $30.00 B14 HANDRAIL,PEDESTRIAN LFT LET $145.00 B15 PCCPFOItAPPROACIIES,9IN SYS SYS $51.35 B16 MOBILIZATION AND DEMOBILIZATION FOR EA EA SEEDING $200.00 817 EROSION CONTROL BLANKET SYS SYS $1.17 BIB GEOTEXTILES SYS SYS $3.39 B19 RIPRAP,REVET'MEN'T TON _ TON $35.00 B20 SEED MIXTURE,T LBS LBS $1.35 B21 MULCHING MATERIAL TON TON $400.00 1322 WATER kGAL kGAL $1.00 B23 TOPSOIL CYS_ CYS $1.00 B24 SODDING,NURSERY SYS SYS $3.27 B25 PUMP-AROUND EA EA $4,000.00 626 STR.,REINFORCED CONCRETE 3-SIDED,288 IN X 96 LFT LFT IN $2,490.00 TOTAL ALTERNATE BID B CHANGE ORDERS ITEMS COl 410.10 IRRIGATION REPAIR _ LS 1.00 LS $6,296.00 $6,296.00 ' CO2 STREET DEPT IRRIGATION AT SPLITTERS LS 1.00 LS $10,105.20 $10,105.20 CO3 1B"RCP End Section EA EA $1,078.61 CO4 24"RCP End Section EA 1.00 EA $1,162.61 $1,162.61 COO 36"RCP End Section EA 1.00 EA $1,610.61 $1,610.61 C06 54"RCP End Section EA 1.00 BA s $2,562.61 $2,562.61 C07 60"RCP End Section EA EA $3,346.61 6of6 CITY OF CARMEL CARMEL-ILLINOIS STREET EXTENSION PROJECT NO.10-10 PROGRESS PAY ESTIMATE NO. 08 For work done during the period of: 1011114 through 10131114 R p a € fi. wc nYx i A 4 i- 54,,," ;Y^ '...5 A r w r� W P i 3 " m 14 r 1 p4.6# 1:" sA ti;Quin[y ts vt T'taiRt antfy �Ucnd0 IP1T eP a oT1 e oay - *gll 5 * w 4* 0 ` ` ` Et 0.4 topeti), N, x, i$r ` tte6tlrta e;,, a64e t a� a ^� x Ns sx; .$ r"a� *t3u ;, &!. a e a �,�� 2 ,aw � . £" rmt � 4+' •': . CO8 STREET LIGHT FOUNDATIONS EA EA $1,289.S0 C09 NORWAY SPRUCE EA EA $709,50 CO10 6'.Precast Wall column Stain Change LS IS _ $12,190.43 C011 Unforeseen Utility Adjustments LS LS $3,398;00 C012 Unforeseen Structure/Plan Adjustments LS LS $2,248.00 C013 Japanese Zelkova,2,5" EA EA $365.00 C014)apanese Tree Lilac,LS" EA EA _ $190.00 C015 Ruby Red Hersechestnut,1.5' EA 17.00 EA $230.00 $3,910.00 C016 Norway Spruce,6' EA EA $215.00 0017 Plant Trans per Upslated Details EA ,, EA $30.00 1 $25,647.03 • TOTAL BASE,ALTERNATE A,ALTERNATE B AND ANY ADDITIONAL ITEMS' I $311,880.41 I.$2,821,467.46 TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $311,880.41 TOTAL PAY TO DATE $2,821,467.46 DEDUCT 10% RETAINAGE $282,146.75 DEDUCT PREVIOUS NET PAY ESTIMATES $2,258,628.34 l „ NET PAY ESTIMATE NO. 08 $280,692.37 II CrossRoad Engineers, PC /...-... ./L.------- i iii/ / /1- Inspecting Film By ate 11 E&B Paving, Inc. A 2 - --�L1—t. /I —/7— (�} Contractor / Date i