Loading...
Clark Dietz, Inc/Eng/Adl Serv #1A/58,000/26th Street Path from Keystone Parkway to Hazel Dell Parkway – Additional DesignClark Dietz, Ind. Engineering Department- 2017 Appropriation # 2016.CUT Bond Fund P.O. #33928 Contract Not:Td Exceed $58,000M AbbltbNAL:StkV -ES AMENDMENT -TO �AGRtEMENT.,FOR"PROFtggIO14AL.,'-$tAVICt3 THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement) entered into by and between the City of Carmel and Clark Dietz,'Inc. (the "Professionall, as City Contract dated. May. 4, 2016 shall amend the terms -of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein 68 ,Exhibit °A"_ The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the,parlies hereto have -made and executed this Amendment as follows" CITY OF CARMEL, INDIANA Clark Dietz, Inc, by and through its Board of Public Works and Safety 2 IRK M109— Date* ...... Printed Name M4 Ann dike bdr Date: VI -r -C Jo.- t S 0-40JJ Title L04 S. W tson 6 b6r** FlDfrIk,_._ 17-7 Date::.._ Last Four of,SSN if Sole Proprietor: A. T - 'Date: Christine ftulelb 96rk.Tyeas prer Date: Mft ASA PIA dW.J1J?1Z0172:.S7PMI 0 7 - Clark>Dietz Engineering Quality of Life March 14, 2017 PROJECT DESCRIPTION: Design of Pedestrian Bridge over Cool Creek in Carmel SCOPE: The proposed pedestrian bridge will cross over Cool Creek, approximately 0.36 miles west of Gray Road. It is part of a proposed multi -use path along the north side of 1261 Street from Keystone Parkway to Hazel Dell Parkway. The proposed pedestrian bridge will replace the existing bridge currently in place. The existing bridge has a substandard width. The proposed structure is anticipated to be a 10 ft. wide pre -cast single span truss bridge with a concrete deck. The truss would be functional and provide the required safety railing for pedestrians. Our scope will include the following services. For completion of this work, the supplemental fee to the original contract will be a lump sum amount of $58,000: 1. Hydraulic Analysis. 2. Preparation of Bridge Plans and Details. 3. Quantities and Cost Estimate for Bridge. °EXHIBIT ° Clark Dietz, Inc. 8900 Keystone Crossing, Suite 900 Indianapolis, Indiana 46240 T: 317.844.8900 F: 317.844.9158 126th Street MU Path CaarldDietz City of Carmel, Hamilton County, IN INDOT Des. No. 1401703 Transportation Alternatives Program (TAP) Project Fee Summary 3/14/2017 Trail Design Items Task- Description Fee Sub -Consultant Payment Method Field.Survey $ 44,730.00 USI Lump Sum Abbreviated Engineers Assessment $ 4,980.00 Lump Sum Trail Design (PFC Plans, Stage 3 Plans, Final Tracings) $ 146,140.00 Lump Sum Bridge Feasibility Study $ 11,500.00 Lump Sum Pedestrian Bridge Design __ ::s"x , F$5$TO_00?00 ] - Lut m 7Sum Utility Coordination $ 29,300.00 Hourly Rate ' Coordination with Roundabout Design at 126th Street & Gray Road $ 7,200.00 Hourly Rate Retaining Wall Design (2 Locations) $ 10,300.00 Lump Sum Geotechnical Investigation $ 20,280.00 Earth Exploration Unit Cost *Environmental Document Preparation (CE) $ 10,960.00 Green 3 Lump Sum *Section 106 Documentation $ 5,001.00 Green 3 Lump Sum *Waters of the US Report $ 5,500.00 Green 3 Lump Sum 401/404.& IDNR Permit Preparation $ 13,800.00 Lump Sum Rule 5 Permit Preparation Is Lump Sum 372,891.00 * Indicates professional service provided by DBE sub -consultant Note 1. The scope of work for utility coordination assumes that no utilities will qualify for reimbursement and no utility agreements will be required. Note 2. Neither RW Engineering or RW Services are included in this Fee Proposal. .Note:3 xaBndgc+Design Feewill9be deterinined�after;�Bndge:Feasibility°Studyau completed _ - "�` • _ Note 4. The Geoteelmical.Investigation.assumes that -the -existing bridge.will be modified._If if.is determined that a - new -bridge -will _____ be built over Cool Creek, the Geotechnical Investigation fee will require adjustment. Note 5. If Roundabout at 126th & Gray Road is constructed prior to the trail, some additional field survey may be required to get updated topography information at the roundabout location. 'EXHIBIT 'A z�i Br Design I of 2 Clark>iez 126th Street MU Path in Carmel, iN -Des. No. 1401703 Pedestrian Bridge Design Man -Hours 3/7/2017 CATEGORIES OF WORK Project Manager Project Engineer Engineer III Engineer II CADD Tech III HYDRAULICS SUBMITTAL.- IDNR PERMIT REQ'D." Obtain GIS Information Calculate Drainage Areas Calculate Q10 and Q100 Plot Cross Sections for Hydraulic Model Hydraulic Analysis using Q10 Hydraulic Analysis using Q100 IDNR Permit application (In -Kind Replacement) 2 8 2 Preliminary Layout Sheet 1 2 8 16 Existing bridge waterway opening 2 Hydraulic Report and Recommendation 1 4 8 Hydraulic Submittal to INDOT 1 4 8 PRELIMINARY FIELD CHECK (PFC) PLANS SS&T Calculations 1 8 16 Proposed Bridge Lengths Update Preliminary Layout Sheet 2 4 8 Economic Analysis - Bridge Alternatives (Feas. Stdy) Prepare General Plan Sheet 6 8 16 Preliminary Quantities & Cost Estimate 1 4 8 Preliminary Field Check Meeting 1 8 8 Quality Control Check-& Revisions - - - - - -- - 4 ----- - - - - ------8 -- -- 1-2 --- - - — (90%) PLANS --STAGE 3 Revisions to Bridge Plans from PFC 2 4 6 Prepare Structure Boring Sheets 1 2 6 Finalize Layout Sheet 2 2 4 Finalize General Plan Sheet 2 4 8 Superstructure Design (by Truss Fabricator) Superstructure Details (by Truss Fabricator) End Bent Design 1 12 24 End Bent Details 1 4 12 32 Misc. Details Sheet (Railing, App. Slab, etc.) 4 8 20 Bridge Summary Sheet 2 4 8 Update Bridge Quantities 2 4 Update Cost Estimate 1 2 Special Provisions 1 4 12 Stage 3 Submittal to INDOT 2 4 12 Foundation Review Submittal 1 2 6 Quality Control Check & Revisions 1 81 81 1 1 12 FINAL PLANS Revisions to Bridge Plans from Stage 3 2 4 6 Finalize Bridge Quantities 1 2 Finalize Cost Estimate 1 2 Finalize Special Provisions 1 2 2 Create Final Tracings (Electronic) 2 Stamp & Seal Tracings (Electronic) 1 1 1 2 Electronic File Submission 41 1 CONSTRUCTION PHASE Review & Approve CIB 1 4 6 Shop Drawing Review 2 4 Pre -Construction Meeting 1 1 Consultation during construction 4 4 "EXHIBIT GI BrK UIeIZ, inc. 30 LUl /U6U 1 VWDr UE~7 gI7.Xl9( Br Design 20f 2 Clark>ietz 126th Street MU Path in Carmel, IN --Des. No. 1401703 Pedestrian Bridge Design Man -Hours 3M2017 CATEGORIES OF WORK Project Manager Project Engineer Engineer III Engineer H CADD Tech III TOTAL HOURS 38 101 88 112 166 Average Hourly Rate (2017) $ 55.35 $ 44.53 $ 40.58 $ 30.35 $ 31.60 Payroll Cost $ 2,103.30 $ 4,497.53 $ 3,571.04 $ 3,399.20 $ 59245.60 $ 18,816.67 Overhead (1.8094) $ 34,046.88 Total Labor Cost (Payroll + Overhead) $ 52,863.55 Fixed Fee (9.5"/") $ 5,022.04 Direct Expenses $ 100.00 Mileage $ 0.40 'mile 0 $ Per Diem for Meals $ 26.00 day 0 $ - Lodging $ 70.00 night 0 $ - Prints $ 10.00 plan set 5 $ 50.00 Misc. Expenses (photocopies, supplies, etc.) $ 50.00 lump sum 1 $ 50.00 Total Direct Expenses = $ 100.00 7985.59TOTALFEE $ 5 USE $ 58,000.00 "EXHIBIT Gark Diez, Inc. 20170301 Pod Br Dedgn.xIsx o. f Carmel City INDIANA RETAIL TAX EXEMPT CERTIFICATE NO. 003120155 002 0 Page 1 of 1 PURCHASE ORDER NUMBER FEDERAL EXCISE TAX EXEMPT 33928 ONE CIVIC SQUARE 35-6000972 THIS NUMBER MUST APPEAR ON INVOICES, AIP CARMEL, INDIANA 46032-2584 VOUCHER, DELIVERY MEMO, PACKING SUPS, FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL -1997 SHIPPING LABELS AND ANY CORRESPONDENCE PURCHASE ORDER DATE DATEREQUIRED:1 REQUISITION NO. VENDOR NO. DESCRIPTION 5/24/2016 a p 060650 Project 15-17; Contract Date 05.04.16 CLARK DIETZ, INC City Engineering's_ Office VENDOR. 8900 KEYSTONE CROSSING #900 SHIP 1 Civic Square - - TO Carmel, IN 46032 - INDIANAPOLIS, IN 46240 - Kate Lustig PURCHASEID BLANKET CONTRACT PAYMENTTERMS FREIGHT 5145 QUANTITY UNIT OF MEASURE. DESCRIPTION UNIT PRICE EXTENSION Department.' 2200 Fund: 0 COIT Bond Fund Account: 94-650.04 1 Each ASA 1 -126th Street Multi -Use Path from Keystone Parkway $314,891.00 to Hazel Dell Parkway - Design Sub Total In C�-eaac_ 2016 COIT Bond PLEASE INVOICE IN DUPLICATE $314,891.00 $314,891.00 DEPARTMENT I ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT PAYMENT $314,891.00 SHIPPING INSTRUCTIONS ' AIP VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. 'NUMBER IS MADE A 'SHIP PREPAID. PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN, AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBUGATED BALANCE IN 'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER 'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945 AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY Jeremy Kashman Steve Engelking TITLE Director Administration CONTROL NO. 33928 CLERK -TREASURER ,P t a p gg Send Invoice To: - - 4- ---s Skip Tennancour American Structurepoint, Inc. 8425 Wicklow Way Brownsburg, IN 46112 2016 COIT Bond PLEASE INVOICE IN DUPLICATE $314,891.00 $314,891.00 DEPARTMENT I ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT PAYMENT $314,891.00 SHIPPING INSTRUCTIONS ' AIP VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. 'NUMBER IS MADE A 'SHIP PREPAID. PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN, AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBUGATED BALANCE IN 'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER 'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945 AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY Jeremy Kashman Steve Engelking TITLE Director Administration CONTROL NO. 33928 CLERK -TREASURER