Loading...
Hamilton County Drainage Board/Eng/36,167/50/Cost Sharing Agreement for Reconstruction of Detention Pond in Windemere SubdivisionCOST SHARING AGREEMENT. FOR RECONSTRUCTION gg � OF DETENTION POND IN WINDEMERE SUBDIVISION o� 'This Agreement entered into by and between the Hamilton County Drainage Board :('`the Drainage Board").and the City of Cartmel, acting by its Board of Public Works and-Safoty ("the City'') on the dates set out herein. WHEREAS,, the Windemere Subdivision is served by -a detention pond ("the Pond.'),, and the Pond discharges into the Williams Creek regulated drain, which is controlled and maintained by the Drainage Board; and, WHEREAS, the Windermere Subdivision is within the City; and, WHEREAS, the Drainage Board and the City are desirous -of entering: -into an Agreement to _split the construct'iori cost:of a Project which will:, a) lower the discharge;pipe from. the Pond by six'(6') nclies;.to permit the Pond to retain more excess storm water in a significant rain event; and b) to seed and provide erosioncontrol for: the portion ofthe bank of the pond which "becomes exposed because of lowering the water table in the pond ("the -Pr Pi c and; WHEREAS,, the Project will be divided into two parts which are: a) to: construct anew discharge,pipe acid other improvements Tr'.om.the Pond, .which will,perrnit:the Pond to retain more excess storm wateTin a;significant rain event ("the Drainage- Board Project") and_b) to seed, grade and provide erosion. control for the portion .of the batik= of the, -Pond which becomes exposed because of lowering the water table in the Pond ("the City Project" );: and,. 'WHEREAS, the parties are desirous of ontering into, an Agreement to construct the Project -and to divide the cost -associated with the Project. IT IS THEREBY AGREED as follows: 1. The Hamilton County Surveyor's Office, on behalf of the Drainage Board, shall complete the design of.the Project,. competitively bid the Project, and manage the Project. 2. The preliminary engineer's estimate of the cost of the Project is attached.as.Exhbit A, which estimates the cost. of the Drainage Board Project to Eighty Thousand Six Hundred Sixty-six. Dollars and Seventy-five Cents ($80,666.75).:and the cost :of the City Project to be Thirty-six Thousand One Hundred Sixty-seven Dollars and Fifty Cents ($36,167:50): 3. The bid specifications for the Project shall divide the cost of the Drainage Board Project and the City Project as set:out on Exhibit A, and the parties: agree to pay the cost associated with their portion of the Project. 4. Within' forty-five (45) days.of'bid, the City shall payto'the Drainage Board,, the cost of the City Project as :defined in the bid. 5. The Drainage Boaid'shall pay its cost of the Project from the Williams Creek Maintenance Fund, 6. It is agreed. between the parties that the Drainage Board shall complete ;the plans for the Project.and cause it to be bid on or before the 24(h day, of July, 2017, with the anticipated completion.date.;of the Project being on the,31"day of.Decen1 er;'2017. ALL OF WHICH IS AGREED by -the Drainage Board and the City: on the dates set. out herein. APPROVED by the Hamilton County Drainage Board this, day of 2017. HAMILTON COUNTY DRAINAGE BOARD Mark E. Heirbrandt Christine Altman I Steven C. Dillinger ATTEST: Lynette Mosbau , Secretaryi ,gh APPROVED by the Board of Public Works and Safety'of the City of Carmel this day%of. i 2017.. BOARDOF PUBLIC' WORKS AND SAFETY OF THE CITY OF CARMEL Wyor JamesBrai.nard Lori0n f, w Loris S (&f' Mary 'Ara/iurke 'ESo IMATED 0006TROGTIQ14 COST OPINION tar Windarnere Rifcohstruction izacoramanoad Solu . ttory Ham Mon r-*uqty. Indiana .5.11 Moll 6 By: dLii Iteml Description Quantity Unit Unit AM40L.Int No. priCcr 1 3 x V Bor,W Trash Rick a Ruwk—sc—ci 1 EA s 10.ou $6.=M 2 Z X Z Box NI Casting 1 EA 5 2jM00 szmco 3 Z)t2.5* Box.vd Casting 1: EA s 2,750:00 W730.00 4 18" RCP outSide,!5� LFT s 10DIC0 00 5 1F04 LIFT. .$ 95100, S9;SB0.00 6 17` RCP ouWde'20 LFT s 75, O0: $2250,(40 T_ 117',Rr-P %ithln,U. 72 LFT S 85.00 $1.020-po �a : 39, Steel Cavng)-if blcc*s & grout is LFT is 75D.CG -s-4—.5n-0-Q0 9 Endsettons. 1 EA s 1,750.00 Z1.750.00 10. AUXPary Spillmy, ke-- I Lis 55,=4Y0 —11 MGDECB 1 SYC 5 7S.G3 1.675 .(30 —72— 70 T 14 isawcut &. reimve 129.0f '9,40MIX 1 5 LLFT :�Rem(��el�"RCP 5 t5_CO 5120.t}0 1B '00 17 ISeeding & MWDh- 1ILS 1-5 12,500.:0(1, 512,530.00 Total f LS—701 Contingencies .1,5%: N.Gt Total Ls Winocirtere Reconstruction Pamd Veatment Alternative I . 4ar'lliton county, India" Item Desdriptic.n Quantity Unit Unit AMOurit No. I I .. I I Pride I 1 S15USN ECS 885 SYD s 10.ou M850.00 2 ly. Riptap 13 Tons s 20.00 S2=0.00 3 PondB.ankGfadjhg I LS' S. 10,COD.w $MMWO .mg 4 Soed Ls w 00 Total S31,450.00 15010 $4.717.50: q0t Total 5 36,1€37,51+ Joseph L. Miller, P.E.:CFM AN0j1'C1Eng1nddr' P40ipg Engino6iffig PC ,853 Columbia Rd, Sub 101 [Plainfield, IN 461681 Oh: (31 Z) 707m373.61 Fax:, (317) 707-3636 lmiller0banninq-enmcorn I Ban6ingEngineering.corn NINO- Over 20 Yeats of Making Y66r Project Our Pdbrif.y