Loading...
United Consulting Engineers, Inc/DOCS/8,500/ Adl Serv/Survey for Design and LandscapeUnited Consulting Engineers, Inc, Department Of Commtmity Services - 2017 Appropriation #12016 COLT Bond Fun: P.O. #100372 Contract Not To Exceed $8,500,00 JAS ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement') entered into by and between the City of Carmel and United Consulting Engineers, Inc. (the "Professional'), as City Contract dated June 1, 2016 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect, IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA by and through its Board of Public Works and Safety By: Ames Brainard, eresi inSOfficer nate- .f r,'1611 Date: 0v'-1-4NA%—A(i..f. A...YM■'s"If TAW.l(', l"I AfA HA. 412WA11 I Wit %.%II United Consulting Engineers, Inc. m= � / lP14 DAT ZMEF... IMICMVL. Robes Printed Name farts ✓Q Title FID/TIN: 36—no-6415 Last Four of SSN if Sole Proprietor: Date: tdl Z.. zo>�- vUNITED ENGINEERING Im April 18, 2017 ENVIRONMENTAL INSPECTIONMr. Michael Hollibaugh Director of Community Services LAND SURVEYING City of Carmel, Indiana LAND ACQUISITION One Civic Square, Third Floor PLANNING Carmel, IN 46032 WATER & WASTEWATER RE: City Center Drive SINCE 1965 Survey Fee Proposal Dear Mr. Hollibaugh: OFFICERS Dave Wfthter,illiam EPE,PHzfl,PE We appreciate the opportunity to provide a proposal for the survey services required for Steven IN. Jones the design of the landscape wall along the southeast side of City Center Drive in Carmel, Christopher R Pope, PE Indiana. United Consulting staff members will perform a topographic survey of the site B. Keith Bryant, PE shown on the attached exhibit under the direction of a licensed surveyor. The survey will MichaelRovre,PE be In accordance with the "Survey— Scope of Services" enclosed. The topographic survey will be performed for a lump sum fee of $8,500 and all electronic PROFESSIONAL STAFF Andrew i. Wdka PE files will be delivered within 10 days of a notice to proceed. � DevinLStettler,AICP If you have any questions or comments, please contact our office at your convenience. Darryl R Wrainger, PE • Adam C. Post. PE Michael S.Uphant.AtCP Sincerely, E.RachegePemberton, PE UNITED CONSULTING Timothy J. Coomes, PLS Jon E.y, PE Steven R.. Passey, PE Briar J. Person, PE Christopher L.Hanvivnd,PE Michael Rowe, PE Paul 0.Gotzbach,PE Tim Coomes, PLS Brian S. Frederick, PE Vice President Survey Manager Jay N. Killen, PE Christopher J. Dyer, PE enclosures Matthew R Lee, PE MPam RCurtis, PE ° c: File (Pending) Jerorrr/A. R:chadson, PE ° Heather E. Ktl. our, PE Adan J. Greulich, PLS Whitnay D. Neukan. PE Caleb C. Ross, PE o PAaHhcrvA. Ta/a, PE Dam C. Barret PE Scott G. NnndL PE • John R Stocks, PE Jim R Lesh. PE Ncholas J. Kocher, PE Jennifer L. Hart. PE Jeffrey R Andrews. PE e Kelton S. Cunningham. PE Jonathan M. Kort PE Braun S. Rodgers, PE Jordan C. Baker. PE ° Chris J. AndrzejewsM, PE •DCHrBrr Greg J. Broz. PE f........... SUR VEY—SCOPE OF SERVICES GENERAL REQUIREMENTS: The survey shall be collected in ENGLISH FORMAT and shall contain the following minimum information: Original survey field book containing the following minimum information: a. Index. b. General site information. c. Complete listing of utilities, including addresses, with facilities in the area. d. Horizontal control points with references. e. _Level datum notes with vertical temporary benchmarks. f. Storm and sanitary structure details. 2. Electronic data and drawing files suitable for use on a WINDOWS based computer system using the most current version of Autocad including the following: a. Points file of entire survey with hard copy output. i. (single spaced, ASCII format, with data separated by spaces) ii. point number iii. northing iv. easting v.. elevation vi. description b. A point description index/library shall be provided and a current copy maintained on file with UNITED. c. Topographic drawing file including: i. (2-D drawing, Autocad format) ii. property lines, existing right-of-way, easements and property owners' names. iii. Above ground utilities and buried utilities marked by Indian Underground Plant Protection Services. iv. topography shown with appropriate symbolic representation. d. Break -line drawing file indicating slope change information. i. (3D T.I.N. in XML format) ii. Contours at 1 foot intervals PROJECT LIMITS AND COVERAGE OF SURVEY: 1. City Center Drive: Beginning at Clark Street and extending 775 feet northeast to Carmel Garden. The coverage width shall from the southeast curb of City Center Drive to 10 feet beyond the existing fence. 2. Clark Street: Beginning at City Center Drive and extending 325 feet southeast. The coverage width shall be from the northeast curb of Clark Street to 10 feet beyond the existing fence., 3. Sufficient information will be gathered by use of a data collector to provide complete topography and equivalent cross-sections at 50 foot intervals along all referenced alignments. "EXH B A 9 3c-�3