Clark Dietz, Inc/Eng/ Adl Serv #3A/16,200/Small Structure Replacement under Jumper LaneClark Dietz, Inc. Engineering Department -.2017 e Appropriation # 2016 Storm Water Bond Fund; P.O. #33994 Contract Not To Exceed $16,200.00 ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR: PROFESSIONAL SERVICES THIS. AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES (''Agreement") entered into by and between the City of Carmel and Clark Dietz, Inc. (the "Professional'), as City Contract dated May 4, 2016 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit W. The -terms and conditions of the Agreement shall not otherwise be affected by this. Additional Services Amendment and shall remain in .full. force and effect. IN WITNESS WHEREOF, -the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA Clark Dietz, Inc. by and through its Board of Public Works and Safety By: By: aures Brainard, Presiding Officer A to ho>ized Signature Date: Ahs V leo., Printed Name Mary An _ urke, Member Date: S.-/7-/ 7 Sr. yl, le VAn Title Lori S. Watson, mber Date: � / i °9 ► 2-1 J&Xcana.Tmt.%z& Ckv6S.,*.giwr i V017Y:1.k Vr. ASA 134"'WS171 kl Pall FIDITIN: 37-1 oZ 1.00 S/ Last Four of SSN if Sole Proprietor: Date: OS�o9�a:o17 ` Fee Summary 5/3/2017 UNT Williams Creek Structure Replacement 106th St. & Jumper Lane City of Carmel Oark>Dietz m 5/3/20/7 FEE SUMMARY TO FINALIZE DESIGN & R/W ENGINEERING Jumper Lane Culvert Fee Estimate to Finalize Fee Remaining in Net Fee Increase Design & RW Original Contract Task Description Engineering (Column A) (Column B) (Column A -Column B) Design (Small Structure Replacement) (LSUM) 1 $20,460 1 $12,860 $i,buu Utility Coordination (NOT TO EXCEED) 1 $8,785 1 $5,785 $3,000 R/W Eneineerine - Leaal Description & Parcel Plat ($3,233 / parcel) 1 $12,900 1 $9,700 $3,200 Assumptions 1) Anticipated 4 parcels for land acquisition. 2) Jumper Lane anticipated for construction in late 2017/early 2018. 3) Remainder of initial unbilled fee for Design, Utility Coordination, and R/W Engineering from original Contract is still available. 4) Right of Way Acquisition to be completed by the City of Carmel. Summary of Work Remaining The project was put on hold after the Preliminary Field Check meeting. With the project now active, the following work items will require completion: 1) Restart project, update files, schedule, etc. 2) Utility Coordination restart, since project has been idle. 3) Revise Plans per Preliminary Field Check meeting. 4) Finalize Title Sheet, Typical Cross Section Sheet, and Maintenance of Trat)ic. 5) Finalize structure layout and details. 6) Finalize Summary Tables. 7) Finalize Cross Sections. 8) Finalize Quantity Calculations, including earthwork and removal quantities. 9) Finalize Cost Estimate. 10) Parcel Plats and Legal Descriptions for 4 Parcels. 11) RW Staking. 12) Prepare Project Manual and Contract Documents. 13) Upload Plans and Project Manual for Public Bidding. 14) Schedule and administer Pre -Construction Meeting. City ®f Carmel INDIANA RETAIL TAX EXEMPT CERTIFICATE NO. 003120155 002 0 Page 1 of 1 PURCHASE ORDER NUMBER FEDERAL EXCISE TAX EXEMPT 33994 ONE CIVIC SQUARE 35-6000972 THIS NUMBER MUST APPEAR ON INVOICES, AIP CARMEL, INDIANA 46032-2584 THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. VOUCHER, DELIVERY MEMO, PACKING SLIPS, SHIPPING LABELS AND ANY CORRESPONDENCE FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997 PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION 6/6/2016 060650 Project 16 -SW -79; Contract Date 05.04.16 CLARK DIETZ, INC City Engineering's Office VENDOR 8900 KEYSTONE CROSSING #900 SHIP 1 Civic Square TO Carmel, IN 46032 - INDIANAPOLIS, IN 46240 - Kate Lustig PURCHASEID BLANKET CONTRACT PAYMENTTERMS FREIGHT 5379 QUANTITY UNIT OF MEASURE DESCRIPTION UNIT PRICE EXTENSION Department: 2200 Fund. 0 2016 Storm Water Bond Account: 94-650.04 1 Each ASA 3 - Small Structure Replacement under Jumper Lane $97,847.00 $97,847.00 0.15 Miles South of 106th Street Sub Total $97,847.00 Send Invoice To: Jill Newport CrossRoad Engineers, P.C. 3417 Sherman Drive Beech Grove, IN 46107 G.O./Storm Water Bonds PLEASE INVOICE IN DUPLICATE I n Cre0AQ L b H -1 I t. , 200 !2- New 1dtCA 0 I1,y )OL{--+'= DEPARTMENT ACCOUNT I PROJECT PROJECT ACCOUNT AMOUNT PAYMENT $97,847.00 ' A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A SHIPPING INSTRUCTIONS PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN 'SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN 'C 0 D SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. 'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945 AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY Jeremy Kashman Steve Engelking TITLE Director Administration CONTROL No. 33994 CLERK -TREASURER