Loading...
CHA Consulting, Inc/Eng/Adl Serv #6/57,900/96th Street Corridor Additional DesignCHA Consulting, hic.QRO(,� Engineering Department - 2017 Appropriation # 2016 COIT Bond Fund; P.O. #100965 Contract Not To Exceed $57,900.00 ✓RO ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement") entered into by and between the City of Carmel and CHA Consulting, Inc. (the "Professional"), as City Contract dated February 17, 2016 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA by and through its Board of Public Works and Safety By: James Brainard, Presiding Officer A T• hristine Pauley, rk-Treasurer Date: IS 1Cmm oTr,f.S— C r -da C -.h* Inc ASA MGdrc. I UZY2017 11 4t M11 CHA Consulting, Inc. By: Authorized Signature IylOu'1/tCiS � KLit tS Printed Name Title FID/TIN: 0G6�asg Last Four of SSN if Sole Proprietor: Date: t t j Z h I Scope: EXHIBIT "A" The Professional shall provide the following additional services during Calendar Year 2017 and 2018: 1. Additional Sidewalk Design: Additional roadway design is required to add a sidewalk along the south side of 96`h Street from Priority Way to River Ridge Drive (Gray Road). The sidewalk is a request from the City of Indianapolis received on 8/29/2017. Our lump sum design fee for this work is $21,700. UPDATE (11/8/17): After discussions with Carmel on 11/1/17, it was agreed upon that the requested lump sum fee is acceptable. This includes the following updates that will include a quality review prior to issuance as a construction change: • Typical Cross Sections • Plan & Profile • Ramp Details (29 ramps) • Drainage Design • Quantities and Cost Estimate 2. Additional Bidding and Construction Services: Additional construction services are anticipated in order to address additional Contractor RFI's; additional construction services are required for the review additional Shop Drawings; and additional construction changes are required to supplement the original Base Agreement. Our estimated hourly fee for this additional work is $57,500. UPDATE (11/8/17): After discussions with Carmel on 11/1/17, it was agreed upon that the requested hourly fee be reduced. The number of anticipated RFI's have been reduced and the number of anticipated construction changes have been reduced accordingly. This results in a revised requested total of $41,000. UPDATE (11/20/17): After discussions with Carmel on 11/20/17, it was agreed upon that the requested hourly fee be reduced to $30,000. This includes the following additional services: • Additional Shop Drawing Review: We have received 15 shop drawing submittals to review between 7/20/17 to 10/6/17. We have received an additional 18 shop drawings between 10/6/17 to 11/8/17 for a total of 33 shop drawings to date. This equates to an average overall review rate of approximately 10 submittals per month. We estimate another 2 months of shop drawing review. Assuming a consistent average review rate of 10 submittals per month results in 20 additional shop drawing submittals. The combined total shop drawing reviews (33 performed to date plus 20 additional) is 53 submittals. To keep the total requested amount down, we are requesting a total based on 40 submittals. ■ Total Effort (Update) = 53 submittal reviews @ 10 hrs/each = 530 hr ■ Total Effort (Request) = 40 submittal reviews @ 10 hrs/each = 400 hr ■ Total Effort (Updated Request) = 296 hr ■ Base Agreement = 96 hours -jeL- V3 ■ Additional Effort = 296 hours — 96 hours = 200 hours • Additional Responses to Construction RFI's: We have received 10 RFI's during the first 3 months. With 12 months of construction remaining, we anticipate 40 additional RFI's will require our involvement. Therefore, the total number of RFI's is 50. ■ Total Effort = 50 RFI's @ 4 hours/RFI = 200 hours ■ Base Agreement = 160 hours ■ Additional Effort = 200 hours —160 hours = 40 hours • Additional Construction Changes, if required: Based upon past experience we are assuming that 1 construction change will be required for every 10 RFI's submitted. We originally anticipated 4 construction changes based on 40 RFI's (1 change per 10 RFI's). At that time we estimated each construction change at 36 hours. Based upon the additional RFI's accounted for above, we are assuming an additional 1 construction change to address the total of 50 RFI's. ■ Total Effort = 5 @ 36 hours/each = 180 hours ■ Base Agreement = 144 hours ■ Additional Effort = 180 hours —144 hours = 36 hours 3. Construction Inspection Escalation: Construction inspection of the 96th Street roundabouts at Delegates Row, Gray Rd., and Hazel Dell Pkwy. has been moved from the 2017 construction season to the 2018 construction season We are requesting an escalation increase at a rate of 3% for the one year applied to our agreed upon hourly rates. Our escalation calculation is simplified for the purposes of this estimate to be $359,300 times 3% for one year, which results in an escalation calculation cost of $10,800. UPDATE (11/8/17): After discussions with Carmel on 11/1/2017, it was agreed upon that escalation has been eliminated, and inspection is capped at the original contract value and the request has been reduced to $0. 4. Additional Wall Design: Additional roadway design is required to add a retaining wall in the northwest corner of 96th Street and Hazel Dell Parkway. The retaining wall is a request from Martin Marietta sent to the City of Carmel on 9/5/2017. Our lump sum design fee for this work is $6,200. UPDATE (11/8/17): After discussions with Carmel on 11/1/17, it was agreed upon that the requested hourly fee is acceptable. This includes the following updates that will include a quality review prior to issuance as a construction change: • Update Typical Cross Sections • Update Plan & Profile • Retaining Wall Details • Update Cross Sections • Quantities and Cost Estimate Schedule: EXHIO A 2W-3 The work set out in "Exhibit A" of this Additional Services Amendment #6 shall be performed by Professional during Calendar Year 2017 and 2018. Fee: The following adjustment shall be made to the fee for the relevant services. 16 -ENG -05 Task Description Type Previous Total ASA 96 Revised Total Item 1 Roadway and Traffic Design LSUM $360,050.00 $21,700.00 $381,750.00 Item 2 Bidding & Construction Phase Services Hourly NTE $64,000.00 $30,000.00 $94,000.00 16 -ENG -35 Task Description Type Previous ASA #6 Revised Total Total Item 4 Roadway, Drainage, and Traffic Design LSUM $404,900.00 $6,200.00 $411,100.00 ASA #6 Total $57,900.00 3�3 INDIANA RETAIL TAX EXEMPTICERTIFICATE NO. 003120155 002 0 Cit®d Carmel FEDERAL EXCISE TAX EXEMPT ONE CIVIC SQUARE 35-6000972 CARMEL, INDIANA 46032-2584 FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997 PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. 11/21/2017 368938 C H A CONSULTING VENDOR 300 SOUTH MERIDIAN UNION STATION INDIANAPOLIS, IN 46225 - PURCHASE ID BLANKET CONTRACT PAYMENTTERMS 20887 QUANTITY UNIT OF MEASURE DESCRIPTION Department: 2200 Fund: 0 COIT Bond Fund Account 94-650.04 Page 1 of 1 PURCHASE ORDER NUMBER 100965 THIS NUMBER MUST APPEAR ON INVOICES, A/P VOUCHER, DELIVERY MEMO, PACKING SLIPS, SHIPPING LABELS AND ANY CORRESPONDENCE DESCRIPTION Project 16 -ENG -05; Contract Date 02.17.16 City Engineering's Office SHIP 1 Civic Square TO Carmel, IN 46032 - Kate Lustig FREIGHT - - --~ UNIT PRICE EXTENSION 1 Each ASA 6 - 96th Street Corridor Additional Design Send Invoice To: City Engineering's Office Kate Lustig 1 Civic Square Carmel, IN 46032 - DEPARTMENT GYOFCgq� $57,900.00 $57,900.00 Sub Total $57,900.00 �111p ANP' PLEASE INVOICE IN DUPLICATE ACCOUNT PROJECT PROJECTACCOUNT AMOUNT $57 900 00 SHIPPING INSTRUCTIONS 'SHIP PREPAID. 'C.O.D. SHIPMENT CANNOT BE ACCEPTED. 'PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945 AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY TITLE CONTROL N0. 100965 CLERK -TREASURER PAYMENT A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. Jeremy Kashman James Crider Director Administration