Loading...
Hannum Wagle & Cline Engineering, Inc/Eng/Adl Serv/123,600.00/Auman Newark Shoshone Sidewalk DesignHannum Wagle & Cline Engineering, Inc. Engineering Department - 2018 Appropriation # Fund 202 43.509.00, Fund 250 43-509.00; P.O. #102321 AQ Contract Not To Exceed $123,600.00 ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement") entered into by and between the City of Carmel and Hannum Wagle & Cline Engineering, Inc. (the "Professional'), as City Contract dated March 21, 2018 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA by and through its Board of Public Works and Safety By: Aq James Brainard, Presiding Officer Mary AnryBurke, Member Date: // 1414 l Lori S. W tso Date: I C—�- ATTT lcp�-If/ -�U� Christine Pauley, Clerk-Tre�Tj �/`d Date: ""��//ll lI [SX—t., 'Pfof.S— R C—h S—Tng —ingUGI84M'C Engi ring,1— ASA Y2.d-: 12212/2018 11:50 A.%Q Hannum Wagle & Cline Engineering, Inc. Authorized Signat8re �ftFy` 13aY-.1 6cZ Printed Name IFf- £s1 nu-` Title FID/TIN: 3S -17%03y5' Last Four of SSN if Sole Proprietor: Date: prof ec+ 18 -23 EXHIBIT A SCOPE OF SERVICES ADMAN NEWARK SHOSHONE SIDEWALK CITY OF CARMEL, INDIANA December 10, 2018 SERVICES TO BE FURNISHED BY CONSULTANT HWC Engineering (CONSULTANT) shall provide survey, design, construction plans, construction specifications, right of way engineering, bidding and contract administration assistance to the City of Carmel (CLIENT) for the Auman Newark Shoshone Sidewalk project. Work under this agreement will include sidewalk and storm water collection system improvements for approximately 115 -feet on the east side of Auman Drive West, 525 -feet on the east side of Oswego Road and 1500 -feet on the north side of Shoshone Drive, terminating at Auman Drive East. The sidewalk will be an extension of existing storm water collection systems and sidewalks on Oswego Road with curb and Shoshone Drive without curb. The scope will consist of the following services: Survey CONSULTANT will obtain needed topographical survey within the project limits. Tasks include the following: 1. Provide a topographical survey of the existing site conditions, as necessary for the development of design plans. Elements to be identified will be the existing utilities, pavements, buildings, ground contours, drainage conditions, and existing right-of-way. The survey will extend 30 feet from the centerline on both sides of each street on adjacent properties. 2. Identify affected property owners along the limits of the project. 3. Establish a temporary benchmark system. Design CONSULTANT will prepare design plans for this project. Improvements will be based on the design standards established by the City of Carmel. Tasks will include the following: 1. Coordinate and attend a utility coordination meeting. Complete needed follow up coordination and communication with the utilities — this will be limited to the areas where new sidewalks will be constructed. 2. Prepare and update an opinion of probable construction cost for the project based on estimated quantities. 3. Prepare a set of construction plans based on a combination of aerial mapping and topographic survey. Provide a preliminary plan set (30%) for CLIENT review and comment. Proposed sidewalks to be designed as extensions of the existing infrastructure in the area are estimated at approximately 2140 feet. Proposed storm system collection system to be designed is estimated at approximately 1200 feet and is expected to connect to existing storm collection infrastructure varying from 15 -inch to 18 -inch in diameter. No new storm discharge locations are anticipated. 4. Prepare final construction documents (100%) to reflect CLIENT review comments. Finalize opinion of probable construction cost and project specifications. CONSULTANT will submit all plans, specifications and cost estimates for final approval by the CLIENT. Property Owner Coordination CONSULTANT to provide property owner coordination as requested by the CLIENT. Coordination may be in the form of individual property owner meetings, or one town hall meeting with all stakeholders involved. The final format of this task will be left to the discretion of the CLIENT. Auman Newark Shoshone Sidewalk Design and Construction Services City of Carmel Exhibit "A" Page 1 of 3 Bidding Assistance Provide bidding services related to the contracted portions of the project as follows: 1. Scope is based on bidding one prime construction contract. 2. Prepare a notice to bidders and submit to the CLIENT for publication. 3. Coordinate the distribution of plans and specifications to bidders. Documents shall be made available to bidders at the cost of printing. 4. Conduct a pre-bid meeting 5. Answer bidder questions during the bid phase. 6. Issue addenda to clarify, correct or change the Bidding Documents. 7. Review bids submitted for conformance to the project documents. Submit a summary to the CLIENT. 8. Prepare a tabulation of bids received. 9. Assist the CLIENT in evaluating bids or proposals and in assembling and awarding contracts for the project. 10. The bidding phase fee is based upon one bidding of the project. The bidding phase shall be considered complete upon issuance of a Notice to Proceed, or 90 days following the receipt of bids. Construction Administration Complete construction administration services related to contracted portions of the project, including: 1. Facilitate one pre -construction conference. 2. Review shop drawings and submittals. 3. Review requests for change orders. 4. Review requests for information from the contractor. 5. Attend two construction progress meetings/site visit during the progress of construction. 6. Attend one project walk through. 7. Develop a punch list based on outstanding issues identified at the project walk through. 8. Review contractor's applications for payment. 9. Prepare construction record "as -built" drawings. The drawings shall be based on plan markups provided to CONSULTANT by the contractor. No field verification of the record drawing information by CONSULTANT is included. Construction Observation CONSULTANT shall provide Construction Observation Services for the project by providing a Resident Project Representative (RPR) during the construction of the project. The amount of time spent for construction observation shall not exceed 320 hours (+/- 2 months) of on-site inspection. Construction is assumed to begin in 2019 and be completed by November 2019. Responsibilities of the RPR shall be as follows: 1. Schedules: Review the progress schedule, schedule of Shop Drawing and Sample submittals, and schedule of values prepared by contractor and consult with CONSULTANT concerning acceptability. 2. Conferences and Meetings: Attend meetings with contractor, such as pre -construction conferences, progress meetings, job conferences and other project -related meetings, and prepare and circulate copies of minutes thereof. 3. Testing: Verify that tests are conducted in the presence of appropriate CLIENT's personnel, and that contractor maintains adequate records thereof. 7. Records: Maintain records on a daily basis for use in preparing Project documentation. Upon completion of the Work, furnish original set of all RPR Project documentation to CONSULTANT and a copy to the CLIENT. 8. Reports: Furnish to CONSULTANT periodic reports as required of progress of the Work and of contractor's compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. Furnish to CONSULTANT and CLIENT copies of all inspection and testing reports. 9. Payment Requests: Review Applications for Payment with contractor for compliance with the established procedure for their submission and forward with recommendations to CONSULTANT, noting particularly Auman Newark Shoshone Sidewalk Design and Construction Services City of Carmel Exhibit "A" Page 2of3 the relationship of the payment requested to the schedule of values, Work completed, and materials and equipment delivered at the Site but not incorporated in the Work. Client Meetings CONSULTANT will facilitate meetings as follows. Additional meetings shall constitute additional services. 1. (1) Kickoff Meeting/Site Visit 2. (1) 30% Plan Review Meeting/Field Check 3. (1) 100% Plan Review Meeting 4. (2) Construction Progress Meetings Right -of -Way Engineering 1. Prepare parcel descriptions and exhibits for proposed R/W taking or Permanent Easement and provide to the City. Stake newly acquired R/W for clearing Right-of-way services, which includes appraisals, title work, buying/negotiating, recording, and related services will all be provided by others. Schedule All work by the CONSULTANT under this contract shall be completed and delivered to the CLIENT for review and approval within the approximate time periods shown in the table below: Notice to Proceed April 2019 Survey Complete May 2019 ROW Engineering Begin/Preliminary Plan Set (30%) June 2019 Property Owner Coordination July/August 2019 Final Construction Documents August 2019 ROW Engineering Complete/Bidding Phase September 2019 Construction Phase Complete November 2019 Fees Survey $ 11,500.00 Lump Sum Design $ 40,600.00 Lump Sum Property Owner Coordination $ 8,500.00 Hourly NTE Bidding Assistance $ 6,400.00 Lump Sum Construction Administration $ 12,400.00 Hourly NTE Construction Observation $ 32,200.00 Hourly NTE Right-of-way Engineering & Staking $ 12,000.00 ($2,00 per parcel—assuming 6 parcels) Assumptions and Exclusions '* 123 , b OO . o d tJ'TE 1. Services include design of a sidewalk and drainage improvements only. 2. Preparations of any easements would be considered ROW Engineering 3. Preparations of any permit applications are not included since there are no permits anticipated for the described project. 4. All fees for permit applications, legal publishing, and any others that may arise shall be paid by others. 5. Legal services and/or representation at legal proceedings including but not limited to property re -zoning, plan commission submittals, etc. are not included. 6. No environmental investigations are included. 7. No wetlands determination or delineation is included. 8. The coordination, preparation, negotiation, acquisition and staking of needed easements shall be by others. 9. No historical or archaeological reviews or investigations are included. 10. No geotechnical engineering or investigations are included. Auman Newark Shoshone Sidewalk Design and Construction Services City of Carmel Exhibit "A" Page 3of3 City f Carmel INDIANA RETAIL TAX EXEMPT CERTIFICATE NO. 003120155 002 0 FEDERAL EXCISE TAX EXEMPT ONE CIVIC SQUARE 35-6000972 CARMEL, INDIANA 46032-2584 APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997 :RASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR No. 12/11/2018 366795 H W C ENGINEERING 601 SOUTH 3RD ST TERRE HAUTE, IN 47807 - PURCHASE ID BLANKET CONTRACT 32004 QUANTITY I UNIT OF MEASURE Department: 2200 Fund:202 Account: 43-509.00 PAYMENTTERMS DESCRIPTION Local Road & Street Fund Page 1 of 1 PURCHASE ORDER NUMBER 102321 THIS NUMBER MUST APPEAR ON INVOICES, A/P VOUCHER, DELIVERY MEMO, PACKING SUPS, SHIPPING LABELS AND ANY CORRESPONDENCE DESCRIPTION Project 18-23; Contract Date 03.21.18 City Engineering's Office SHIP 1 Civic Square TO Carmel, IN 46032 - Kate Lustig 1 Each ASA 2 - Auman Newark Shoshone Sidewalk Design Department: 2200 Fund: 250 Storm Water Account: 43-509.00 1 Each ASA 2 - Auman Newark Shoshone Sidewalk Design Send Invoice To: City Engineering's Office Kate Lustig 1 Civic Square Carmel, IN 46032- �1\ PLEASE INVOICE IN DUPLICATE DEPARTMENT ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT PAYMENT $123,600.00 SHIPPING INSTRUCTIONS'A/PVOUCHER CANNOT BEAPPROVED FOR PAYMENT UNLESS THE P.O. NUMBER ISMADE A PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN 'SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBUGATED BALANCE IN 'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. *PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL �7 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 194:��-+d Pi( AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY Jeremy Kashman James Crider TITLE Director Administration CONTROL N0. 1 0232 1 CLERK -TREASURER FREIGHT UNIT PRICE EXTENSION $31,076.61 $31,076.61 Sub Total $31,076.61 $92,523.39 _ $92,523.39 Sub Total $92,523.39 1 Civic Square Carmel, IN 46032- �1\ PLEASE INVOICE IN DUPLICATE DEPARTMENT ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT PAYMENT $123,600.00 SHIPPING INSTRUCTIONS'A/PVOUCHER CANNOT BEAPPROVED FOR PAYMENT UNLESS THE P.O. NUMBER ISMADE A PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN 'SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBUGATED BALANCE IN 'C.O.D. SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. *PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL �7 'THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 194:��-+d Pi( AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDERED BY Jeremy Kashman James Crider TITLE Director Administration CONTROL N0. 1 0232 1 CLERK -TREASURER