Loading...
106th Street FM Plans_issued for construction_combined set_052716CLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106th STREET PARALLEL FORCEMAIN PROJECT LOCATION BOARD OF TRUSTEES GRW PROJECT NO. : 4388-01 TO W N E R O A D MAY 2016 &#6' &#44'059'..52' +0&+#0#4')01 /#; engineeringarchitecturegeospatial www.grwinc.com U . S . H W Y . 4 2 1 ( M I C H I G A N R O A D ) IS S U E D F O R C O N S T R U C T I O N 106th ST. 96th ST. 116th ST. DI T C H R O A D SH E L B O R N E R O A D SP R I N G M I L L R O A D I-465 ▪ CTRWD ▪ ▪▪ ▪ S T A T E O F I N D I A N A HAMILTO N C O U N T Y C L A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T MARILYN ANDERSON - PRESIDENT JOSEPH CLARK - VICE PRESIDENT MICHAEL MCDONALD -SECRETARY JANE MERRILL -TREASURER AMANDA FOLEY - MEMBER CHUCK FORD - MEMBER ERIC HAND -MEMBER CARL MILLS -MEMBER STEVE PITTMAN -MEMBER ANDREW WILLIAMS -UTILITY DIRECTOR RYAN HARTMAN -DISTRICT ENGINEER WESLEY MERKLE -ENGINEERING MANAGER MA Y F L O W E R P A R K D R I V E 1.ALL LOCATIONS, SIZES, MATERIALS, AND/OR INVERTS OF EXISTING UTILITIES ARE SHOWN BASED ON THE BEST INFORMATION AVAILABLE. HOWEVER, THE ENGINEER DOES NOT GUARANTEE OR ASSURE THAT SUCH INFORMATION IS TRUE OR EVEN APPROXIMATE. THE CONTRACTOR SHALL DETERMINE WHICH UTILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS AND VERIFY THEIR LOCATIONS, SIZES, AND INVERTS. THE CONTRACTOR SHALL ADJUST WORK ACCORDINGLY AND NOTIFY THE OWNER AND ENGINEER OF ANY SUCH CONFLICTS AND/OR ADJUSTMENTS. THE CONTRACTOR SHALL REFER TO APPLICABLE SECTIONS OF THE SPECIFICATIONS RELATIVE TO THE ABOVE. 2.CONTRACTOR SHALL COORDINATE ALL WORK WITH THE RESPECTIVE UTILITIES, BOTH EXISTING AND PROPOSED. UNLESS OTHERWISE NOTED OR SPECIFIED, CONTRACTOR SHALL NOTIFY UTILITIES A MINIMUM OF THREE (3) FULL WORKING DAYS IN ADVANCE OF REMOVING, RELOCATING, DISTURBING, OR ANY RELATED CONSTRUCTION ACTIVITY CAUSING A CONFLICT WITH ANY UTILITY AND SHALL ADJUST HIS/HER WORK SCHEDULE ACCORDINGLY. 3.CONTRACTOR IS RESPONSIBLE FOR RELOCATING AND/OR SUPPORTING AT CONTRACTOR'S EXPENSE, ANY UTILITY LINES AND/OR SERVICE POLES NECESSARY TO COMPLETE CONSTRUCTION OPERATIONS. UTILITY POLES ARE SHOWN ON THE PLANS, BUT OVERHEAD LINES HAVE BEEN OMITTED FOR CLARITY. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF OVERHEAD OBSTRUCTIONS, ESPECIALLY OVERHEAD ELECTRIC LINES. 4.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DONE TO STATE, CITY/TOWN OR PRIVATE PROPERTY, DRIVES, SIDEWALKS, BRIDGES, DRAINAGE PIPE SYSTEMS, FENCES, SHEDS, ETC. AS A RESULT OF THE CONTRACTORS WORK AND SHALL BE RESPONSIBLE FOR REPAIR AND/OR REPLACEMENT AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE PERMITTING AGENCY, THE OWNER, AND THE ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE RESTORATION. SITE RESTORATION SHALL BE EQUAL TO OR BETTER THAN CONDITIONS PRIOR TO CONSTRUCTION. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING FLOW AND PROVIDING BYPASS PUMPING AS REQUIRED DURING CONSTRUCTION OPERATIONS. SUCH FLOW SHALL BE CONTINUOUSLY MONITORED AS NOT TO ALLOW SEWAGE BACK-UP WHICH MAY CAUSE PROPERTY DAMAGE. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY DAMAGE INCURRED AND MUST MAKE RESTITUTION WITH ANY AFFECTED PROPERTY OWNER(S)(SEE SPEC. 01125). 6.EXISTING SEWER INTERCEPTORS, GRAVITY SEWERS, LIFT STATIONS & FORCE MAINS SHALL REMAIN IN CONTINUOUS SERVICE THROUGHOUT THE CONSTRUCTION PERIOD UNTIL SUCCESSFUL START-UP OF THE PROPOSED FORCEMAIN. CONTRACTOR SHALL PROVIDE CONTINUOUS ON-SITE SUPERVISION OF ANY BYPASS PUMPING OPERATIONS THAT OCCUR DURING CONSTRUCTION & NON-CONSTRUCTION HOURS. PROPOSED BYPASS SYSTEM SHALL INCLUDE EMERGENCY STANDBY/BACK-UP PROVISIONS AND SHALL BE APPROVED BY THE OWNER AT LEAST TWO (2) FULL WORKING DAYS IN ADVANCE OF INITIATING ANY BYPASS OPERATIONS. REFER TO SPEC. SECTION 01125. 7.NEW FORCE MAIN SHALL BE INSTALLED AT THE UNIFORM HORIZONTAL DISTANCE BETWEEN SUCCESSIVE HORIZONTAL LOCATION COORDINATES AS SHOWN ON THE PLANS. BASELINE STATIONING IS ALONG THE CENTERLINE OF THE NEW FORCEMAIN. 8.THE CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL WITHIN STATE AND CITY/TOWN RIGHTS-OF-WAY. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLANS TO CITY/TOWN, ENGINEER, AND OWNER FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. REFER TO SPEC. SECTION 01120 AND SHEET C-19 FOR ADDITIONAL REQUIREMENTS. 9.WITHIN CITY/TOWN RIGHTS-OF-WAY, ONE LANE OF TRAFFIC SHALL BE OPEN AT ALL TIMES ALONG ALL CITY/TOWN ROADS DURING WORKING HOURS AND TWO LANES OPEN AFTER WORKING HOURS. FLAGMEN AND SIGNAGE SHALL BE USED WHEN TRAFFIC FLOW IS RESTRICTED TO ONE LANE AS SHOWN ON SHEET C-19. ALL SIGNAGE USED DURING HOURS OF DARKNESS SHALL BE REFLECTORIZED AND EQUIPPED WITH FLASHING LIGHTS. CONTRACTOR SHALL MOVE BARRICADES AND OTHER DEVICES TO ADJUST TO SHIFTING WORK ZONES. OBSTRUCTION OF TRAFFIC SHALL BE KEPT TO A MINIMUM. 10.CONTRACTOR SHALL NOTIFY OWNER, CITY/TOWN, INDOT, ENGINEER, LAW ENFORCEMENT & EMERGENCY SERVICES, SCHOOL DISTRICT, TRASH PICK-UP SERVICE, AND AFFECTED RESIDENTS 48 HOURS PRIOR TO TEMPORARILY CLOSING ANY LANES OF TRAFFIC, INCLUDING PRIVATE DRIVEWAYS. PRIVATE DRIVEWAYS TO BE DISTURBED AND REPAIRED SHALL NOT BE SHUT DOWN LONGER THAN 8 HOURS. TRAFFIC SHALL BE BARRICADED FROM DRIVEWAY OR DRIVEWAY SHALL BE STEEL PLATE SPANNED TO ALLOW FOR MINIMUM CURING TIME. COMPLY WITH CITY/TOWN/STATE REQUIREMENTS TO RECEIVE PERMIT APPROVAL FOR ALL WORK WITHIN CITY/TOWN/STATE RIGHT-OF-WAY. 11.UNLESS OTHERWISE NOTED OR SPECIFIED, CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO AVOID DISTURBANCE, DAMAGE, OR REMOVAL OF EXISTING TREES/VEGETATION WITHIN CONSTRUCTION LIMITS, INCLUDING CANOPIES, TRUNKS, AND ROOTS. IF DAMAGE OR REMOVAL IS NON-AVOIDABLE, CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER PRIOR TO INSTALLATION WITHIN AFFECTED AREA. 12.HORIZONTAL OR VERTICAL BENDS WHERE NOTED ON THE DRAWINGS ARE PROVIDED FOR ALIGNMENT PURPOSES ONLY, AND MAY NOT BE ALL-INCLUSIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING QUANTITY, LOCATION, AND ORIENTATION OF BENDS AND OFFSETS ALONG FORCE MAIN ROUTE TO MAINTAIN MINIMUM DEPTH OF COVER AND MINIMUM REQUIRED CLEARANCES FROM EXISTING AND PROPOSED UTILITIES. 13.UNLESS OTHERWISE NOTED ON THE PROFILE DRAWINGS, MINIMUM DEPTH OF COVER OF PROPOSED FORCEMAIN IS 4.5 FEET FOR ALL OPEN CUT INSTALLATIONS AND 6 FEET FOR ALL HORIZONTAL DIRECTIONAL DRILLING INSTALLATIONS. CONTRACTOR SHALL VARY DEPTH OF PROPOSED FORCEMAIN (NOT TO EXCEED 10 FT. MAX. DEPTH WITHOUT PRIOR APPROVAL FROM ENGINEER AND OWNER) AS NECESSARY TO TRANSITION BETWEEN OPEN CUT TO HORIZONTAL DIRECTIONAL DRILLING AND AVOID CREATION OF HIGH SPOTS ALONG ROUTE, EXCEPT WHERE AIR RELEASE VALVES ARE SHOWN ON DRAWINGS. 14.CONCRETE SIDEWALK AND CURB SHALL BE REPLACED TO NEXT JOINT. 15.ALL DAMAGED CMP CULVERT PIPES SHALL BE REPLACED WITH 18" MIN. RCP PIPE WITH RCP END SECTIONS. UTILITIES )'0'4#.016'5 PI IP YARD LIGHT FLAT GRATE CLEAN OUT CONTROL POINT SECTION CORNER TRAFFIC MANHOLE TELEPHONE PEDESTAL RIGHT OF WAY MARKER MAIL BOX POWER POLE STREET SIGN POT POST SANITARY SEWER MANHOLE STORM SEWER MANHOLE TREE (DECIDUOUS) TREE (CONIFEROUS) TEMP. BENCHMARK (TBM) MISCELLANEOUS DOWN SPOUT FLOW ARROW GUY WIRE TELEPHONE MANHOLE ELECTRIC PEDESTAL FIRE HYDRANT LIGHT POLE INLET HAND HOLE BEEHIVE GRATE GATE GAS MARKER WATER VALVE GAS VALVE WATER METER GAS METER ELECTRIC MANHOLE BUSH POINT OF INTERSECTION CENTERLINE DITCH OR FLOWLINE CABLE TV 1' CONTOUR 5' CONTOUR STORM CULVERT UNDERGROUND ELECTRIC FENCE GAS MAIN APPROX. PROPERTY LINE PROPOSED FORCEMAIN STORM SEWER WATER MAIN RAILROAD UNDERGROUND TELEPHONE SURFACE RESTORATION PROPOSED SANITARY MANHOLE PROPOSED CURB INLET PROPOSED STORM MANHOLE PROPOSED 11° BEND PROPOSED 22° BEND PROPOSED 45° BEND PROPOSED 90° BEND PROPOSED CAP PROPOSED FIRE HYDRANT PROPOSED TEE PROPOSED VERTICAL TEE PROPOSED WATER VALVE PROPOSED REDUCER PROPOSED DITCH PROPOSED RIGHT-OF-WAY PROPOSED SANITARY SEWER PROPOSED PERMANENT FENCE GRANULAR FILL (AT PROFILE) TEMPORARY RIGHT-OF-WAY PERMANENT EASEMENT CONSTRUCTION LIMITS 5;/$1.5.')'0& DUCTILE IROND.I. EXISTING RIGHT-OF-WAY R.J.D.I. PK NAIL, REBAR, RR SPIKE IRON PIPE (SURVEY MON.) RESTRAINED JOINT DUCTILE IRON SOIL BORING SANITARY SEWER EXISTING YARD PIPING; ABANDONED IN PLACE ASPHALT PAVING CONCRETE PAD / SIDEWALK / PAVING STONE PERIMETER GRASS DEMOLITION AREA (AT DEMO. PLAN) GENERAL ---COVER SHEET G-01 GENERAL NOTES AND INDEX OF DRAWINGS G-02 SURVEY CONTROL AND SHEET INDEX CIVIL C-01 FORCEMAIN PLAN AND PROFILE - B.O.P. STA. 0+00 TO STA. 12+50 LINE "FM-1" C-02 FORCEMAIN PLAN AND PROFILE - STA. 12+50 TO STA. 18+50 LINE "FM-1" C-03 FORCEMAIN PLAN AND PROFILE - STA. 18+50 TO STA. 32+50 LINE "FM-1" C-04 FORCEMAIN PLAN AND PROFILE - STA. 32+50 TO STA. 47+50 LINE "FM-1" C-05 FORCEMAIN PLAN AND PROFILE - STA. 47+50 TO STA. 62+50 LINE "FM-1" C-06 FORCEMAIN PLAN AND PROFILE - STA. 62+50 TO STA. 77+50 LINE "FM-1" C-07 FORCEMAIN PLAN AND PROFILE - STA. 77+50 TO STA. 92+50 LINE "FM-1" C-08 FORCEMAIN PLAN AND PROFILE - STA. 92+50 TO STA. 107+50 LINE "FM-1" C-09 FORCEMAIN PLAN AND PROFILE - STA. 107+50 TO STA. 122+50 LINE "FM-1" C-10 FORCEMAIN PLAN AND PROFILE - STA. 122+50 TO STA. 137+50 LINE "FM-1" C-11 FORCEMAIN PLAN AND PROFILE - STA. 137+50 TO STA. 152+20 LINE "FM-1" C-12 FORCEMAIN PLAN AND PROFILE - STA. 152+50 TO STA. 167+50 LINE "FM-1" C-13 FORCEMAIN PLAN AND PROFILE - STA. 167+50 TO E.O.P. STA. 173+39 LINE "FM-1" FORCEMAIN PLAN AND PROFILE - B.O.P. STA. 0+00 TO E.O.P. STA. 5+21 LINE "FM-2" C-14 FORCEMAIN PLAN AND PROFILE - STA. B.O.P. STA. 0+00 TO E.O.P. STA. 7+12 LINE "FM-3" C-15 FORCEMAIN TERMINATION AT MICHIGAN ROAD WWTP C-16 VALVE VAULT PLANS, SECTIONS AND DETAIL C-17 STANDARD DETAILS C-18 STANDARD DETAILS C-19 STANDARD DETAILS C-20 EROSION CONTROL PLAN C-21 EROSION CONTROL DETAILS ELECTRICAL E-01 NEW VALVE VAULT - ELECTRICAL PLANS E-02 FORCEMAIN TERMINATION AT MRWWTP - ELECTRICAL PLANS E-03 NEW VALVE VAULT - ELECTRICAL ONE-LINE DIAGRAM E-04 NEW VALVE VAULT - I & C WIRING DIAGRAM E-05 NEW VALVE VAULT - ACTUATOR CONTROL WIRING DIAGRAM E-06 NEW VALVE VAULT - VALVE CONTROL RTU PANEL DETAILS E-07 NEW VALVE VAULT - VALVE CONTROL RTU PANEL WIRING DIAGRAM PROPOSED CONTOUR MATCH EXISTINGM.E. PROPOSED AIR RELEASE VALVE / VAULT +0&':1(&4#9+0)5 01&'5%4+26+10 FLOWABLE FILL (AT PROFILE) STRUCTURAL FILL (AT PROFILE) CTV ST W NOTE: SYMBOLS MAY NOT BE ALL-INCLUSIVE. SYMBOLS USED BUT NOT LISTED HEREIN MAY BE DEFINED ELSEWHERE. IF NOT, CONTACT THE ENGINEER FOR CLARIFICATION PRIOR TO BIDDING. SYMBOLS MISSING FROM THE DRAWINGS DO NOT EXCUSE THE CONTRACTOR FROM PROVIDING THE WORK. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 0 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - G - 0 1 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m -- - - -- - - -- - - -- - - 16 0 1 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 IN D E X O F D R A W I N G S GE N E R A L N O T E S A N D DS W DR C JA J CJ F NONE G-01 NON-SHRINK GROUTN/S MECHANICAL JOINTM.J. FLANGEDFLG. STAINLESS STEELS.S. SANITARY SEWER CLAY TOWNSHIP REGIONAL WASTE DISTRICT CONTACT: WES MERKLE (317) 844-9200 LEGAL DRAINS HAMILTON COUNTY SURVEYORS OFFICE CONTACT: GREG HOYES (317) 776-8495 CABLE COMCAST CABLE CONTACT: THOMAS SPENCER (317) 752-9426 BRIGHTHOUSE CABLE 3030 ROOSEVELT AVENUE INDIANAPOLIS, IN 46217 CONTACT: JASON KIRKMAN (317) 632-9077 x258 FIBER OPTIC INDIANA FIBER NETWORK CONTACT: KEITH HAMM (317) 280-4636 LEVEL 3 CONTACT: DEWAYNE HAMILTON (317) 916-2708 ZAYO BANDWIDTH CONTACT: JIM KELLAM (303) 381-4683 TELEPHONE AT&T CONTACT: JAKE GREENWALD (317) 265-2896 GAS VECTREN ENERGY DELIVERY 4324 MIDDLE RD. COLUMBUS, IN 47203 CONTACT: JOANIE CLARK (317) 776-5532 BUCKEYE PIPELINE CONTACT: ROY BAUER (317) 370-0313 PANHANDLE EASTERN PIPELINE CONTACT: MARK WOOD (317) 733-3232 ELECTRIC DUKE ENERGY CONTACT: CHRISTINA GIROD (317) 776-5329 IPL 1230 WEST MORRIS STREET INDIANAPOLIS, IN 46221 CONTACT: RHONDA WILLIAMS (317) 261-5203 WATER CITIZENS ENERGY GROUP CONTACT: GARRETT DALTON (317) 710-6118 CARMEL UTILITIES CONTACT: JOHN DUFFY (317) 733-2855 STORM SEWER CARMEL CONTACT: JEREMY KASHMAN (317) 571-2441 ZIONSVILLE CONTACT: LANCE LANTZ (317) 873-4544 PLAN MARK BID SCHEDULE BASE BID A - OPEN CUT INSTALLATION - 20" STANDARD PVC C905 DR21 (REFER TO SPEC. SECTION 02531 FOR REQUIREMENTS) B - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 24" HDPE DR11, IPS (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) C - BORING & JACKING (30" STEEL CASING) - 24" HDPE DR11, IPS (REFER TO SPEC. SECTIONS 02400 & 02531 FOR REQUIREMENTS) D - OPEN CUT INSTALLATION - 12" STANDARD PVC C900 DR18 (REFER TO SPEC. SECTION 02531 FOR REQUIREMENTS) E - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 14" HDPE DR11, IPS (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) BID ALTERNATE NO. 1 A - OPEN CUT INSTALLATION - 20" STANDARD PVC C905 DR21 (REFER TO SPEC. SECTION 02531 FOR REQUIREMENTS) B - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 20" FUSIBLE PVC C905 DR21 (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) C - BORING & JACKING (30" STEEL CASING) - 20" FUSIBLE PVC C905 DR21 (REFER TO SPEC. SECTIONS 02400 & 02531 FOR REQUIREMENTS) D - OPEN CUT INSTALLATION - 12" STANDARD PVC C900 DR18 (REFER TO SPEC. SECTION 02531 FOR REQUIREMENTS) E - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 12" FUSIBLE PVC C900 DR18 (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) PLAN MARK BID SCHEDULE BID ALTERNATE NO. 2 A B - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 24" HDPE DR11, IPS (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) C - BORING & JACKING (30" STEEL CASING) - 24" HDPE DR11, IPS (REFER TO SPEC. SECTIONS 02400 & 02531 FOR REQUIREMENTS) D E - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 14" HDPE DR11, IPS (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) BID ALTERNATE NO. 3 A B - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 20" FUSIBLE PVC C905 DR21 (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) C - BORING & JACKING (30" STEEL CASING) - 20" FUSIBLE PVC C905 DR21 (REFER TO SPEC. SECTIONS 02400 & 02531 FOR REQUIREMENTS) D E - HORIZONTAL DIRECTIONAL DRILLING (HDD) - 12" FUSIBLE PVC C900 DR18 (REFER TO SPEC. SECTIONS 02508 & 02531 FOR REQUIREMENTS) NOTE: FITTINGS SHOWN ON PLAN & PROFILE SHEETS REPRESENT BASE BID INSTALLATION (SEE GENERAL NOTE 12, THIS SHEET). (14%'/#+0$+&5%*'&7.' 5''241(+.'5 HORIZONTAL DIRECTIONAL DRILL (AT PLAN VIEW) BORE AND JACK WITH STEEL CASING (AT PLAN VIEW) CP 301 PK NAIL / EL. = 889.42 CP 302 PK NAIL / EL. = 887.78 N = 1707953.027 E = 166832.098 N = 1709261.437 E = 166800.282 NOTE: UNLESS OTHERWISE NOTED, ALL ELEVATIONS REFERENCED HEREIN ARE BASED ON NAVD88 VERTICAL DATUM. NAD83 INDIANA STATE PLANE, EAST ZONE, U.S. FOOT. BENCHMARK "S 78" EL. = 900.28 ABOUT 0.9 MILES SOUTHEAST ALONG U.S. HIGHWAY 421 FROM THE INTERSECTION WITH STATE HIGHWAY 334 NEAR EAGLE VILLAGE, 0.2 MILE NORTHWEST OF A GRAVEL ROAD INTERSECTION, 0.5 MILE SOUTHEAST OF THE HAMILTON-BOONE COUNTY LINE, 48 FEET NORTHEAST OF THE CENTER LINE OF THE HIGHWAY, 17 FEET NORTHWEST OF THE CENTERLINE OF A FARM DRIVEWAY, 141 FEET WEST OF THE NORTHWEST CONER OF A 2-STORY FARM HOUSE, 57 FEET SOUTHWEST OF THE SOUTHWEST CORNER OF A WELLHOUSE, 2 FEET SOUTHEAST OF A WHITE WOODEN WINTNESS POST AND ABOUT 2 FEET ABOVE HIGHWAY LEVEL. A STANDARD DISK, STAMPED "S 78 1946" AND SET IN THE TOP OF A CONCRETE POST PROJECTING 5 INCHES ABOVE GROUND. CP 303 PK NAIL / EL. = 896.57 N = 1709714.380 E = 167239.382 CP 304 CAPPED REBAR / EL. = 895.05 N = 1709609.294 E = 168152.030 CP 305 PK NAIL / EL. = 896.99 N = 1709693.263 E = 169029.746 CP 306 PK NAIL / EL. = 893.69 N = 1709695.802 E = 170188.918 51.0'13.0' 81.2' CP 307 PK NAIL / EL. = 894.66 N = 1709735.408 E = 171055.865 CP 308 PK NAIL / EL. = 899.65 N = 1709706.825 E = 172165.215 CP 309 PK NAIL / EL. = 896.45 N = 1709726.070 E = 173114.809 CP 310 PK NAIL / EL. = 894.58 N = 1709694.999 E = 174318.560 CP 311 PK NAIL / EL. = 891.94 N = 1709737.582 E = 175030.067 CP 312 PK NAIL / EL. = 886.25 N = 1709722.760 E = 176135.895 CP 313 PK NAIL / EL. = 879.52 N = 1709782.902 E = 177002.661 15.4' 14.1' 19.7' MA Y F L O W E R P A R K D R . MA Y F L O W E R P A R K D R . 16.6' 18.7' 24.2' NO T T I N G H A M W A Y W 106TH ST. W 106TH ST. US 4 2 1 / M I C H I G A N 49.8' 28.4' 4.4' CP 314 PK NAIL / EL. = 847.93 N = 1709801.220 E = 178048.746 W 106TH ST.7.0' 60.3' 53.3' CO M M E R C E D R . W 106TH ST. TRAIL 26.6' 23.2' 34.8' W 106TH ST. TRAIL 19.8' 25.2'75.5' 27.4' 19.3' 18.7'W 106 T H S T . W 106TH ST. 21.9' 26.9' 21.8' TRAIL W 106TH ST. FE R G U S A V E . 14.4'17.1' 32.0' W 106TH ST. IR O N H O R S E 43.9' 34.6' 43.3' TRAIL 54.5' 43.9' W 106TH ST. LO N D O N B E R R Y B L V D . 45.0' 13.8'18.3' W 106TH ST. TRAIL FENCE TRAIL W 106TH ST. 22.3'28.7' 15.1' CP 319 PK NAIL / EL. = 855.06 N = 1709822.740 E = 182175.041 CP 320 PK NAIL / EL. = 848.07 N = 1709829.575 E = 182903.124 CP 321 PK NAIL / EL. = 849.22 N = 1709753.371 E = 183553.255 TRAIL W 106TH ST. TRAIL 15.8' 19.6' 46.2' 75.5'10.3' 69.7' W 106TH ST. DI T C H R D . W 106TH ST. TRAIL 32.6'28.8' 55.0' PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 1 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - G - 0 2 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m CP 315 PK NAIL / EL. = 870.60 N = 1709693.263 E = 179009.849 CP 316 PK NAIL / EL. = 855.57 N = 1709794.429 E = 179993.223 TRAIL W 106TH ST. WO O D H A L L D R . 59.0' 26.3' 64.7' TRAIL W 106TH ST. FENCE 57.9' 35.5' 33.2' CP 317 PK NAIL / EL. = 861.80 N = 1709813.673 E = 180845.589 CP 318 PK NAIL / EL. = 847.50 N = 1709766.336 E = 181514.898 20.3' 26.1' 22.6' TRAIL W 106TH ST. FENCE 82.9' 73.9' 39.6' 56.1' W 106TH ST. TRAIL CR O O K E D S T I C K D R . C-01 C-0 2 C-03 C-04 C-05 C-06 C-07 C-08 C-09 C-10 C-11 C-12 C-13 FENCE EOP EOP EOP EOPEOP EOP TRAIL TRAIL CP 301 CP 303 CP 306 CP 307 CP 314 CP 313 CP 312 CP 311 CP 310 CP 309 CP 308 CP 315 CP 316 CP 317 CP 318 CP 319 CP 320 CP 321 DRIVEWAY WV T. PED. FH ST. MH ST. MH FH SAN. MH SIGN TREE T. PED. MAST FIBER OPTICS MARKER WV ST. MH PWP PWP TREE TREE TREE TREE TREE TREE ST. MH ST. MH ST. MH SAN. MH SAN. MH SAN. MH SIGN SIGN SIGN SIGNWVWV FH FH FH FH T. PED. PWP PWP PWP PWP PWP PWP PWP PWP HEADWALL PWP ARV MH EOP GUY WIRE BRICK WALL POST POST BRICK COLUMN GATE POST LIGHT P O L E EDGE OF CONCRETE END OF GUARD RAIL GR HEADWALL CP 304 CP 305 CP 301 CP 302 CP 302 CP 303 CP 304 CP 305 CP 306 CP 307 CP 308 CP 309 CP 310 CP 311 CP 312 CP 313 CP 314 CP 315 CP 316 CP 317 CP 318 CP 319 CP 320 CP 321 W. 106TH STREET U . S . 4 2 1 ( M I C H I G A N R O A D ) SH E L B O R N E R O A D TO W N E R O A D DI T C H R O A D LA N E CR O O K E D S T I C K TO R R E Y PINE S C I R C L E LO N D O N B E R R Y BO U L E V A R D KI N G S M I L L D R I V E IR O N H O R S E L A N E GR E E N T R E E D R . FE R G U S A V E . CO N N A U G H T D R . ST E E P L E C H A S E D R . WA L N U T C R E E K R D . WES T O N D R I V E C O M M E R C E D R . W A L N U T C R E E K D R . W O R K O U T W A Y NO T T I N G H A M W A Y DE A N D R A D R I V E MA Y F L O W E R P A R K D R . WI N D E M E R E BO U L E V A R D CO P P E R G A T E S P R I N G M I L L R U N NOT TO SCALE SURVEY CONTROL NOT TO SCALE SHEET INDEX MA T C H L I N E MA T C H L I N E SE E T H I S S H E E T SE E T H I S S H E E T MA T C H L I N E MA T C H L I N E SE E T H I S S H E E T SE E T H I S S H E E T W. 106TH STREET NEW 20" FORCEMAIN (LINE "FM-1") NEW 20" FORCEMAIN (LINE "FM-1") NEW 20" FORCEMAIN (LINE "FM-1") NEW 20" FORCEMAIN (LINE "FM-1") -- - - -- - - -- - - -- - - 16 0 1 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 SH E E T I N D E X SU R V E Y C O N T R O L A N D DS W DR C JA J CJ F NONE G-02 IS S U E D F O R C O N S T R U C T I O N C-14 G G G G G G G G G G G G G G FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T F M F M FM FM F M FM FM FM FM G FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 0+ 0 0 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 TG G F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O E. G . = 8 9 0 . 5 IN V . = 8 8 3 . 5 0 E. G . = 8 8 6 . 2 IN V . = 8 7 7 . 3 6 E. G . = 8 8 5 . 4 IN V . = 8 7 6 . 5 1 E. G . = 8 8 5 . 0 IN V . = 8 7 5 . 6 6 E. G . = 8 8 6 . 2 IN V . = 8 7 4 . 8 2 E. G . = 8 8 6 . 5 IN V . = 8 7 3 . 9 7 E. G . = 8 8 6 . 6 IN V . = 8 7 3 . 4 8 E. G . = 8 8 7 . 3 IN V . = 8 7 3 . 5 7 E. G . = 8 8 8 . 2 IN V . = 8 7 3 . 6 5 E. G . = 8 8 9 . 1 IN V . = 8 7 3 . 7 3 E. G . = 8 8 8 . 6 IN V . = 8 7 3 . 8 1 E. G . = 8 8 8 . 0 IN V . = 8 7 3 . 9 0 E. G . = 8 8 7 . 8 IN V . = 8 7 3 . 9 8 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 2 SE E S H E E T C - 0 2 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 3 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 1 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-01 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E B. O . P . S T A . 0 + 0 0 T O S T A . 1 2 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 B.O.P. STA. 0+00 TO STA. 12+50 LINE "FM-1" B.O.P. STA. 0+00 TO STA. 12+50 LINE "FM-1" B. O . P . S T A . 0 + 0 0 L I N E " F M - 1 " CO N N E C T T O 2 0 " P L U G VA L V E ( S E E D E T A I L S , SH E E T C - 1 5 F O R CO N N E C T I O N T O E X I S T I N G PR E - T R E A T M E N T B U I L D I N G ) NEW 20" FORCEMAIN EXISTING GRADE 12" MIN. EX I S T I N G T E L E P H O N E L I N E NEW 24" FORCEMAIN EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 1 4 " F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G W A T E R S E R V I C E EX I S T I N G G A S M A I N (3 ) E X I S T I N G F I B E R O P T I C L I N E S EX I S T I N G 1 2 " S T O R M S E W E R EX I S T I N G 2 1 " S T O R M S E W E R EX I S T I N G 1 6 " F O R C E M A I N EX I S T I N G T E L E P H O N E L I N E (3 ) E X I S T I N G E L E C T R I C A L L I N E S EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 2 4 " S T O R M S E W E R EX I S T I N G 1 2 " S T O R M S E W E R EX I S T I N G 3 6 " S T O R M S E W E R EX I S T I N G 3 6 " S T O R M S E W E R EX I S T I N G 1 2 " S T O R M S E W E R 18" MIN.18" MIN. EX I S T I N G 3 6 " S T O R M S E W E R NEW 24" FORCEMAIN 06-04-12-000-059.001-006 TOFG REAL ESTATE LLC 7313 MAYFLOWER PARK DRIVE 06-04-12-000-059.004-006 NORTHWEST HAITI CHRISTIAN MISSION 7271 MAYFLOWER PARK DRIVE 06-04-12-000-059.005-006 TOSA ENTERPRISES LLC 7221 MAYFLOWER PARK DRIVE 06-04-12-000-059.006-006 BIG PICTURE HOLDINGS LLC 7171 MAYFLOWER PARK DRIVE 06-04-12-000-059.007-006 BLACK FOREST HOLDING VII LTD 7113 MAYFLOWER PARK DRIVE 06-04-12-000-059.009-006 CROPPER, WARREN D. & SANDRA J. 7031 MAYFLOWER PARK DRIVE 06-04-12-000-066.000-006 CLAY TOWNSHIP REGIONAL WASTE DISTRICT 7236 MAYFLOWER PARK DRIVE 06-04-12-000-041.000-006 JONES, JERRY R. & BETTY L. 4929 W. 106TH STREET NEW 24" FORCEMAIN 06-04-12-000-050.000-006 JONES, JERRY R. & BETTY L. 4801 W. 106TH STREET 18" MIN. 18" MIN. 18" MIN.18" MIN. 12" MIN. 12" B.O.P. STA. 0+00 LINE "FM-1" CONNECT TO 20" PLUG VALVE (SEE DETAILS, SHEET C-15 FOR CONNECTION TO EXISTING PRE-TREATMENT BUILDING) STA. 0+27 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 0+61 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND AND 24"X20" R.J.D.I. REDUCER. BEGIN DIRECTIONAL DRILL MAYFLOWER PARK DRIVE MAYFLOWER PARK DRIVE ST A . 0 + 2 7 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 0 + 6 1 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° BE N D A N D 2 4 " X 2 0 " R . J . D . I . RE D U C E R . B E G I N DI R E C T I O N A L D R I L L 24" MIN. CE M E T E R Y C R E E K EXISTING SEWER EASEMENT EXISTING SEWER EASEMENT EXISTING PLATTED UTILITY AND DRAINAGE EASEMENT 0+00 PLUG VALVE (B.O.P.)1708086.95 166742.17 0+27 45° BEND 1708086.95 166769.54 0+61 45° BEND 1708110.43 166793.03 2+00 FORCEMAIN 1708249.84 166793.95 4+00 FORCEMAIN 1708449.83 166795.27 6+00 FORCEMAIN 1708649.81 166798.25 8+00 FORCEMAIN 1708849.79 166800.97 10+00 FORCEMAIN 1709049.79 166801.50 12+00 FORCEMAIN 1709249.36 166811.46 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING EX I S T I N G T E L E P H O N E L I N E 1,189' B REMOVE AND REPLACE FENCE AS REQUIRED TO COMPLETE WORK INSTALL GRANULAR BACKFILL 18" MIN. AP P . P L AP P . P L AP P . P L AP P . P L AP P . P L AP P . P L A P P . P L A P P . P L EXISTING PRE-TREATMENT BUILDING INSTALL VALVES (SEE DETAIL 1/C-15) NOTE (TYPICAL ALL SHEETS): E.G. = EXISTING GRADE ELEVATION INV. = PROPOSED FORCEMAIN INVERT ELEVATION INSTALL 4 L.F. OF CONCRETE CURB REPLACEMENT 9. 6 7 % S L O P E 0.81% SLOPE 0.08% SLOPE INV. 883.50 INV. 877.70 INV. 873.45 INSTALL 15 L.F. OF ASPHALT ROAD REPLACEMENT (METHOD "D") 61' A EX I S T I N G F I B E R O P T I C L I N E NEW 20" FORCEMAIN SB-01 IS S U E D F O R C O N S T R U C T I O N E. G . = 8 8 7 . 0 IN V . = 8 7 4 . 6 8 E. G . = 8 8 6 . 5 IN V . = 8 7 6 . 3 4 E. G . = 8 8 7 . 5 IN V . = 8 7 8 . 0 0 E. G . = 8 8 9 . 2 IN V . = 8 7 9 . 6 7 E. G . = 8 9 2 . 5 IN V . = 8 8 1 . 3 3 E. G . = 8 9 4 . 8 IN V . = 8 8 2 . 4 3 G G G G G G G G G FM FM FM FM FM FM FM FM FM FM F M FM F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F / O F / O F / O F/ O F/ O F/ O F/O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/O F/ O F/ O F/ O F/ O W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM F M F M FM F M F M 11+ 0 0 12+ 0 0 13+00 14+00 15+ 0 0 16+ 0 0 17+ 0 0 18 + 0 0 19 + 0 0 T CTV CT V CTV CTV CTV CTV CTV CT V CTV CT V C T V M A T C H L I N E M A T C H L I N E S E E S H E E T C - 0 1 S E E S H E E T C - 0 1 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 3 SE E S H E E T C - 0 3 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 4 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 2 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-02 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 1 2 + 5 0 T O S T A . 1 8 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 12+50 TO STA. 18+50 LINE "FM-1" STA. 12+50 TO STA. 18+50 LINE "FM-1" NEW 24" FORCEMAIN EXISTING GRADE EX I S T I N G 1 2 " W A T E R M A I N NEW 24" FORCEMAIN EX I S T I N G W A T E R M A I N EX I S T I N G 1 2 " S T O R M S E W E R EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 2 4 " S T O R M S E W E R (3 ) E X I S T I N G E L E C T R I C A L L I N E S (3 ) E X I S T I N G F I B E R O P T I C L I N E S EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N (2 ) E X I S T I N G T E L E P H O N E L I N E S EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G 1 2 " W A T E R M A I N 18" MIN. 06-04-12-000-059.009-006 CROPPER, WARREN D. & SANDRA J. 7031 MAYFLOWER PARK DRIVE 29-13-07-000-001.001-018 GARRISON ENTERPRISES LLC 4715 W. 106TH STREET 29-13-06-000-030.102-018 NOTTINGHAM LLC. 06-04-01-000-001.008-006 PEARSON REALTY LLC 4750 W. 106TH STREET 06-04-12-000-050.000-006 JONES, JERRY R. & BETTY L. 4801 W. 106TH STREET 06-04-12-000-060.001-006 MAYFLOWER PARK ASSOCIATION MAYFLOWER PARK DRIVE W. 1 0 6 T H S T R E E T W. 1 0 6 T H S T R E E T NO T T I N G H A M W A Y 18" MIN. 18" MIN. 18" MIN. STA. 15+48 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND 18" MIN.18" MIN. ST A . 1 5 + 5 6 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D AN D 2 4 " X 2 0 " R . J . D . I . R E D U C E R . BE G I N D I R E C T I O N A L D R I L L ST A . 1 4 + 8 5 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R A N D 2 0 " R . J . D . I . 22 . 5 ° B E N D . EN D D I R E C T I O N A L D R I L L STA. 14+85 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER AND 20" R.J.D.I. 22.5° BEND. END DIRECTIONAL DRILL 175' B EXISTING PLATTED UTILITES AND DRAINAGE EASEMENT EXISTING SANITARY SEWER EASEMENT EXISTING PLATTED UTILITIES AND DRAINAGE EASEMENT 14+00 FORCEMAIN 1709427.14 166898.37 14+85 22.5° BEND 1709496.08 166947.93 15+48 45° BEND 1709557.66 166962.08 15+56 45° BEND 1709563.45 166968.12 16+00 FORCEMAIN 1709571.40 167010.93 17+31 24"X20" REDUCER 1709593.85 167149.67 18+00 FORCEMAIN 1709598.26 167208.85 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING EXISTING SANITARY SEWER EASEMENT STA. 15+56 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND AND 24"X20" R.J.D.I. REDUCER. BEGIN DIRECTIONAL DRILL ST A . 1 5 + 4 8 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D STA. 17+31 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER. END DIRECTIONAL DRILL 235' B ST A . 1 7 + 3 1 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R . EN D D I R E C T I O N A L D R I L L INSTALL GRANULAR BACKFILL APP . P L APP . P L APP . P L A P P . P L A P P . P L PROPOSED SANITARY SEWER EASEMENT 1.63% SLOPE 0.84% SLOPE INV. 881.85 EX I S T I N G W A T E R M A I N 71' A 119' A 12" MIN. 18" MIN. INV. 874.03 NEW 24" FORCEMAIN NEW 20" FORCEMAIN NEW 20" FORCEMAIN NEW 24" FORCEMAIN NEW 20" FORCEMAIN NEW 20" FORCEMAIN SB-02 EX I S T I N G C A B L E T V L I N E EX I S T I N G C A B L E T V L I N E EX I S T I N G C A B L E T V L I N E EX I S T I N G C A B L E T V L I N E NOTE: 1.ALONG FORCEMAIN LINE "FM-1" FROM APPROX. STA.16+00 TO APPROX. STA. 27+40, CONTRACTOR SHALL COORDINATE WORK WITH COMCAST (MIN. 48 HOUR NOTICE), SUPPORT "CTV" UTILITY DURING CONSTRUCTION, AND RELOCATE TO SIDE OF FORCEMAIN TRENCH AS NECESSARY TO INSTALL FORCEMAIN LINE "FM-1". WORK ASSOCIATED WITH "CTV" UTILITY SUPPORT AND RELOCATION SHALL NOT BE A SEPARATE PAY ITEM AND SHALL BE CONSIDERED INCIDENTAL TO THE FORCEMAIN LINE "FM-1" INSTALLATION. IS S U E D F O R C O N S T R U C T I O N E. G . = 8 9 6 . 8 IN V . = 8 8 3 . 2 7 E. G . = 8 9 7 . 3 IN V . = 8 8 4 . 1 1 E. G . = 8 9 5 . 8 IN V . = 8 8 4 . 9 5 E. G . = 8 9 7 . 4 IN V . = 8 8 5 . 7 9 E. G . = 8 9 5 . 6 IN V . = 8 8 6 . 6 3 E. G . = 8 9 4 . 9 IN V . = 8 8 7 . 4 7 E. G . = 8 9 4 . 2 IN V . = 8 8 5 . 4 1 E. G . = 8 9 4 . 4 IN V . = 8 8 2 . 3 7 E. G . = 8 9 4 . 7 IN V . = 8 7 9 . 5 8 E. G . = 8 9 4 . 2 IN V . = 8 7 9 . 8 2 E. G . = 8 9 4 . 3 IN V . = 8 8 0 . 8 9 E. G . = 8 9 4 . 0 IN V . = 8 8 1 . 6 9 E. G . = 8 9 4 . 4 IN V . = 8 8 2 . 4 0 G G G G G G G G G G G F/O F/O F/O F/O F/O F/O F/O F/O F/O F/ O F / O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/ O F / O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/ O F / O W W W W W W W W W W W W W W W W W W W W W W W G G G G G T T T T T T T T T T T T T G G A W W W W FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+ 0 0 28+00 29+00 30+ 0 0 31+00 32+00 CTV CTV CT V CTV CTV 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 5 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 3 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-03 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 1 8 + 5 0 T O S T A . 3 2 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 18+50 TO STA. 32+50 LINE "FM-1" STA. 18+50 TO STA. 32+50 LINE "FM-1" M A T C H L I N E M A T C H L I N E S E E S H E E T C - 0 2 S E E S H E E T C - 0 2 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 4 SE E S H E E T C - 0 4 NEW 20" FORCEMAIN EXISTING GRADE EX I S T I N G G A S M A I N 18" MIN. NEW 20" FORCEMAIN NEW 20" FORCEMAIN EXISTING GRADE 18" MIN. 235' C EX I S T I N G 1 2 " S T O R M S E W E R PA R K N O R T H W E S T E R N D R A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 2 " S T O R M S E W E R PA R K N O R T H W E S T E R N D R A I N EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 8 " S A N I T A R Y S E W E R EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G T E L E P H O N E L I N E EX I S T I N G G A S M A I N (2 ) E X I S T I N G T E L E P H O N E L I N E (3 ) E X I S T I N G F I B E R O P T I C L I N E S EX I S T I N G 3 6 " S T O R M S E W E R EX I S T I N G 3 6 " S T O R M S E W E R EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G 1 5 " S A N I T A R Y S E W E R EX I S T I N G 2 4 " S T O R M S E W E R EX I S T I N G 1 6 " W A T E R L I N E 150' B 29-13-07-000-001.001-018 GARRISON ENTERPRISES LLC 4715 W. 106TH STREET 29-13-06-000-030.202-018 NOTTINGHAM LLC 29-13-07-027-002.000-018 L A FITNESS INTERNATIONAL LLC 29-13-07-027-001.000-018 L A FITNESS INTERNATIONAL LLC 29-13-07-018-001.000-018 NATIONAL BANK OF INDIANAPOLIS 10590 N. MICHIGAN ROAD 29-13-07-012-001.000-018 ORANGE NEWPORT ASSOCIATES, ET AL 10595 N. MICHIGAN ROAD 29-13-06-000-030.002-018 PEARSON REALTY LLC 29-13-06-000-030.102-018 NOTTINGHAM LLC 29-13-06-000-029.001-018 106TH STREET LLC 29-13-06-012-001.000-018 R1 CS3 LLC W. 106TH STREET W. 106TH STREET N . M I C H I G A N R O A D ( U . S . 4 2 1 ) N . M I C H I G A N R O A D ( U . S . 4 2 1 ) 18" MIN. EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N STA. 21+50 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 21+64 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 26+25 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND STA. 27+40 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND AND 24"X20" R.J.D.I. REDUCER. STA. 29+79 LINE "FM-1" INSTALL 24"X20" REDUCER AND 20" R.J.D.I. 45° BEND. (ROLLED) STA. 30+03 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND (ROLLED) ST A . 2 1 + 5 0 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 2 1 + 6 4 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D 18" MIN. ST A . 2 6 + 2 5 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D ST A . 2 7 + 4 0 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D AN D 2 4 " X 2 0 " R . J . D . I . R E D U C E R . 18" MIN. 18" MIN. 18" MIN.18" MIN. 18" MIN. ST A . 2 9 + 7 9 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R AN D 2 0 " R . J . D . I . 4 5 ° B E N D ( R O L L E D ) ST A . 3 0 + 0 3 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D (R O L L E D ) 18" MIN.18" MIN. ST A . 2 4 + 2 5 L I N E " F M - 1 " IN S T A L L A R V - 1 A T H I G H P O I N T ST A . 2 3 + 1 4 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D ST A . 2 3 + 3 3 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D STA. 23+14 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND STA. 23+33 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND STA. 24+25 LINE "FM-1" INSTALL ARV-1 AT HIGH POINT EXISTING SANITARY SEWER EASEMENT EXISTING 15' UTILITY EASEMENT EXISTING ACCESS EASEMENT EXISTING SANITARY SEWER AND UTILITY EASEMENT EXISTING DRAINAGE AND UTILITY EASEMENT 6' 21+64 45° BEND 1709605.42 167568.90 22+00 FORCEMAIN 1709606.28 167604.67 23+14 22.5° BEND 1709608.99 167718.24 23+33 22.5° BEND 1709615.96 167736.74 24+00 FORCEMAIN 1709616.87 167803.37 24+25 ARV 1709617.20 167828.36 26+00 FORCEMAIN 1709619.57 168003.35 26+25 22.5° BEND 1709619.90 168027.89 27+40 22.5° BEND 1709583.07 168136.94 28+00 FORCEMAIN 1709585.22 168197.20 29+79 45° BEND 1709591.58 168375.68 30+00 FORCEMAIN 1709608.41 168388.90 30+03 45° BEND 1709610.80 168390.78 31+00 24"X20" REDUCER 1709615.95 168487.57 32+00 FORCEMAIN 1709619.47 168587.51 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING 20+00 FORCEMAIN 1709612.78 176408.32 21+50 45° BEND 1709614.46 167556.94 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING STA. 31+00 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL ST A . 3 1 + 0 0 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R BE G I N D I R E C T I O N A L D R I L L INSTALL GRANULAR BACKFILL INSTALL GRANULAR BACKFILL INSTALL GRANULAR BACKFILL AP P . P L AP P . P L A P P . P L APP. PL A P P . P L AP P . P L AP P . P L A P P . P L AP P . P L A P P . P L INSTALL 23 L.F. OF CONCRETE ROAD REPLACEMENT (METHOD "E") INSTALL 40 L.F. OF CONCRETE ROAD REPLACEMENT (METHOD "E") INSTALL 49 L.F. OF CONCRETE ROAD REPLACEMENT TEMPORARY SANITARY SEWER EASEMENT TEMPORARY SANITARY SEWER EASEMENT 235' OF 30" DIA. STEEL CASING BORE AND JACK 0.84% SLOPE 3.04% S L O P E INSTALL 54 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL 102 L.F. OF CONCRETE SIDEWALK REPLACEMENT (METHOD "B") 0.71% SLOPE INSTALL GRANULAR BACKFILL 0.24% SLOPE INV. 881.00 INV. 879.33 INV. 887.68 INSTALL 9 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") E. G . = 8 9 4 . 9 IN V . = 8 8 1 . 4 5 890' A 125' A REMOVE EXISTING TREE REMOVE EXISTING TREES 12" MIN12" MIN INV. 880.00 3.57% SLOPE NEW 20" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN NOTE: 1.ALL WORK ON NATIONAL BANK OF INDIANAPOLIS PROPERTY/ TEMPORARY SANITARY SEWER EASEMENT SHALL BE COMPLETE, INCLUDING FINAL RESTORATION, BY THE ORIGINAL DATE OF FINAL COMPLETION PROVIDED IN THE BID DOCUMENTS (STA. 26+50±, LINE "FM-1" TO STA. 27+30± LINE "FM-1", SEE SPEC 01125). SB-03 SB-04 EX I S T I N G C A B L E T V L I N E EX I S T I N G C A B L E T V L I N E EX I S T I N G C A B L E T V L I N E EX I S T I N G C A B L E T V L I N E NOTE: 1.ALONG FORCEMAIN LINE "FM-1" FROM APPROX. STA.16+00 TO APPROX. STA. 27+40, CONTRACTOR SHALL COORDINATE WORK WITH COMCAST (MIN. 48 HOUR NOTICE), SUPPORT "CTV" UTILITY DURING CONSTRUCTION, AND RELOCATE TO SIDE OF FORCEMAIN TRENCH AS NECESSARY TO INSTALL FORCEMAIN LINE "FM-1". WORK ASSOCIATED WITH "CTV" UTILITY SUPPORT AND RELOCATION SHALL NOT BE A SEPARATE PAY ITEM AND SHALL BE CONSIDERED INCIDENTAL TO THE FORCEMAIN LINE "FM-1" INSTALLATION. IS S U E D F O R C O N S T R U C T I O N E. G . = 8 9 5 . 8 IN V . = 8 8 3 . 1 1 E. G . = 8 9 6 . 4 IN V . = 8 8 3 . 8 2 E. G . = 8 9 6 . 9 IN V . = 8 8 4 . 5 2 E. G . = 8 9 6 . 3 IN V . = 8 8 5 . 2 3 E. G . = 8 9 5 . 9 IN V . = 8 8 5 . 9 4 E. G . = 8 9 5 . 2 IN V . = 8 8 6 . 6 5 E. G . = 8 9 5 . 5 IN V . = 8 8 6 . 2 4 E. G . = 8 9 5 . 2 IN V . = 8 8 5 . 7 5 E. G . = 8 9 5 . 3 IN V . = 8 8 5 . 2 6 E. G . = 8 9 6 . 1 IN V . = 8 8 4 . 7 7 E. G . = 8 9 6 . 1 IN V . = 8 8 4 . 2 8 E. G . = 8 9 5 . 4 IN V . = 8 8 3 . 7 9 E. G . = 8 9 4 . 5 IN V . = 8 8 3 . 3 0 E. G . = 8 9 4 . 0 IN V . = 8 8 2 . 8 0 E. G . = 8 9 2 . 6 IN V . = 8 8 2 . 3 1 G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WGGG T T T T T T T T T T T T T W AFMFMFMFMFMFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00CTVCTVCTVCTV 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 6 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 4 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-04 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 3 2 + 5 0 T O S T A . 4 7 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 32+50 TO STA. 47+50 LINE "FM-1" STA. 32+50 TO STA. 47+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 3 SE E S H E E T C - 0 3 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 5 SE E S H E E T C - 0 5 NEW 24" FORCEMAIN EXISTING GRADE EX I S T I N G G A S M A I N 18" MIN. EX I S T I N G 8 " W A T E R L I N E 369' B473' B NEW 20" FORCEMAIN NEW 20" FORCEMAIN EX I S T I N G T E L E P H O N E L I N E 12" EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 6 " W A T E R L I N E EX I S T I N G 3 0 " G A S M A I N EX I S T I N G 3 0 " G A S M A I N EXISTING GRADE 29-13-07-012-002.000-018 LAWNDALE PLAZA LLC & 4128 CHESTER AVENUE L.P. 4335 W. 106TH STREET 29-13-06-000-028.000-018 WESTON SHOPPES LLP 29-13-07-014-001.001-018 AMERIANA BANK SB 29-13-07-014-002.000-018 3965 PROPERTY GROUP LLC 3965 W. 106TH STREET 29-13-07-000-016.001-018 TEETER, JEFFREY JAY & JANE ELLEN TEETER 4281 W. 106TH STREET 29-13-06-003-047.000-018 ARMER, POLLY A. & NICOLE FENWICK 10688 MORRISTOWN CT. 29-13-06-003-048.000-018 FINE, LOIS A. 10680 MORRISTOWN CT. 29-13-06-003-049.000-018 BROOKS, GARRETT & HANNAH 10681 MORRISTOWN CT. 29-13-06-002-068.000-018 WESTON PLACE HOMEOWNERS ASSOC. INC. W. 106TH STREET W. 106TH STREET CO M M E R C E D R I V E WE S T O N D R I V E WE S T O N D R I V E 24" MIN.24" MIN. 18" MIN. EX I S T I N G 1 4 " H D P E F O R C E M A I N 12" STA. 37+23 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER AND 20" R.J.D.I. 45° BEND. END DIRECTIONAL DRILL STA. 37+50 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 40+53 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND AND 24"X20" R.J.D.I. REDUCER. BEGIN DIRECTIONAL DRILL ST A . 3 7 + 2 3 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R AN D 2 0 " R . J . D . I . 4 5 ° B E N D . EN D D I R E C T I O N A L D R I L L ST A . 3 7 + 5 0 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 4 0 + 5 3 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D AN D 2 4 " X 2 0 " R . J . D . I . RE D U C E R . BE G I N D I R E C T I O N A L D R I L L STA. 38+07 LINE "FM-1" INSTALL ARV-2 AT HIGH POINT ST A . 3 8 + 0 7 L I N E " F M - 1 " IN S T A L L A R V - 2 A T H I G H P O I N T CR O O K E D C R E E K D R A I N EXISTING SANITARY SEWER EASEMENT EXISTING 15' DRAINAGE AND UTILITY EASEMENT EXISTING 15' DRAINAGE AND UTILITY EASEMENT EXISTING 20' UTILITY EASEMENT EXISTING 30' UTILITY EASEMENT EXISTING 35' SANITARY SEWER EASEMENT EXISTING 15' UTILITY EASEMENT EXISTING SANITARY SEWER EASEMENT 34+00 FORCEMAIN 1709623.22 168787.47 36+00 FORCEMAIN 1709626.96 168987.44 37+23 45° BEND 1709629.27 169110.73 37+50 45° BEND 1709612.86 169132.21 38+00 FORCEMAIN 1709613.71 169181.86 38+07 ARV 1709613.82 169188.41 40+00 FORCEMAIN 1709618.44 169381.80 40+53 45° BEND 1709618.94 169453.08 42+00 FORCEMAIN 1709661.25 169575.56 44+00 FORCEMAIN 1709684.78 169773.68 44+22 24"X20" REDUCER 1709685.91 169795.19 46+00 FORCEMAIN 1709687.86 169973.62 47+00 24"X20" REDUCER 1709688.96 170073.62 47+50 24"X20" REDUCER 1709688.77 170123.79 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING EXISTING 25' UTILITY EASEMENT STA. 44+22 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER END DIRECTIONAL DRILL ST A . 4 4 + 2 2 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R EN D D I R E C T I O N A L D R I L L C C R O O K E D C R E E K D R A I N L EXISTING GAS PIPELINE EASEMENT EXISTING GAS PIPELINE EASEMENT 7' A P P . P L A P P . P L AP P . P L A P P . P L AP P . P L AP P . P L AP P . P L AP P . P L A P P . P L 5' MIN. 0.71% SLOPE 0.49% SLOPEINV. 886.70 330' A 278' A STA. 47+00 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL STA. 47+50 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER END DIRECTIONAL DRILL 50' B NOTE: PANHANDLE EASTERN TO BE CONTACTED PRIOR TO CROSSING LPG GAS MAINS AT APPROX. STATIONS 44+60 AND 45+50 ST A . 4 7 + 0 0 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R BE G I N D I R E C T I O N A L D R I L L ST A . 4 7 + 5 0 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R EN D D I R E C T I O N A L D R I L L NEW 20" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN NEW 20" FORCEMAIN NEW 24" FORCEMAIN SB-05 SB-06 IS S U E D F O R C O N S T R U C T I O N E. G . = 8 9 3 . 0 IN V . = 8 8 1 . 8 2 E. G . = 8 9 3 . 7 IN V . = 8 8 1 . 3 3 E. G . = 8 9 5 . 2 IN V . = 8 8 0 . 7 4 E. G . = 8 9 4 . 9 IN V . = 8 8 0 . 0 5 E. G . = 8 9 5 . 2 IN V . = 8 8 0 . 2 0 E. G . = 8 9 5 . 5 IN V . = 8 8 0 . 5 6 E. G . = 8 9 5 . 4 IN V . = 8 8 0 . 9 2 E. G . = 8 9 4 . 5 IN V . = 8 8 1 . 2 9 E. G . = 8 9 4 . 5 IN V . = 8 8 1 . 6 5 E. G . = 8 9 4 . 1 IN V . = 8 8 2 . 6 6 E. G . = 8 9 5 . 3 IN V . = 8 8 4 . 5 1 E. G . = 8 9 6 . 9 IN V . = 8 8 6 . 3 6 E. G . = 8 9 7 . 5 IN V . = 8 8 8 . 2 0 E. G . = 8 9 8 . 1 IN V . = 8 9 0 . 0 5 E. G . = 9 0 0 . 0 IN V . = 8 9 1 . 9 0 G G G G G G G G G G G G G G G W W W W W W WWWWWWW W W W W W W W W W W W W W W W W W A FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 48+00 49+ 0 0 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57 + 0 0 58+00 59+00 60+00 61+00 62+00 63+ 0 0 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 8 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 5 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-05 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 4 7 + 5 0 T O S T A . 6 2 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 47+50 TO STA. 62+50 LINE "FM-1" STA. 47+50 TO STA. 62+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 4 SE E S H E E T C - 0 4 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 6 SE E S H E E T C - 0 6 NEW 20" FORCEMAIN EXISTING GRADE EX I S T I N G G A S M A I N NEW 20" FORCEMAIN 24" MIN. EX I S T I N G 1 2 " P V C F O R C E M A I N EX I S T I N G 1 6 " W A T E R M A I N EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G 3 6 " G A S M A I N EX I S T I N G G A S M A I N EX I S T I N G 1 5 " S T O R M S E W E R EX I S T I N G 8 " G A S M A I N EX I S T I N G 1 2 " G A S M A I N EX I S T I N G 2 4 " G A S M A I N 18" MIN.NEW 20" FORCEMAIN EXISTING GRADE NEW 20" FORCEMAIN 29-13-07-000-017.000-018 MORETTO, NANCY C. 3751 W. 106TH STREET 29-13-06-002-068.000-018 WESTON PLACE HOMEOWNERS ASSOC. INC. 29-13-07-000-016.001-018 TEETER, JEFFREY JAY & JANE ELLEN TEETER 4281 W. 106TH STREET 29-13-07-000-018.000-018 NIEHAUS, MARILYN L. 3731 W. 106TH STREET 29-13-07-000-019.001-018 MERRILL, JANE B. 3729 W. 106TH STREET 29-13-07-000-019.000-018 MERRILL, JANE B. 3729 W. 106TH STREET 29-13-07-000-020.000-018 RILEY, THOMAS W. & BONNIE G. 3675 W. 106TH STREET 29-13-06-000-027.000-018 DUNWOODY, EVELYN N. 3740 W. 106TH STREET 29-13-06-405-001.000-018 PILGRIM LUTHERAN CHURCH OF INDIANAPOLIS INC. 3650 W. 106TH STREET W. 106TH STREET W. 106TH STREET 18" MIN. 24" MIN. 24" MIN. 18" MIN. EX I S T I N G 1 2 " P V C F O R C E M A I N 18" MIN.18" MIN. 24" MIN. 24" MIN. STA. 57+06 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 56+84 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER AND 20" R.J.D.I. 45° BEND END DIRECTIONAL DRILL STA. 49+47 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 48+80 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND ST A . 4 9 + 4 7 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 4 8 + 8 0 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 5 7 + 0 6 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 5 6 + 8 4 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R AN D 2 0 " R . J . D . I . 4 5 ° B E N D EN D D I R E C T I O N A L D R I L L CR O O K E D C R E E K D R A I N C R O O K E D C R E E K D R A I N CR O O K E D C R E E K D R A I N C C R O O K E D C R E E K D R A I N L EXISTING SANITARY SEWER EASEMENT 48+00 FORCEMAIN 1709687.62 170173.60 48+80 45° BEND 1709685.80 170253.11 49+47 45° BEND 1709733.72 170301.03 50+00 FORCEMAIN 1709733.00 170353.72 52+00 FORCEMAIN 1709727.79 170553.65 53+15 24"X20" REDUCER 1709723.95 170668.57 54+00 FORCEMAIN 1709721.11 170753.54 55+65 FORCEMAIN 1709722.80 170918.18 56+00 FORCEMAIN 1709733.91 170951.69 56+84 45° BEND 1709760.36 171031.43 57+06 45° BEND 1709749.06 171050.29 58+00 FORCEMAIN 1709749.23 171144.29 60+00 FORCEMAIN 1709749.52 171344.28 62+00 FORCEMAIN 1709740.52 171544.08 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING EXISTING 20" UTILITY EASEMENT EXISTING GAS PIPELINE EASEMENT EXISTING GAS PIPELINE EASEMENT 5' MIN. INSTALL GRANULAR BACKFILL INSTALL 56 L.F. OF ASPHALT DRIVE REPLACEMENT (METHOD "C") AP P . P L AP P . P LAP P . P L AP P . P LAP P . P L AP P . P L PROPOSED SANITARY SEWER EASEMENT PROPOSED SANITARY SEWER EASEMENT INSTALL 5 L.F. OF CONCRETE SIDEWALK REPLACEMENT (METHOD "B") INSTALL GRANULAR BACKFILL INSTALL 5 L.F. OF CONCRETE SIDEWALK REPLACEMENT (METHOD "B") INV. 881.85 INV. 879.91 0.39% SLOPE0.69% SLOPE 1.82% SLOP E INSTALL 5 L.F. OF CONCRETE CURB REPLACEMENT INSTALL 5 L.F. OF CONCRETE CURB REPLACEMENT INV. 892.75 REMOVE EXISTING TREES AS REQUIRED FOR CONSTRUCTION THIS AREA (TYP. OF 6) INSTALL 20 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL GRANULAR BACKFILL 565' A STA. 53+15 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL 369' B 566' A NOTE: 1.BUCKEYE PIPELINE REQUIRES OPEN POTHOLE TO VIEW HORIZONTAL DIRECTIONAL DRILL UNDER THE LPG GAS MAINS AT APPROX. STATIONS 56+40 AND 56+50. BUCKEYE PIPELINE TO BE CONTACTED PRIOR TO HORIZONTAL DIRECTIONAL DRILL. 2.PANHANDLE EASTERN TO BE CONTACTED PRIOR TO CROSSING LPG GAS MAINS AT APPROX. STATIONS 50+90, 51+25, AND 51+60. 3.NO BORE PITS OR RECEIVING PITS ARE ALLOWED ON EVELYN N. DUNWOODY'S PROPERTY AT 3740 W. 106TH STREET. INV. 881.10 0.49% SLOPE ST A . 5 3 + 1 5 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R BE G I N D I R E C T I O N A L D R I L L NEW 24" FORCEMAIN NEW 24" FORCEMAIN IS S U E D F O R C O N S T R U C T I O N E. G . = 9 0 0 . 1 IN V . = 8 8 5 . 2 1 E. G . = 8 9 8 . 1 IN V . = 8 8 4 . 9 5 E. G . = 8 9 8 . 1 IN V . = 8 8 4 . 6 9 E. G . = 8 9 7 . 8 IN V . = 8 8 4 . 4 3 E. G . = 8 9 7 . 7 IN V . = 8 8 4 . 1 8 E. G . = 8 9 7 . 2 IN V . = 8 8 3 . 9 2 E. G . = 8 9 9 . 8 IN V . = 8 8 3 . 6 6 E. G . = 8 9 6 . 5 IN V . = 8 8 3 . 4 0 E. G . = 8 9 5 . 2 IN V . = 8 8 3 . 1 4 E. G . = 8 9 5 . 7 IN V . = 8 8 2 . 9 5 E. G . = 8 9 6 . 1 IN V . = 8 8 2 . 8 3 E. G . = 8 9 6 . 9 IN V . = 8 8 2 . 7 1 E. G . = 8 9 7 . 9 IN V . = 8 8 2 . 5 9 E. G . = 8 9 6 . 9 IN V . = 8 8 2 . 4 7 E. G . = 8 9 5 . 9 IN V . = 8 8 2 . 3 6 G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W F/OF/OF/O T T T T T T T T T T T T A FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 63+ 0 0 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 G 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 4 9 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 6 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-06 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 6 2 + 5 0 T O S T A . 7 7 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 62+50 TO STA. 77+50 LINE "FM-1" STA. 62+50 TO STA. 77+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 5 SE E S H E E T C - 0 5 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 7 SE E S H E E T C - 0 7 NEW 24" FORCEMAIN EXISTING GRADE EX I S T I N G G A S M A I N NEW 24" FORCEMAIN 18" MIN. EX I S T I N G 2 4 " S T O R M S E W E R CR O O K E D C R E E K D R A I N 1,477' B NEW 24" FORCEMAIN EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G 1 6 " W A T E R M A I N EX I S T I N G 3 6 " S T O R M S E W E R CR O O K E D C R E E K D R A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G G A S M A I N EX I S T I N G 1 2 " S T O R M S E W E R SH E L B O U R N E G R E E N E D R A I N EX I S T I N G 1 2 " S T O R M S E W E R CR O O K E D C R E E K D R A I N EX I S T I N G G A S M A I N 18" MIN. 29-13-07-000-020.000-018 RILEY, THOMAS W. & BONNIE G. 3675 W. 106TH STREET 29-13-06-405-001.000-018 PILGRIM LUTHERAN CHURCH OF INDIANAPOLIS INC. 3650 W. 106TH STREET 29-13-07-000-023.000-018 JENISON, STEPHEN H. & SANDRA K. 29-13-07-000-022.000-018 TURKLE, JANET K. & MICHAEL B. COPPINGE 3665 W. 106TH STREET 29-13-08-106-007.000-018 PATEL, UDAYAN C. & DAKSHA U. 3599 HOUNDS CROSSING 29-13-08-106-006.000-018 DILLARD, MARK & LINDA RAMBO DILLARD 3598 HOUNDS CROSSING 29-13-08-106-005.000-018 TRINK, TAN VIET & VAN HOANG LE PHAM 3596 HOUNDS CROSSING 29-13-08-106-001.000-018 CONNER, WADE T. REV TRUST 10598 HUNTERSFIELD DRIVE 29-13-06-405-001.003-018 CLAY TOWNSHIP OF HAMILTON COUNTY INDIANA 3610 W. 106TH STREET 29-13-06-405-001.003-018 GREEK ORTHODOX CHURCH HOLY TRINITY INC. 3500 W. 106TH STREET 29-13-08-106-058.000-018 LOGAN, DAVID K. 10599 HOUNDS CROSSING W. 106TH STREET W. 106TH STREET SH E L B O R N E R O A D SH E L B O R N E R O A D HU N T E R S F I E L D D R I V E 18" MIN. 18" MIN. 24" MIN. 18" MIN.18" MIN.24" MIN. EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 5 " S A N I T A R Y S E W E R EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N STA. 62+73 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND AND 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL ST A . 6 2 + 5 2 L I N E " F M - 1 " IN S T A L L A R V - 3 A T H I G H P O I N T EXISTING SANITARY SEWER EASEMENT EXISTING SEWER EASEMENT EXISTING SEWER EASEMENT EXISTING 5' DRAINAGE AND UTILITY EASEMENT EXISTING 5' DRAINAGE AND UTILITY EASEMENT 62+52 ARV 1709738.17 171596.24 62+56 45° BEND 1709737.99 171600.24 62+66 45° BEND 1709737.52 171610.63 62+73 22.5° BEND 1709737.22 171617.22 64+00 FORCEMAIN 1709686.91 171733.44 66+00 FORCEMAIN 1709651.69 171929.63 68+00 FORCEMAIN 1709652.01 172129.62 70+00 FORCEMAIN 1709638.36 172329.00 72+00 FORCEMAIN 1709648.12 172528.51 74+00 FORCEMAIN 1709660.26 172728.00 76+00 FORCEMAIN 1709665.13 172927.94 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING EXISTING SANITARY SEWER EASEMENT EXISTING 20' SEWER AND UTILITY EASEMENT EXISTING 20' DRAINAGE AND UTILITY EASEMENT 18" MIN. STA. 62+52 LINE "FM-1" INSTALL ARV-3 AT HIGH POINT STA. 62+66 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND (VERT.) STA. 62+56 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND (VERT.) ST A . 6 2 + 7 3 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D AN D 2 4 " X 2 0 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L ST A . 6 2 + 6 6 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ( V E R T . ) ST A . 6 2 + 5 6 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ( V E R T . ) EX I S T I N G G A S M A I N EX I S T I N G G A S M A I N 24" MIN. EXISTING TREE (DO NOT DISTURB) AP P . P L A P P . P L AP P . P L A P P . P L AP P . P L AP P . P L 0.26% SLOPE INV. 883.00 INV. 885.27 0.12% SLOPE INV. 892.64 72% SLOPE 23' A 12" MIN.12" MIN. NEW 24" FORCEMAIN NEW 20" FORCEMAIN SB-07 SB-08 IS S U E D F O R C O N S T R U C T I O N E. G . = 8 9 5 . 3 IN V . = 8 8 2 . 2 4 E. G . = 8 9 5 . 0 IN V . = 8 8 2 . 1 2 E. G . = 8 9 4 . 0 IN V . = 8 8 2 . 0 0 E. G . = 8 9 3 . 6 IN V . = 8 8 1 . 8 9 E. G . = 8 9 3 . 0 IN V . = 8 8 1 . 7 7 E. G . = 8 9 3 . 0 IN V . = 8 8 1 . 6 5 E. G . = 8 9 4 . 0 IN V . = 8 8 1 . 5 3 E. G . = 8 9 5 . 4 IN V . = 8 8 1 . 4 1 E. G . = 8 9 5 . 6 IN V . = 8 8 1 . 3 0 E. G . = 8 9 6 . 4 IN V . = 8 8 1 . 1 8 E. G . = 8 9 5 . 8 IN V . = 8 8 1 . 0 6 E. G . = 8 9 4 . 6 IN V . = 8 8 0 . 9 4 E. G . = 8 9 3 . 9 IN V . = 8 8 0 . 9 0 E. G . = 8 9 3 . 8 IN V . = 8 8 1 . 3 4 E. G . = 8 9 2 . 2 IN V . = 8 8 1 . 7 8 O E O E O E O E O E O E O E O E O E O E OE OE OE O E O E OE O E O E O E OE OE OE O E OE O E O E O E OEOE O E O E OE O E OE OE O E O E O E OE O E OE O E OE O E OE O E OE O E O E OE O E O E O E O E O E OE O E O E OE O E O E O E O E O E OE O E OE O E O E O E OE O E O E OE W W W W W W W W W W W W W W W W W WE E E E G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T TTTTT W W FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 W W T G W S S S G S W W W W W 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 0 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 7 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-07 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 7 7 + 5 0 T O S T A . 9 2 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 77+50 TO STA. 92+50 LINE "FM-1" STA. 77+50 TO STA. 92+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 6 SE E S H E E T C - 0 6 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 8 SE E S H E E T C - 0 8 NEW 20" FORCEMAIN EXISTING GRADE NEW 20" FORCEMAIN 55' B EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N NEW 24" FORCEMAIN EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G 1 2 " S T O R M S E W E R SH E L B O U R N E G R E E N E D R A I N EX I S T I N G T E L E P H O N E L I N E EX I S T I N G G A S M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 8 " W A T E R M A I N EX I S T I N G 1 2 " S A N I T A R Y S E W E R EX I S T I N G G A S M A I N 850' B NEW 24" FORCEMAIN EXISTING GRADE 18" MIN. 12" MIN. 29-13-08-106-058.000-018 LOGAN, DAVID K. 10599 HUNTERSFIELD DRIVE 29-13-05-000-016.002-018 GREEK ORTHODOX CHURCH HOLY TRINITY INC. 3500 W. 106TH STREET 29-13-08-106-055.000-018 WILSON, CALVIN D. 3792 BARNSTABLE ROAD 29-13-08-106-054.000-018 COREY, NOBLE R. & CONSTANCE RENEE COREY NASS 3794 BARNSTABLE ROAD 29-13-08-106-053.000-018 SARKAR, SOURISH & INDRANI 3795 BARNSTABLE ROAD 29-13-08-101-001.000-018 ANTONI JEVIC, RADOJE 10538 CONNAUGHT DRIVE 29-13-08-102-001.000-018 SCHULTZ, RAYMOND J. & LINDA P. 3321 W. 106TH STREET 29-13-08-102-002.000-018 ROBINSON, CLARENCE E. 3313 W. 106TH STREET 29-13-08-102-003.000-018 TOY, MELANIE 3305 W. 106TH STREET 29-13-05-000-016.001-018 CACUUI, GIULIANO & BRENDA M. 3300 W. 106TH STREET 29-13-05-003-017.000-018 TALWAR, RAVI R. & ELEANOR 10608 WALNUT CREEK DRIVE 29-13-05-003-016.000-018 TURNER, WILLIAM T. & EMILY L. 10609 WALNUT CREEK DRIVE W. 106TH STREET W. 106TH STREET W A L N U T C R E E K D R I V E FE R G U S A V E N U E CO N N A U G H T D R I V E 18" MIN.18" MIN.18" MIN. 29-13-08-103-001.000-018 TAYLOR, NICHOLAS J. & TRACY M. 3265 W. 106TH STREET 29-13-08-103-002.000-018 BOWMAN, WILLIAM DAVID 3263 W. 106TH STREET STA. 78+05 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER AND 20" R.J.D.I. 45° BEND END DIRECTIONAL DRILL STA. 78+30 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND ST A . 7 8 + 0 5 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R AN D 2 0 " R . J . D . I . 4 5 ° B E N D EN D D I R E C T I O N A L D R I L L ST A . 7 8 + 3 0 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D EXISTING 5' UTILITY AND DRAINAGE EASEMENT EXISTING 5' UTILITY AND DRAINAGE EASEMENT EXISTING 7.5' UTILITY EASEMENT EXISTING SEWER EASEMENT EXISTING SEWER EASEMENT EXISTING SEWER EASEMENT EXISTING SANITARY EASEMENT EXISTING SEWER EASEMENT EXISTING 10' UTILITY AND DRAINAGE EASEMENT EXISTING SEWER EASEMENT EXISTING SEWER EASEMENT 78+00 FORCEMAIN 1709669.82 173127.88 78+05 45° BEND 1709669.95 173133.34 78+30 45° BEND 1709653.92 173151.39 80+00 FORCEMAIN 1709655.83 173321.77 82+00 FORCEMAIN 1709658.07 173521.76 84+00 24"X20" REDUCER 1709662.43 173721.68 86+00 FORCEMAIN 1709662.83 173921.68 88+00 FORCEMAIN 1709668.10 174121.59 90+00 FORCEMAIN 1709672.98 174321.51 92+00 FORCEMAIN 1709675.07 174721.50 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING STA. 84+00 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL ST A . 8 4 + 0 0 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L AP P . P L AP P . P L AP P . P L AP P . P L AP P . P L AP P . P L APP . P L A P P . P L AP P . P L 0.12% SLOPE INSTALL GRANULAR BACKFILL EX I S T I N G 6 " S E R V I C E L A T E R A L EX I S T I N G 6 " S E R V I C E L A T E R A L EX I S T I N G 6 " S E R V I C E L A T E R A L 18" MIN. 18" MIN.18" MIN. INSTALL 465 L.F.OF CONCRETE SIDEWALK REPLACEMENT (METHOD "B") 595' A INV. 880.84 0.42% SLOPE EX I S T I N G 8 " W A T E R M A I N (C O N T R A C T O R S H A L L V E R I F Y LO C A T I O N A N D D E P T H ) EXISTING 8" WATER MAIN (CONTRACTOR SHALL VERIFY LOCATION AND DEPTH) NEW 24" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN SB-09 IS S U E D F O R C O N S T R U C T I O N E. G . = 8 9 1 . 6 IN V . = 8 8 2 . 2 2 E. G . = 8 9 0 . 2 IN V . = 8 8 2 . 6 5 E. G . = 8 9 1 . 7 IN V . = 8 8 3 . 0 9 E. G . = 8 9 1 . 1 IN V . = 8 8 3 . 5 3 E. G . = 8 9 1 . 9 IN V . = 8 8 3 . 9 7 E. G . = 8 9 1 . 4 IN V . = 8 8 3 . 4 1 E. G . = 8 9 1 . 2 IN V . = 8 8 2 . 7 7 E. G . = 8 8 9 . 8 IN V . = 8 8 2 . 1 4 E. G . = 8 8 8 . 7 IN V . = 8 8 1 . 5 0 E. G . = 8 8 7 . 1 IN V . = 8 8 0 . 1 9 E. G . = 8 8 6 . 4 IN V . = 8 7 8 . 4 1 E. G . = 8 8 5 . 4 IN V . = 8 7 6 . 6 3 E. G . = 8 8 4 . 3 IN V . = 8 7 5 . 9 8 E. G . = 8 8 4 . 6 IN V . = 8 7 5 . 8 7 E. G . = 8 8 5 . 5 IN V . = 8 7 5 . 7 7 W W G G G G G W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W E E E E E E T T T T T T T T T TTTTT T T T T T T T T T T T T T T W W W W AFMFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 93+00 94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 G G G S 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 1 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 8 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-08 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 9 2 + 5 0 T O S T A . 1 0 7 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 92+50 TO STA. 107+50 LINE "FM-1" STA. 92+50 TO STA. 107+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 7 SE E S H E E T C - 0 7 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 9 SE E S H E E T C - 0 9 NEW 24" FORCEMAIN EXISTING GRADE NEW 24" FORCEMAIN 437' B EX I S T I N G 1 4 " H D P E FO R C E M A I N EX I S T I N G 8 " W A T E R M A I N NEW 20" FORCEMAIN EX I S T I N G G A S M A I N NEW 20" FORCEMAIN EXISTING GRADE 12" MIN. 24" 29-13-08-006-031.000-018 WINDSOR GROVE II HOMEOWNERS ASSOC. INC. 29-13-05-003-016.000-018 TURNER, WILLIAM T. & EMILY L. 10609 WALNUT CREEK DRIVE 29-13-05-000-016.101-018 WHITE, SHARON L. & STEPHEN L. CO-TRUSTEES 3110 W. 106TH STREET 29-13-05-009-024.000-018 SHEN, ZHONGMIN & SUPING HE 10610 JEWEL LANE 29-13-05-009-025.000-018 EWBANK, ANN S. 10611 JEWEL LANE 29-13-05-009-001.000-018 KINGSMILL HOMEOWNERS ASSOC. INC. 29-13-05-009-005.000-018 ZUCKERBURG, MARK S. 2977 PALACE CT. 29-13-05-009-006.000-018 DUGAN, KELLI TRUSTEE 2975 PALACE CT. 29-13-08-104-001.000-018 HILDEBRANDT, LOREE A. 3111 W. 106TH STREET 29-13-08-006-032.000-018 WINDSOR GROVE II HOMEOWNERS ASSOC. INC. 29-13-08-004-036.000-018 WINDSOR GROVE II HOMEOWNERS ASSOC. INC. W. 106TH STREET W. 106TH STREET GR E E N T R E E D R I V E IR O N H O R S E L A N E KI N G S M I L L D R I V E 29-13-08-103-003.000-018 HURST, GERALD J. & MARY ELLEN 3245 W. 106TH STREET STA. 97+07 LINE "FM-1" INSTALL ARV-4 AT HIGH POINT ST A . 9 7 + 0 7 L I N E " F M - 1 " IN S T A L L A R V - 4 A T H I G H P O I N T 6' EXISTING SEWER EASEMENT EXISTING 30' UTILITY AND DRAINAGE EASEMENT EXISTING SEWER EASEMENT EXISTING 7.5' UTILITY EASEMENT EXISTING 10' UTILITY AND DRAINAGE EASEMENT EXISTING 7.5' UTILITY AND DRAINAGE EASEMENT EXISTING 10' UTILITY AND DRAINAGE EASEMENT EXISTING 10' UTILITY AND DRAINAGE EASEMENT EXISTING 10' UTILITY AND DRAINAGE EASEMENT EXISTING 15' UTILITY AND DRAINAGE EASEMENT 94+00 FORCEMAIN 1709674.00 174721.48 96+00 FORCEMAIN 1709682.93 174921.17 96+87 24"X20" REDUCER 1709688.82 175007.65 97+07 ARV 1709689.29 175027.64 98+00 FORCEMAIN 1709691.52 175120.88 100+00 FORCEMAIN 1709696.30 175320.83 102+00 FORCEMAIN 1709697.97 175520.81 104+00 FORCEMAIN 1709700.63 175720.79 106+00 FORCEMAIN 1709704.76 175920.75 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING EXISTING 10' UTILITY AND DRAINAGE EASEMENT EXISTING UTILITY, DRAINAGE, AND SANITARY EASEMENT (ENTIRE PARCEL) EXISTING UTILITY AND DRAINAGE EASEMENT (ENTIRE PARCEL) STA. 96+87 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER END DIRECTIONAL DRILL EX I S T I N G G A S M A I N 24" MIN. ST A . 9 6 + 8 7 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R EN D D I R E C T I O N A L D R I L L EXISTING UTILITY AND DRAINAGE EASEMENT (ENTIRE PARCEL) AP P . P L AP P . P L APP . P L A P P . P L A P P . P L APP . P L AP P . P L AP P . P L AP P . P L AP P . P L APP. PL AP P . P L INSTALL 98 L.F. OF ASPHALT ROAD REPLACEMENT (METHOD "D") INSTALL FLOWABLE BACKFILL FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING INV. 884.00 0.42% SLOPE INV. 881.24 0.64% SLOPE 1.78% SL O P E INV. 876.05 0.11% SLOPE 5' MIN. INSTALL 4 L.F. OF CONCRETE CURB REPLACEMENT INSTALL 4 L.F. OF CONCRETE CURB REPLACEMENT INSTALL GRANULAR BACKFILL INSTALL 34 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") EX I S T I N G 6 " S E R V I C E L A T E R A L 1,063' A 12" MIN. NEW 20" FORCEMAIN SB-10 IS S U E D F O R C O N S T R U C T I O N E. G . = 8 8 5 . 8 IN V . = 8 7 5 . 6 6 E. G . = 8 8 6 . 7 IN V . = 8 7 5 . 5 5 E. G . = 8 8 6 . 7 IN V . = 8 7 5 . 4 4 E. G . = 8 8 7 . 0 IN V . = 8 7 5 . 3 4 E. G . = 8 8 7 . 0 IN V . = 8 7 5 . 2 3 E. G . = 8 8 6 . 9 IN V . = 8 7 5 . 0 0 E. G . = 8 8 5 . 9 IN V . = 8 7 4 . 3 6 E. G . = 8 8 3 . 9 IN V . = 8 7 3 . 7 1 E. G . = 8 8 1 . 8 IN V . = 8 7 3 . 0 7 E. G . = 8 8 0 . 6 IN V . = 8 7 2 . 4 2 E. G . = 8 7 9 . 6 IN V . = 8 7 1 . 7 8 E. G . = 8 7 9 . 2 IN V . = 8 7 1 . 1 3 E. G . = 8 7 9 . 4 IN V . = 8 6 8 . 6 8 E. G . = 8 7 9 . 3 IN V . = 8 6 7 . 4 7 E. G . = 8 7 7 . 9 IN V . = 8 6 6 . 3 0 W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T FM FM FM FM FM FM FM FM FM FM FM FM FMFMFMFMFMFMFMFMFMFMFMFMFMFM107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+0 0 120+00 121+00 122+00 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 3 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 0 9 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-09 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 1 0 7 + 5 0 T O S T A . 1 2 2 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 107+50 TO STA. 122+50 LINE "FM-1" STA. 107+50 TO STA. 122+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 8 SE E S H E E T C - 0 8 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 1 0 SE E S H E E T C - 1 0 NEW 20" FORCEMAIN EXISTING GRADE NEW 20" FORCEMAIN 18" EX I S T I N G G A S M A I N EX I S T I N G 8 " W A T E R M A I N NEW 20" FORCEMAIN EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 1 5 " S T O R M S E W E R 18" NEW 20" FORCEMAIN EXISTING GRADE 29-13-08-004-001.000-018 SANDERS, GEORGE S. & DANA E. 10592 TITAN RUN 29-13-05-009-006.000-018 DUGAN, KELLI TRUSTEE 2975 PALACE CT. 29-13-05-009-007.000-018 LEATHERWOOD, DANNY L. & DARTHA D. 2973 PALACE CT. 29-13-05-000-014.001-018 RILEY FAMILY FARMS LLC 29-13-05-000-014.000-018 RILEY FAMILY FARMS LLC 29-13-08-004-037.000-018 WINDSOR GROVE HOMEOWNERS ASSOC. INC. 29-13-08-004-036.000-018 WINDSOR GROVE HOMEOWNERS ASSOC. INC. 29-13-08-004-037.000-018 WINDSOR GROVE HOMEOWNERS ASSOC. INC. W. 106TH STREET W. 106TH STREET LO N D O N B E R R Y B L V D . 24" MIN. 18" MIN. 18" EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N STA. 112+52 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 112+78 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 120+46 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND ST A . 1 1 2 + 5 2 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 1 1 2 + 7 8 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 1 2 0 + 4 6 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D EXISTING 10' UTILITY AND DRAINAGE EASEMENT EXISTING 30' UTILITY AND DRAINAGE EASEMENT 108+00 FORCEMAIN 1709702.23 176120.52 110+00 FORCEMAIN 1709706.09 176320.48 112+00 FORCEMAIN 1709711.61 176520.67 112+52 45° BEND 1709713.06 176572.81 112+78 45° BEND 1709728.85 176593.15 114+00 FORCEMAIN 1709729.15 176715.24 116+00 FORCEMAIN 1709729.63 176915.24 118+00 FORCEMAIN 1709741.03 177114.43 118+93 22.5° BEND 1709741.61 177207.72 120+00 FORCEMAIN 1709715.94 177311.28 120+46 22.5° BEND 1709704.98 177355.49 122+00 FORCEMAIN 1709709.76 177509.84 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING STA. 118+93 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND ST A . 1 1 8 + 9 3 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D INSTALL FLOWABLE BACKFILL INSTALL 102 L.F. OF ASPHALT ROAD REPLACEMENT (METHOD "D") EXISTING UTILITY, DRAINAGE, AND SANITARY EASEMENT (ENTIRE PARCEL) EXISTING UTILITY, DRAINAGE, AND SANITARY EASEMENT (ENTIRE PARCEL) AP P . P L AP P . P L A P P . P L A P P . P L APP. PL APP. PLAPP. PL APP. PL APP. PL APP. PL AP P . P L A P P . P L A P P . P L A P P . P L AP P . P L AP P . P L APP . P L APP. PL APP . P L 29-13-08-004-030.000-018 FREIJE, THERESA DAWN REVOCABLE TRUST 29-13-08-004-031.000-018 THOMAS HESSION INC. 29-13-08-004-032.000-018 VALLAPURI, SRINIVAS & INDIRA 29-13-08-004-033.000-018 BROOKFIELD RELOCATION INC. 29-13-08-004-034.000-018 RAMSEY, JOHN & ALICIA 29-13-08-004-035.000-018 OSBORNE, THOMAS M SR. & MADELINE H. INSTALL GRANULAR BACKFILL INSTALL 205 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL 4 L.F. OF CONCRETE CURB REPLACEMENT INSTALL 4 L.F. OF CONCRETE CURB REPLACEMENT INV. 875.15 0.11% SLOPE INV. 870.85 INV. 868.61 0.64% SLOPE 1.17% SLOPE 3.9 2 % SLO P E INSTALL 280 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL 70 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL GRANULAR BACKFILL INSTALL GRANULAR BACKFILL 1,500' A 18" MIN 18" MIN NOTE: 1.NO CONSTRUCTION ACTIVITY, STORED MATERIAL, OR STORED EQUIPMENT ALLOWED BETWEEN TOWNE ROAD AND DITCH ROAD FROM AUGUST 26, 2016 THROUGH SEPTEMBER 12, 2016 (STA. 122+72±, LINE "FM-1" TO E.O.P. STA. 5+21±, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). 2.CONTRACTOR SHALL COORDINATE WORK WITH CITY OF CARMEL CONTRACTOR WORKING ON INTERSECTION IMPROVEMENTS AT 106TH STREET AND TOWNE ROAD. IS S U E D F O R C O N S T R U C T I O N E. G . = 8 7 5 . 2 IN V . = 8 6 4 . 8 6 E. G . = 8 7 4 . 1 IN V . = 8 6 2 . 7 1 E. G . = 8 7 0 . 1 IN V . = 8 6 0 . 5 7 E. G . = 8 6 8 . 2 IN V . = 8 5 9 . 7 0 E. G . = 8 6 9 . 9 IN V . = 8 6 2 . 1 4 E. G . = 8 7 1 . 0 IN V . = 8 6 4 . 5 8 E. G . = 8 7 5 . 6 IN V . = 8 6 7 . 0 2 E. G . = 8 7 4 . 9 IN V . = 8 6 4 . 3 3 E. G . = 8 6 8 . 9 IN V . = 8 5 9 . 7 3 E. G . = 8 6 5 . 0 IN V . = 8 5 5 . 3 5 E. G . = 8 6 2 . 4 IN V . = 8 5 2 . 9 8 E. G . = 8 6 4 . 4 IN V . = 8 5 2 . 2 0 E. G . = 8 6 6 . 2 IN V . = 8 5 7 . 6 6 E. G . = 8 6 8 . 2 IN V . = 8 5 9 . 1 1 E. G . = 8 6 9 . 3 IN V . = 8 6 0 . 5 7 W W W W W W W W W W W W W W W W W W W W F M FM FM FM FM FM FM FM G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G GG W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T G G A FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134 + 0 0 135+00 136+00 137+00 138+00 W W W W W W W W W W W W W W W W W W W W W W W W 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 4 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 0 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-10 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 1 2 2 + 5 0 T O S T A . 1 3 7 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 122+50 TO STA. 137+50 LINE "FM-1" STA. 122+50 TO STA. 137+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 0 9 SE E S H E E T C - 0 9 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 1 1 SE E S H E E T C - 1 1 NEW 24" FORCEMAIN EXISTING GRADE NEW 24" FORCEMAIN 36" MIN. 460' B EX I S T I N G 2 1 " S T O R M S E W E R NEW 20" FORCEMAIN EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G G A S M A I N EX I S T I N G 3 6 " S T O R M S E W E R EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G 1 2 " S T O R M S E W E R SP R I N G M I L L R U N D R A I N EX I S T I N G 1 4 " H D P E F O R C E M A I N EX I S T I N G T E L E P H O N E L I N E EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G G A S M A I N EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G 1 2 " S A N I T A R Y S E W E R NEW 20" FORCEMAIN EXISTING GRADE 36" MIN. 36" MIN. 18" MIN. 29-13-08-004-037.000-018 WINDSOR GROVE HOMEOWNERS ASSOC. INC. 29-13-05-000-014.000-018 RILEY FAMILY FARMS LLC 29-13-09-000-001.000-034 WILSON, CARL A. & LORI A. 10545 TOWNE ROAD 29-13-09-000-002.000-034 WADE, JOHN & DARA L. DAVIS WADE 2325 W. 106TH STREET 29-13-09-000-003.000-034 WADE, JOHN & DARA 2255 W. 106TH STREET 29-13-09-000-004.000-034 KESTNER, E. NICHOLAS 2123 W. 106TH STREET 29-13-09-012-010.000-034 WOODHALL LLC 29-13-09-012-014.000-034 WOODHALL LLC 29-13-09-012-011.000-034 WOODHALL LLC 29-13-04-308-008.000-034 WEDGEWOOD BUILDING COMPANY LLC 10645 TOWNE ROAD 29-13-04-305-019.000-034 WILSON, DONALD L. TRUSTEE 10624 TORREY PINES CIRCLE 29-13-04-304-014.000-034 HOPKINS, DAVE & SHARON 10645 TORREY PINES CIRCLE 29-13-04-304-015.000-034 FREEDMAN, JOSHUA & JANET R. SHARP FREEDMAN 2100 W. 106TH STREET 29-13-04-304-016.000-034 FREEDMAN, JOSHUA & JANET R. SHARP FREEDMAN W. 106TH STREET W. 106TH STREET TO W N E R O A D TO W N E R O A D TO R R E Y P I N E S C I R C L E 12" MIN. 12" MIN. 18" MIN.18" MIN. STA. 133+80 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND STA. 134+82 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER AND 20" R.J.D.I. 45° BEND END DIRECTIONAL DRILL ST A . 1 2 7 + 3 2 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R A N D 2 0 " R . J . D . I . 1 1 . 2 5 ° BE N D EN D D I R E C T I O N A L D R I L L ST A . 1 3 3 + 8 0 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ST A . 1 3 4 + 8 2 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R A N D 2 0 " R . J . D . I . 45 ° B E N D EN D D I R E C T I O N A L D R I L L WEL L R U N WEL L R U N WELL R U N STA. 129+27 LINE "FM-1" INSTALL ARV-5 AT HIGH POINT ST A . 1 2 9 + 2 7 L I N E " F M - 1 " IN S T A L L A R V - 5 A T H I G H P O I N T 6' C W E L L R U N (J O H N O S B O R N D R A I N ) L 5' MIN. C W E L L R U N L C W E L L R U N L C W E L L R U N L 5' MIN. 462' B EXISTING SEWER EASEMENT 125+00 FORCEMAIN 1709709.80 177809.69 127+32 11.25° BEND 1709722.96 178041.27 128.00 FORCEMAIN 1709722.98 178109.29 129+27 ARV 1709723.05 178236.34 130+00 FORCEMAIN 1709723.46 178309.29 130+20 24"X20" REDUCER 1709726.37 178499.38 132+00 FORCEMAIN 1709726.56 178509.26 133+80 45° BEND 1709729.91 178689.31 134+00 FORCEMAIN 1709744.60 178702.77 134+76 45° BEND 1709801.96 178755.36 136+00 FORCEMAIN 1709803.02 178877.53 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING 122+72 24"X20" REDUCER 1709713.03 177581.97 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING EXISTING UTILITY, DRAINAGE, AND SANITARY EASEMENT STA. 127+32 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER AND 20" R.J.D.I. 11.25° BEND END DIRECTIONAL DRILLSTA. 122+72 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL STA. 130+20 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL ST A . 1 2 2 + 7 2 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R BE G I N D I R E C T I O N A L D R I L L 24" MIN. INSTALL GRANULAR BACKFILL INSTALL GRANULAR BACKFILL INSTALL 12 L.F. OF ASPHALT DRIVE REPLACEMENT (METHOD "C") INSTALL 12 L.F. OF ASPHALT DRIVE REPLACEMENT (METHOD "C") APP. PL AP P . P L AP P . P L AP P . P L AP P . P L AP P . P L AP P . P LAP P . P L AP P . P L AP P . P L ST A . 1 3 0 + 2 0 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L PROPOSED SANITARY SEWER EASEMENT PROPOSED SANITARY SEWER EASEMENT NOTES: 1.REMOVE EXISTING TREES STA. 127+20 TO STA. 130+20 STA. 133+80 TO STA. 134+10 2.NO BORE PITS OR RECEIVING PITS ARE ALLOWED ON CARL AND LORI WILSON'S PROPERTY AT 10545 TOWNE ROAD. 3.NO BORE PITS OR RECEIVING PITS ARE ALLOWED ON E. NICHOLAS KESTNER'S PROPERTY AT 2123 W. 106TH STREET. 5' MIN. 5' MIN. INV. 859.27 2.09% S L O P E 2.39% S L O P E INV. 859.27 INV. 865.46 INV. 867.68 INV. 855.59 INV. 851.02 INV. 857.33 4.6 0 % S L O P E 2.37% S L O P E 6.39 % S L O P E 1.45% SLOPE EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G E L E C T R I C A L L I N E 288' A 268' A EX I S T I N G 1 4 " H D P E F O R C E M A I N NEW 20" FORCEMAIN NEW 20" FORCEMAIN NEW 24" FORCEMAIN NEW 20" FORCEMAIN NEW 20" FORCEMAIN NEW 24" FORCEMAIN NOTE: 1.NO CONSTRUCTION ACTIVITY, STORED MATERIAL, OR STORED EQUIPMENT ALLOWED BETWEEN TOWNE ROAD AND DITCH ROAD FROM AUGUST 26, 2016 THROUGH SEPTEMBER 12, 2016 (STA. 122+72±, LINE "FM-1" TO E.O.P. STA. 5+21±, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). 2.CONTRACTOR SHALL COORDINATE WORK WITH CITY OF CARMEL CONTRACTOR WORKING ON INTERSECTION IMPROVEMENTS AT 106TH STREET AND TOWNE ROAD. 22' A SB-11 SB-12 IS S U E D F O R C O N S T R U C T I O N E. G . = 8 7 0 . 1 IN V . = 8 6 2 . 0 2 E. G . = 8 6 8 . 8 IN V . = 8 6 0 . 5 1 E. G . = 8 6 7 . 1 IN V . = 8 5 8 . 1 9 E. G . = 8 6 6 . 2 IN V . = 8 5 5 . 8 7 E. G . = 8 6 2 . 9 IN V . = 8 5 3 . 5 5 E. G . = 8 6 1 . 1 IN V . = 8 5 1 . 2 3 E. G . = 8 5 5 . 4 IN V . = 8 4 8 . 9 1 E. G . = 8 5 7 . 1 IN V . = 8 4 6 . 8 4 E. G . = 8 5 6 . 2 IN V . = 8 4 4 . 9 5 E. G . = 8 5 1 . 6 IN V . = 8 4 3 . 0 5 E. G . = 8 5 4 . 2 IN V . = 8 4 3 . 7 1 E. G . = 8 5 7 . 8 IN V . = 8 4 7 . 6 0 E. G . = 8 6 4 . 6 IN V . = 8 5 1 . 6 1 E. G . = 8 6 4 . 3 IN V . = 8 5 3 . 0 0 E. G . = 8 6 3 . 8 IN V . = 8 5 2 . 9 6 W W W W W W W W W WFMFMFM FM FM FM FM FM FM FM FM FM FM G G G G G G G G G G G G G G G G G G G G G G G G G G G G E W W W W W W W W W W W W W W W W W W W W W W W W W W W T A A FM FM FM FM FM FM FM FM FM FM FM FM FM 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 T W W W W W W W W W W W W W W W W W W W W W W W W W W W 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 5 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 1 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-11 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 1 3 7 + 5 0 T O S T A . 1 5 2 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 137+50 TO STA. 152+50 LINE "FM-1" STA. 137+50 TO STA. 152+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 1 0 SE E S H E E T C - 1 0 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 1 1 SE E S H E E T C - 1 1 NEW 20" FORCEMAIN EXISTING GRADE NEW 20" FORCEMAIN EX I S T I N G 1 2 " W A T E R M A I N 18" EX I S T I N G 1 2 " S A N I T A R Y S E W E R EX I S T I N G 1 6 " W A T E R M A I N NEW 20" FORCEMAIN EXISTING GRADE NEW 20" FORCEMAIN 29-13-09-004-006.000-034 PRICE, R. JEFFREY & LINDA K. 10572 CHATHAM CT. 29-13-04-304-018.000-034 1800 106TH STREET PARTNERS LLC 1800 W. 106TH STREET 29-13-04-307-001.000-034 CROOKED STICK GOLF CLUB INC 29-13-04-307-002.000-034 BLITZ, MARY TURNER TRUSTEE 2050 W. 106TH STREET 29-13-04-307-003.000-034 BLOM, ERIC D. & SALLY M. 2000 W. 106TH STREET 29-13-04-000-086.000-034 CROOKED STICK GOLF CLUB INC. 29-13-04-402-001.000-034 HOVDE, F. BOYD & ALICE A. 1814 W. 106TH STREET 29-13-09-002-001.000-034 BRUNK, GLEN A. & CYNTHIA S. 10564 COPPERGATE DRIVE 29-13-09-004-005.000-034 JAY, JAMES L. & MARCIA E. 10578 CHATHAM CT. 29-13-09-004-004.000-034 SHUMWAY, GARY L. & KAREN L. 10571 CHATHAM CT. 29-13-09-003-019.000-034 WINDEMERE HOMEOWNERS ASSOC. INC 29-13-09-003-007.000-034 FINKELMEIER, WILLIAM R. & TERRI A. 10566 HYDE PARK 29-13-09-003-008.000-034 VORE, CHARLES SCOTT & PAMELA ANN 10576 HYDE PARK 29-13-09-003-009.000-034 DANIELS, WILLIAM E. & JANET C. 10565 HYDE PARK W. 106TH STREET W. 106TH STREET WI N D E M E R E B L V D . WI N D E M E R E B L V D . 18" MIN. 6' STA. 150+34 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND STA. 150+92 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND ST A . 1 5 0 + 3 4 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D ST A . 1 5 0 + 9 2 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 2 2 . 5 ° B E N D ST A . 1 3 9 + 3 5 LI N E " F M - 1 " IN S T A L L 2 0 " R. J . D . I . 1 1 . 2 5 ° BE N D ST A . 1 3 8 + 2 2 LI N E " F M - 1 " IN S T A L L A R V - 6 AT H I G H P O I N T ST A . 1 4 0 + 6 2 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 11 . 2 5 ° B E N D 400' B WE L L R U N (J O H N O S B O R N D R A I N ) WE L L R U N (J O H N O S B O R N D R A I N ) STA. 138+22 LINE "FM-1" INSTALL ARV-6 AT HIGH POINT STA. 139+35 LINE "FM-1" INSTALL 20" R.J.D.I. 11.25° BEND STA. 140+62 LINE "FM-1" INSTALL 20" R.J.D.I. 11.25° BEND WELL RUN WELL RUN 139+35 11.25° BEND 1709798.80 179212.83 140+00 FORCEMAIN 1709810.27 179276.43 140+62 11.25° BEND 1709820.67 179337.61 142+00 FORCEMAIN 1709822.34 179475.55 144+00 FORCEMAIN 1709824.76 179675.53 146+00 FORCEMAIN 1709826.46 179875.52 148+00 FORCEMAIN 1709826.38 180075.52 148+41 24"X20" REDUCER 1709826.36 180116.59 150+00 FORCEMAIN 1709826.30 180275.52 150+34 22.5° BEND 1709826.29 180307.71 150+46 ARV 1709820.96 180318.39 150+62 22.5° BEND 1709811.83 180335.90 150+92 22.5° BEND 1709801.42 180361.75 152+00 FORCEMAIN 1709801.27 180470.07 152+47 24"X20" REDUCER 1709801.20 180517.75 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING 138+00 FORCEMAIN 1709798.59 179073.71 138+22 ARV 1709798.63 179099.40 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING 144+41 24"X20" REDUCER 1709825.27 179716.88 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING 150+34 22.5° BEND 1709826.29 180305.84 EXISTING SEWER AND UTILITY EASEMENT STA. 144+41 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL STA. 148+41 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER END DIRECTIONAL DRILL STA. 150+46 LINE "FM-1" INSTALL ARV-7 AT HIGH POINT ST A . 1 4 4 + 4 1 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L ST A . 1 4 8 + 4 1 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . R E D U C E R EN D D I R E C T I O N A L D R I L L ST A . 1 5 0 + 4 6 L I N E " F M - 1 " IN S T A L L A R V - 7 A T H I G H P O I N T 5' MIN. 5' MIN. EXISTING SEWER AND UTILITY EASEMENT AP P . P L A P P . P L AP P . P L AP P . P L AP P . P L AP P . P L AP P . P L APP. PL AP P . P L AP P . P L A P P . P L AP P . P L APP . P L A P P . P L INSTALL 86 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F")INSTALL 182 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL GRANULAR BACKFILL INSTALL GRANULAR BACKFILL ST A . 1 5 2 + 4 7 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R BE G I N D I R E C T I O N A L D R I L L STA. 152+47 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL 3' B INV. 862.33 2.32% S L O P E INV. 842.02 INV. 842.02 INV. 853.004.02% S L O P E EX I S T I N G E L E C T R I C A L L I N E 1.87% SL O P E 691' A 406' A NOTES: 1.REMOVE EXISTING TREES STA. 140+40 TO STA. 144+41 STA. 148+41 TO STA. 150+85 EX I S T I N G 1 2 " W A T E R M A I N INV. 853.00 18" MIN. 12" MIN. NEW 24" FORCEMAIN NEW 24" FORCEMAIN NOTE: 1.NO CONSTRUCTION ACTIVITY, STORED MATERIAL, OR STORED EQUIPMENT ALLOWED BETWEEN TOWNE ROAD AND DITCH ROAD FROM AUGUST 26, 2016 THROUGH SEPTEMBER 12, 2016 (STA. 122+72±, LINE "FM-1" TO E.O.P. STA. 5+21±, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). 0.04% SLOPE IS S U E D F O R C O N S T R U C T I O N T T W W W W W W W W W W W W FM FM FM FM FM FM FM FM FM FM FM FM FM FMGGGGGGGGGGGGGGGGGGG G G G G G G G G G G E W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T FM FM FM FM FM FM FM FM FM FM FM FM FM FM 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 TWWWWWWWWWWW W W W W W W W W W W W W W W W E. G . = 8 6 4 . 4 IN V . = 8 5 2 . 9 2 E. G . = 8 6 3 . 5 IN V . = 8 5 2 . 6 1 E. G . = 8 6 1 . 7 IN V . = 8 5 2 . 0 7 E. G . = 8 6 1 . 6 IN V . = 8 5 1 . 5 3 E. G . = 8 6 1 . 3 IN V . = 8 5 0 . 9 9 E. G . = 8 6 0 . 7 IN V . = 8 5 0 . 4 5 E. G . = 8 5 8 . 8 IN V . = 8 4 9 . 9 1 E. G . = 8 5 8 . 6 IN V . = 8 4 9 . 3 7 E. G . = 8 5 6 . 6 IN V . = 8 4 8 . 4 6 E. G . = 8 4 2 . 9 IN V . = 8 3 5 . 0 8 E. G . = 8 4 4 . 7 IN V . = 8 3 8 . 2 7 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 7 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 2 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-12 1"=50' MAY 2016 DS W DR C JA J CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 1 5 2 + 5 0 T O S T A . 1 6 7 + 5 0 L I N E " F M - 1 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 152+50 TO STA. 167+50 LINE "FM-1" STA. 152+50 TO STA. 167+50 LINE "FM-1" MA T C H L I N E MA T C H L I N E SE E S H E E T C - 1 1 SE E S H E E T C - 1 1 MA T C H L I N E MA T C H L I N E SE E S H E E T C - 1 3 SE E S H E E T C - 1 3 NEW 20" FORCEMAIN EXISTING GRADE NEW 20" FORCEMAIN EX I S T I N G 1 2 " S T O R M S E W E R 18" MIN. NEW 20" FORCEMAIN EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 1 5 " S A N I T A R Y S E W E R EX I S T I N G S A N I T A R Y S E W E R EX I S T I N G 1 6 " W A T E R M A I N EX I S T I N G G A S L I N E 12" MIN. 18" MIN. NEW 20" FORCEMAIN EXISTING GRADE 29-13-09-002-001.000-034 BRUNK, GLAN A. & CYNTHIA S. 10564 COPPERGATE DRIVE 29-13-04-402-001.000-034 HOVDE, F. BOYD & ALICE A. 1814 W. 106TH STREET 29-13-09-002-002.000-034 STICKNEY, JASON M. 10566 COPPERGATE DRIVE 29-13-09-002-033.000-034 COPPERGATE PROPERTY OWNERS ASSOC. INC. 29-13-09-002-003.000-034 HAN, SANFORD A. & JANICE L. 10598 COPPERGATE DRIVE 29-13-09-002-004.000-034 ROWLETT, MARILYN M. 10596 COPPERGATE DRIVE 29-13-09-002-005.000-034 IVERSON, NANCY MEEK 10592 COPPERGATE DRIVE 29-13-09-002-006.000-034 GREENBERG, JEFFREY A. & NANCY B. 10588 COPPERGATE DRIVE 29-13-04-402-002.000-034 DUNBAR, DONALD R. & KATHLEEN A. 1700 W. 106TH STREET 29-13-04-402-005.000-034 MERRITT, FRED J. 1650 W. 106TH STREET 29-13-04-000-086.000-034 CROOKED STICK GOLF CLUB INC. 29-13-04-401-013.000-034 SEXTON DEVELOPMENT LLC 29-13-04-000-085.000-034 SEXTON DEVELOPMENT LLC 1506 W. 106TH STREET W. 106TH STREET W. 106TH STREET CO P P E R G A T E CR O O K E D S T I C K L A N E 18" MIN. 18" MIN. EX I S T I N G T E L E P H O N E L I N E EX I S T I N G T E L E P H O N E L I N E STA. 164+50 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER END DIRECTIONAL DRILL 97' B ST A . 1 6 0 + 7 2 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D (R O L L E D ) ST A . 1 6 0 + 9 8 L I N E " F M - 1 " IN S T A L L ( 2 ) 2 0 " R . J . D . I . 45 ° B E N D S ( R O L L E D ) C S P R I N G M I L L R U N STA. 160.95 LINE "FM-1" INSTALL (2) 20" R.J.D.I. 45° BENDS (ROLLED) STA. 160+72 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND (ROLLED) EXISTING EXCLUSIVE WATER EASEMENT EXISTING SANITARY SEWER EASEMENT EXISTING SEWER EASEMENTEXISTING PLATTED DRAINAGE AND UTILITY EASEMENT EXISTING SANITARY SEWER EASEMENT SPRING MILL RUN 153+47 24"X20" REDUCER 1709802.24 180617.01 154+00 FORCEMAIN 1709803.18 180670.06 156+00 FORCEMAIN 1709806.64 180870.03 158+00 FORCEMAIN 1709809.68 181070.00 160+00 FORCEMAIN 1709809.87 181269.98 160+72 45° BEND 1709810.86 181341.65 160+98 45° BEND 1709831.53 181352.14 161+41 22.5° BEND 1709840.83 181396.52 162+00 FORCEMAIN 1709839.01 181455.07 164+00 FORCEMAIN 1709836.30 181655.00 164+50 24"X20" REDUCER 1709837.14 181707.95 166+00 FORCEMAIN 1709839.47 181854.97 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING L STA. 153+47 LINE "FM-1" INSTALL 24"X20" R.J.D.I. REDUCER END DIRECTIONAL DRILL INSTALL 15 L.F. OF CONCRETE DRIVE REPLACEMENT (METHOD "C") INSTALL 28 L.F. OF CONCRETE DRIVE REPLACEMENT (METHOD "C") INSTALL 21 L.F. ASPHALT DRIVEWAY REPLACEMENT (METHOD "C") INSTALL 26 L.F. ASPHALT DRIVEWAY REPLACEMENT (METHOD "C") ST A . 1 5 3 + 4 7 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R EN D D I R E C T I O N A L DR I L L INSTALL GRANULAR BACKFILL INSTALL GRANULAR BACKFILL ST A . 1 6 4 + 5 0 L I N E " F M - 1 " IN S T A L L 2 4 " X 2 0 " R . J . D . I . RE D U C E R EN D D I R E C T I O N A L D R I L L A P P . P L AP P . P L AP P . P L AP P . P L AP P . P L APP . P L AP P . P L AP P . P L AP P . P L A P P . P L INSTALL 59 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL 33 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL 225 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL 152 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") INSTALL 166 L.F. OF ASPHALT PATH REPLACEMENT (METHOD "F") PROPOSED SANITARY SEWER EASEMENT PROPOSED SANITARY SEWER EASEMENT E. G . = 8 4 1 . 0 IN V . = 8 2 9 . 8 9 E. G . = 8 4 1 . 2 IN V . = 8 2 6 . 0 0 E. G . = 8 4 3 . 3 IN V . = 8 2 8 . 6 9 E. G . = 8 4 2 . 2 IN V . = 8 3 1 . 8 8 INV. 848.84 0.54% SLOPE 3.20% S L O P E INV. 825.30 2 1 . 8 9 % S L O P E INV. 838.82 INV. 825.47 5' MIN. 794' A 309' B 300' A NOTES: 1.REMOVE EXISTING TREES STA. 161+00 TO STA. 161+90 STA. 164+00 TO STA. 167+50 INV. 852.90 0.08% SLOPE ST A . 1 6 1 + 4 1 L I N E " F M - 1 " I N S T A L L 20 " R . J . D . I . 2 2 . 5 ° B E N D A N D 24 " X 2 0 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L EX I S T I N G 2 0 " W A T E R M A I N STA. 161+40 LINE "FM-1" INSTALL 20" R.J.D.I. 22.5° BEND AND 24"X20" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL INV. 834.47 1 1 . 1 % S L O P E 0.30% SLOPE 12" MIN. 4.5' NEW 24" FORCEMAIN NEW 24" FORCEMAIN NEW 24" FORCEMAIN NOTES: 1.NO CONSTRUCTION ACTIVITY, STORED MATERIAL, OR STORED EQUIPMENT ALLOWED BETWEEN TOWNE ROAD AND DITCH ROAD FROM AUGUST 26, 2016 THROUGH SEPTEMBER 12, 2016 (STA. 122+72±, LINE "FM-1" TO E.O.P. STA. 5+21±, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). 2.ALL TURF DISTURBED AS PART OF THIS PROJECT ON CROOKED STICK GOLF CLUB, INC. PROPERTY / WITHIN PROPOSED SANITARY SEWER EASEMENT SHALL BE RESTORED TO EQUAL TO OR BETTER THAN CONDITIONS PRIOR TO AUGUST 26, 2016 (STA. 160+50±, LINE "FM-1" TO STA. 164+00, LINE "FM-1", SEE SPEC. 01125). 3.ALL WORK ON PROPOSED SANITARY SEWER EASEMENTS EAST OF CROOKED STICK LANE SHALL ONLY BEGIN AFTER APRIL 3, 2017, OR THE DATE OWNER ACQUIRES THE PROPOSED EASEMENT, WHICHEVER OCCURS FIRST (STA. 164+00±, LINE "FM-1" TO E.O.P. STA. 5+21, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). SB-14 IS S U E D F O R C O N S T R U C T I O N E. G . = 8 5 1 . 2 IN V . = 8 4 1 . 7 8 E. G . = 8 5 4 . 0 IN V . = 8 4 5 . 3 4 E. G . = 8 5 5 . 3 IN V . = 8 4 7 . 6 9 E. G . = 8 5 4 . 7 IN V . = 8 4 6 . 0 8 E. G . = 8 5 6 . 2 IN V . = 8 4 4 . 4 7 E. G . = 8 5 2 . 4 IN V . = 8 4 2 . 8 6 E. G . = 8 5 0 . 2 IN V . = 8 5 0 . 1 8 E. G . = 8 4 8 . 7 IN V . = 8 4 8 . 7 3 E. G . = 8 4 7 . 3 IN V . = 8 4 7 . 3 4 E. G . = 8 4 6 . 5 IN V . = 8 4 6 . 5 5 E. G . = 8 4 7 . 8 IN V . = 8 4 7 . 7 6 E. G . = 8 4 5 . 7 IN V . = 8 4 5 . 7 2 FM FM FM FM FM FM G G G G G G G G G G G W W W W W W W W W W W A FM FM FM FM FM FM 173+39 168+00 169+00 170+00 171+00 172+00 173+00 W W W W W W W W W W W 851 8 5 1 T W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W FM FM FM FM FM G G G G G G G G G G G G G G G F/O F/ O F/O F/O F/ O F/OF/O F/O F/O F/ O F/O E E E E E E E E E E E E E E E E E E E E E E E E E E E E E W W W W W W W W W W W W W W W E E E FM FM FM FM FM W W W W W W W W W W T 851 5+21 0+00 1+00 2+00 3+00 4+00 5 + 0 0 8 5 1 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 8 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 3 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m MA T C H L I N E MA T C H L I N E SE E S H E E T C - 1 2 SE E S H E E T C - 1 2 NEW 20" FORCEMAIN EXISTING GRADE NEW 20" FORCEMAIN 29-13-09-002-007.000-034 KLAPPER, STEPHEN R. & ELIZABETH B. 10584 COPPERGATE DRIVE 29-13-04-000-085.000-034 SEXTON DEVELOPMENT LLC 1506 W. 106TH STREET 29-13-04-000-085.000-034 SEXTON DEVELOPMENT LLC 1506 W. 106TH STREET 29-13-03-001-005.000-034 RITCHIE, ELEN S. 1376 W. 106TH STREET 29-13-09-008-002.000-034 BALABAN, ALEX & LUBA 1525 W. 106TH STREET 29-13-09-000-010.002-034 LATONA, JOHN & DORIS LEE 10570 DITCH ROAD 29-13-09-000-010.002-034 VLADIMIROV, MIKHAIL V. & TATIANA PALI 10590 DITCH ROAD 29-13-10-002-005.000-034 LAUREL RIDGE LLC 10540 LAUREL RIDGE LANE W. 106TH STREET W. 106TH STREET DI T C H R O A D DI T C H R O A D 6' E.O.P. STA. 173+39 LINE "FM-1" INSTALL 20" R.J.D.I. 45° BEND (SEE DETAILS, SHEET C-16) ST A . 1 6 9 + 7 7 L I N E " F M - 1 " IN S T A L L A R V - 8 AT H I G H P O I N T EXISTING UNRECORDED EASEMENT "MEEK" EXISTING PLATTED DRAINAGE AND UTILITY EASEMENT EXISTING PLATTED DRAINAGE AND UTILITY EASEMENT STA. 169+77 LINE "FM-1" INSTALL ARV-8 AT HIGH POINT EXISTING 20' SEWER AND UTILITY EASEMENT PROPOSED SANITARY SEWER EASEMENT 168+00 FORCEMAIN 1709842.64 182054.95 169+77 ARV 1709845.45 182232.70 170+00 FORCEMAIN 1709845.80 182254.92 172+00 FORCEMAIN 1709848.97 182454.90 173+19 45° BEND 1709850.57 182573.56 173+39 45° BEND (E.O.P.)1709864.42 182588.00 FORCEMAIN LOCATION TABLE - LINE "FM-1" STATION FEATURE NORTHING EASTING PROPOSED VALVE VAULT (SEE DETAILS, SHEET C-15) INSTALL GRANULAR BACKFILL AP P . P L AP P . P L A P P . P L APP . P L PROPOSED SANITARY SEWER EASEMENT PROPOSED SANITARY SEWER EASEMENT PROPOSED VALVE VAULT (SEE DETAILS, SHEET C-16) PROPOSED ACCESS DRIVE (SEE DETAILS, SHEET C-16) A P P . P L 1.61% SL O P E 3.57% S L O P E INV. 848.07 INV. 842.13 589' A NOTES: 1.REMOVE EXISTING TREES STA. 167+50 TO STA. 173+00 STA. 173+19 LINE "FM-1" INSTALL 45° R.J.D.I. BEND ST A . 1 7 3 + 1 9 L I N E " F M - 1 " IN S T A L L 4 5 ° R . J . D . I . B E N D NEW 12" FORCEMAIN EXISTING GRADE B. O . P . S T A . 0 + 0 0 L I N E " F M - 2 " CO N N E C T T O 1 2 " P L U G V A L V E (S E E D E T A I L S , S H E E T C - 1 6 ) 0+00 B.O.P.1709864.43 182618.30 0+02 45° BEND 1709864.42 182619.93 0+22 45° BEND 1709849.88 182634.47 2+00 FORCEMAIN 1709849.88 182634.47 3+30 45° BEND 1709853.70 182812.23 3+55 45° BEND 1709874.64 182959.46 4+00 FORCEMAIN 1709874.15 183004.87 4+82 45° BEND 1709873.84 183086.70 5+21 45° BEND (E.O.P.)1709847.68 183114.79 FORCEMAIN LOCATION TABLE - LINE "FM-2" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-2" STATION FEATURE NORTHING EASTING INV. 842.50 INV. 838.82 INV. 838.03 1.06% SLOPE 0.46% SLOPE STA. 0+02 LINE "FM-2" INSTALL 12" R.J.D.I. 45° BEND STA. 0+22 LINE "FM-2" INSTALL 12" R.J.D.I. 45° BEND B.O.P. STA. 0+00 LINE "FM-2" CONNECT TO 12" PLUG VALVE (SEE DETAILS, SHEET C-16) STA. 3+30 LINE "FM-2" INSTALL 12" R.J.D.I. 45° BEND STA. 3+55 LINE "FM-2" INSTALL 12" R.J.D.I. 45° BEND AND 14"X12" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL STA. 4+82 LINE "FM-2" INSTALL 14"X12" R.J.D.I. REDUCER AND 12" R.J.D.I. 45° BEND END DIRECTIONAL DRILL E.O.P. STA. 5+21 LINE "FM-2" INSTALL 12" R.J.D.I. 45° BEND AND 12" R.J.D.I. PLUG NEW 12" FORCEMAIN PLAN VIEW - B.O.P. STA. 0+00 TO E.O.P. STA. 5+21 LINE "FM-2" PROFILE - B.O.P. STA. 0+00 TO E.O.P. STA. 5+21 LINE "FM-2" ST A . 0 + 2 2 L I N E " F M - 2 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D ST A . 0 + 0 2 L I N E " F M - 2 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D ST A . 3 + 3 0 L I N E " F M - 2 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D ST A . 3 + 5 5 L I N E " F M - 2 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D AN D 1 4 " X 1 2 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L E. O . P . S T A . 5 + 2 1 L I N E " F M - 2 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D AN D 1 2 " R . J . D . I . P L U G E. O . P . S T A . 1 7 3 + 3 9 L I N E " F M - 1 " IN S T A L L 2 0 " R . J . D . I . 4 5 ° B E N D ( S E E DE T A I L S , S H E E T C - 1 6 ) EX I S T I N G T E L E P H O N E L I N E (3 ) E X I S T I N G E L E C T R I C A L L I N E S EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 1 2 . 5 " S T O R M S E W E R EX I S T I N G G A S L I N E EX I S T I N G G A S L I N E EX I S T I N G 1 5 " S T O R M S E W E R EX I S T I N G T E L E P H O N E L I N E (3 ) E X I S T I N G F I B E R O P T I C L I N E S -- - - -- - - -- - - -- - - -- 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 DS W DR C JA J CJ F 1"=50' C-13 FO R C E M A I N P L A N A N D P R O F I L E ST A . 1 6 7 + 5 0 T O E . O . P . S T A . 1 7 3 + 3 9 L I N E " F M - 1 " B. O . P . S T A . 0 + 0 0 T O E . O . P . S T A . 5 + 2 1 L I N E " F M - 2 " PLAN VIEW - STA. 167+50 TO E.O.P. STA. 173+39 LINE "FM-1" PROFILE - STA. 167+50 TO E.O.P. STA. 173+39 LINE "FM-1" 18" MIN 18" MIN ST A . 4 + 8 2 L I N E " F M - 2 " IN S T A L L 1 4 " X 1 2 " R . J . D . I . R E D U C E R AN D 1 2 " R . J . D . I . 4 5 ° B E N D EN D D I R E C T I O N A L D R I L L PROPOSED VALVE VAULT (SEE DETAILS, SHEET C-16) LINE "FM-3" (SEE SHEET C-14) 355' D 127' E 39' D LINE "FM-3" (SEE SHEET C-14) NEW 14" FORCEMAIN NEW 12" FORCEMAIN NEW 14" FORCEMAIN NOTES: 1.NO CONSTRUCTION ACTIVITY, STORED MATERIAL, OR STORED EQUIPMENT ALLOWED BETWEEN TOWNE ROAD AND DITCH ROAD FROM AUGUST 26, 2016 THROUGH SEPTEMBER 12, 2016 (STA. 122+72±, LINE "FM-1" TO E.O.P. STA. 5+21±, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). 2.ALL WORK ON PROPOSED SANITARY SEWER EASEMENTS EAST OF CROOKED STICK LANE SHALL ONLY BEGIN AFTER APRIL 3, 2017, OR THE DATE OWNER ACQUIRES THE PROPOSED EASEMENT, WHICHEVER OCCURS FIRST (STA. 164+00±, LINE "FM-1" TO E.O.P. STA. 5+21, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC.01125). PROPOSED SANITARY SEWER EASEMENT TEMPORARY SANITARY SEWER EASEMENT SB-15 SB-16 IS S U E D F O R C O N S T R U C T I O N T W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W FM FM FM FM FM G G G G G G G G G G G G G G G G F/O F/ O F/O F/O F/ O F/OF/O F/O F/O F/ O F/O E E E E E E E E E E E E E E E E E E E E E E E E E E E E E W W W W W W W W W W W W W W W E E E FM FM FM FM FM W W W W W W W W W W W T 851 7+ 1 3 0+ 0 0 1+00 2+00 3+00 4+00 5 + 0 0 6+ 0 0 7+ 0 0 8 5 1 E. G . = 8 5 1 . 0 IN V . = 8 5 0 . 9 5 E. G . = 8 4 9 . 2 IN V . = 8 4 9 . 2 5 E. G . = 8 4 7 . 7 IN V . = 8 4 7 . 6 6 E. G . = 8 4 7 . 1 IN V . = 8 4 7 . 1 3 E. G . = 8 4 7 . 9 IN V . = 8 4 7 . 9 2 E. G . = 8 4 5 . 5 IN V . = 8 4 5 . 4 7 E. G . = 8 4 8 . 0 IN V . = 8 4 8 . 0 4 E. G . = 8 4 8 . 1 IN V . = 8 4 8 . 1 3 5%#.'ž 5%#.'ž    *14+<106#. 8'46+%#. PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 3 : 5 9 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 4 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m PROFILE - PLAN VIEW - C-14 1"=30' MAY 2016 DS W DR C CA B CJ F FO R C E M A I N P L A N A N D P R O F I L E ST A . 0 + 0 0 T O E . O . P . S T A . 7 + 1 2 L I N E " F M - 3 " PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T -- - - -- - - -- - - -- - - -- 43 8 8 STA. 0+00 TO E.O.P. STA. 7+12 LINE "FM-3" STA. 0+00 TO E.O.P. STA. 7+12 LINE "FM-3" NEW 12" FORCEMAIN 29-13-04-000-085.000-034 SEXTON DEVELOPMENT LLC 1506 W. 106TH STREET 29-13-03-001-005.000-034 RITCHIE, ELEN S. 1376 W. 106TH STREET 29-13-09-000-010.002-034 VLADIMIROV, MIKHAIL V. & TATIANA PALI 10590 DITCH ROAD 29-13-10-002-005.000-034 LAUREL RIDGE LLC 10540 LAUREL RIDGE LANE W. 106TH STREET DI T C H R O A D DI T C H R O A D E.O.P. STA. 7+12 LINE "FM-3" INSTALL 14"X12" R.J.D.I. REDUCER AND 12" R.J.D.I. 45° BEND AND 12" R.J.D.I. PLUG. END DIRECTIONAL DRILL EXISTING 20' SEWER AND UTILITY EASEMENT PROPOSED SANITARY SEWER EASEMENT 0+00 45° BEND (B.O.P.)1709842.64 182054.95 0+04 45° BEND 1709844.88 182604.36 2+00 FORCEMAIN 1709848.97 182454.90 3+30 14"X12" REDUCER 1709851.07 182927.85 4+00 FORCEMAIN 1709850.98 182654.88 4+92 45° BEND 1709851.26 182854.88 5+12 45° BEND 1709851.07 182927.85 6+00 FORCEMAIN 1709858.26 183127.65 7+13 45° BEND (E.O.P.)1709649.78 183055.72 FORCEMAIN LOCATION TABLE - LINE "FM-3" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-3" STATION FEATURE NORTHING EASTING FORCEMAIN LOCATION TABLE - LINE "FM-3" STATION FEATURE NORTHING EASTING B.O.P. STA. 0+00 LINE "FM-3" INSTALL 12" 45° R.J.D.I. BEND (ROLLED) (SEE DETAILS, SHEET C-16)A P P . P L A P P . P L PROPOSED SANITARY SEWER EASEMENT STA. 4+92 LINE "FM-3" INSTALL 14"X12" R.J.D.I. REDUCER AND 12" R.J.D.I. 45° BEND. END DIRECTIONAL DRILL A P P . P L NOTE: 1.REMOVE EXISTING TREES STA. 167+50 TO STA. 173+00 EXISTING GRADE EX I S T I N G T E L E P H O N E L I N E (3 ) E X I S T I N G E L E C T R I C A L L I N E S EX I S T I N G 1 2 " W A T E R M A I N EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G E L E C T R I C A L L I N E EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 1 5 " S T O R M S E W E R EX I S T I N G 1 8 " S T O R M S E W E R EX I S T I N G T E L E P H O N E L I N E (3 ) E X I S T I N G F I B E R O P T I C L I N E S NEW 12" FORCEMAIN B. O . P . S T A . 0 + 0 0 L I N E " F M - 3 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D (R O L L E D ) ( S E E D E T A I L S , SH E E T C - 1 6 ) EX I S T I N G G A S L I N E E. O . P . S T A . 7 + 1 2 L I N E " F M - 3 " IN S T A L L 1 4 " X 1 2 " R . J . D . I . RE D U C E R A N D 1 2 " R . J . D . I . 4 5 ° BE N D A N D 1 2 " R . J . D . I . P L U G EN D D I R E C T I O N A L D R I L L 1.02% SLOPE 330' D 1.37% SLOPE INV. 842.50 INV. 837.29 INV. 841.03 (3 ) E X I S T I N G F I B E R O P T I C L I N E S (3 ) E X I S T I N G T E L E P H O N E L I N E S EX I S T I N G F O R C E M A I N EX I S T I N G F O R C E M A I N ST A . 0 + 0 4 L I N E " F M - 3 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D (R O L L E D ) ST A . 4 + 9 2 L I N E " F M - 3 " IN S T A L L 1 4 " X 1 2 " R . J . D . I . R E D U C E R AN D 1 2 " R . J . D . I . 4 5 ° B E N D EN D D I R E C T I O N A L D R I L L EX I S T I N G 1 8 " S T O R M S E W E R EX I S T I N G 1 8 " S T O R M S E W E R EX I S T I N G G A S L I N E (3 ) E X I S T I N G E L E C T R I C A L L I N E S EX I S T I N G T E L E P H O N E L I N E EX I S T I N G T E L E P H O N E L I N E EX I S T I N G T E L E P H O N E L I N E EX I S T I N G 1 8 " S T O R M S E W E R STA. 0+04 LINE "FM-3" INSTALL 12" R.J.D.I. 45° BEND (ROLLED) STA. 5+12 LINE "FM-3" INSTALL 12" R.J.D.I. 45° BEND AND 12" R.J.D.I. 11.25° BEND AND 14"X12" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL ST A . 5 + 1 2 L I N E " F M - 3 " IN S T A L L 1 2 " R . J . D . I . 4 5 ° B E N D AN D 1 2 " R . J . D . I . 1 1 . 2 5 ° B E N D AN D 1 4 " X 1 2 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L ST A . 3 + 3 0 L I N E " F M - 3 " IN S T A L L 1 4 " X 1 2 " R . J . D . I . R E D U C E R BE G I N D I R E C T I O N A L D R I L L STA. 3+30 LINE "FM-3" INSTALL 14"X12" R.J.D.I. REDUCER BEGIN DIRECTIONAL DRILL LINE "FM-2" (SEE SHEET, C-13) PR O P O S E D 1 2 " F O R C E M A I N (S E E P L A N & D E T A I L S S H E E T C- 1 6 ) PR O P O S E D 1 2 " F O R C E M A I N (S E E P L A N S & D E T A I L S H E E T C- 1 6 ) 18" MIN 18" MIN 18" MIN 18" MIN 18" MIN 18" MIN 18" MIN 18" MIN 162' E 200' E PROPOSED VALVE VAULT (SEE DETAILS, SHEET C-16) 12" MIN 12" MIN 20' D PROPOSED SANITARY SEWER EASEMENT TEMPORARY SANITARY SEWER EASEMENT. EXISTING DRAINAGE AND UTILITY EASEMENT EXISTING WALL (DO NOT DISTURB) NEW 14" FORCEMAIN NEW 12" FORCEMAIN NEW 14" FORCEMAIN NEW 14" FORCEMAIN NEW 14" FORCEMAIN INV. 841.75 NOTES: 1.NO CONSTRUCTION ACTIVITY, STORED MATERIAL, OR STORED EQUIPMENT ALLOWED BETWEEN TOWNE ROAD AND DITCH ROAD FROM AUGUST 26, 2016 THROUGH SEPTEMBER 12, 2016 (STA. 122+72±, LINE "FM-1" TO E.O.P. STA. 5+21±, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). 2.ALL WORK ON PROPOSED SANITARY SEWER EASEMENTS EAST OF CROOKED STICK LANE SHALL ONLY BEGIN AFTER APRIL 3, 2017, OR THE DATE OWNER ACQUIRES THE PROPOSED EASEMENT, WHICHEVER OCCURS FIRST (STA. 164+00±, LINE "FM-1" TO E.O.P. STA. 5+21, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). SB-16 IS S U E D F O R C O N S T R U C T I O N G G G G FM W W W W T T T T T T T T T T T T T FM FM FM FM FM FM FM FM G G FM FM T T FM FM FM FM FM FM 0+00 1+ 0 0 F/ O F/ O PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 4 : 0 1 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 5 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m -- - - -- - - -- - - -- - - -- 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 MI C H I G A N R O A D W W T P FO R C E M A I N T E R M I N A T I O N A T DS W DR C JA J CJ F NOTED C-15 SITE PLAN NOTES: 1.LIFT STATION #11 FORCEMAIN: INSTALL 8" R.J.D.I. SOLID SLEEVE, (2) 8" R.J.D.I. 45° BENDS, 8" R.J.D.I. PIPE, 8" M.J. PLUG VALVE, AND CONNECT TO EXISTING 8" FORCEMAIN. REMOVE EXISTING 8" FORCEMAIN AS REQUIRED TO COMPLETE NEW WORK. SEE DETAIL 1 THIS SHEET. 2.LIFT STATION #10 FORCEMAIN: INSTALL (2) 14" R.J.D.I. SOLID SLEEVES, 14" R.J.D.I. PIPE, 14" M.J. PLUG VALVE, 14"X14"X8" R.J.D.I. TEE, AND CONNECT TO EXISTING 14" FORCEMAIN. REMOVE EXISTING 8" FORCEMAIN AS REQUIRED TO COMPLETE NEW WORK. SEE DETAIL 1 THIS SHEET. 3.ALL EXCAVATED MATERIALS NOT SUITABLE FOR USE AS BACKFILL BY ENGINEER OR OWNER SHALL BE DISPOSED OF OFF-SITE IN ACCORDANCE WITH STATE/FEDERAL REGULATIONS. 4.ALL DISTURBED AREAS SHALL BE FINE GRADED AND SEEDED PER SPEC. 02920. 5. TEMPORARILY REMOVE AND REINSTALL FENCE AS REQUIRED TO COMPLETE WORK. FENCE SHALL BE PUT BACK UP AT THE END OF EACH WORK DAY. 6.CONTRACTOR SHALL COMPLETE LS #10 & #11 YARD PIPING INSTALLATION CONCURRENTLY, DURING PERIODS OF DRY WEATHER FLOW (NO MEASURABLE PRECIPITATION 48 HOURS PRIOR TO STARTING WORK AND NO WET-WEATHER FORECASTED), AND BETWEEN THE HOURS OF 12 A.M. AND 6 A.M. ON WEEKDAYS. COORDINATE LIFT STATION SHUT-DOWNS WITH OWNER A MINIMUM OF 72 HOURS IN ADVANCE OF STARTING WORK. CONTRACTOR SHALL HAVE VACTOR TRUCK(S) ON-SITE IMMEDIATELY AVAILABLE AT EACH LIFT STATION SITE IN EVENT OF HIGH WETWELL LEVELS TO AVOID BACK-UP/SURCHARGE CONDITIONS TO PUBLIC/PRIVATE PROPERTY. (SEE SPEC. 01125). 7.LIFT STATION #10 - ADF= 490 GPM, PDF = 600 GPM, NIGHT FLOW ≤300 GPM, WETWELL STORAGE = 50,000 GAL. 8.LIFT STATION #11 - ADF = 90 GPM, PDF = 175 GPM, NIGHT FLOW ≤ 75 GPM, WETWELL STORAGE = 7,000 GAL. EXISTING PRE-TREATMENT BUILDING SCALE = 1"=20' MICHIGAN ROAD WWTP PARTIAL SITE PLAN NOT TO SCALE PHOTO 1 (LOOKING EAST) MA Y F L O W E R P A R K D R I V E PHOTO 1 NOTES: 1. REMOVE RAILING TO LIMITS SHOWN AND INSTALL MATING END CAPS AT POSTS. 2. INSTALL 2 ROWS S.S. SAFETY CHAIN W/ SNAP HOOKS & EYEBOLTS FROM POST TO POST. 3. MAINTAIN ACCESS TO STAIR/PLATFORM (COORDINATE LOCATION OF 20" FORCEMAIN ABOVE GRADE WITH OWNER) SEE PHOTO 1 NOTES KEYNOTES SCALE: 1/4"=1'-0"0 4'8'2'3 SECTION 1.20" FORCEMAIN (RESTRAINED JOINTS PER TABLE LIMITS) 2.20" M.J. PLUG VALVE (RESTRAINED JOINT) 3.20" D.I. PIPE (RESTRAINED JOINT) 4.20" M.J. D.I. 90° BEND (RESTRAINED JOINT) 5.20" D.I. PIPE; M.J. X FLG. 6.20" FLG. D.I. 90° BEND 7.20" FLG. D.I. PIPE 8.S.S. SAFETY CHAINS (SEE PHOTO 1) 9.20" D.I. PIPE SPOOL; FLG. X P.E. 10.CONCRETE THRUST BLOCKING (SEE DETAIL SHT.) 11.PIPE INSULATION & OUTER WRAP PER SPECS.; EXTEND DOWN TO 3 FT. BELOW GRADE. REFER TO ELECTRICAL DRAWINGS FOR HEAT TRACING. 12.S.S. PIPE SUPPORT (10 FT. MAX. SPACING) 13.1" SCH.80 PVC SAMPLE LINE (SEE PHOTO 2); EXPOSED EXTERIOR PIPING SHALL HAVE PIPE INSULATION AND OUTER WRAP PER SPECS. REFER TO ELECTRICAL DRAWINGS FOR HEAT TRACING. 14.1" SCH. 80 PVC "TRUE-UNION" BALL VALVE AND 90° BEND TO MOP SINK 15.1" S.S. CORP. STOP (PIPE INSULATION AND OUTER WRAP PER SPECS) 16.CORE DRILL, LINK SEAL & N/S GROUT BOTH SIDES FLUSH (EAST WALL) 6 4 C-14 SCALE: 1/4"=1'-0"0 4'8'2'4 SECTION 8 9 676 9 5 4312 3 C-14 6 7 6 NOT TO SCALE1DETAIL 10'-0"OUTSIDE FACE OF EXIST. BUILDINGB.O.P. STA. 0+00 LINE "FM-1" 10 C PIPE EL. = 884.67 L B/PIPE EL. = 905.00 (1 FT. BELOW GRATING) TO PRE-TREATMENT BUILDING FROM LS #11 FROM LS #10 NEW 8" PLUG VALVE SCALE: 1/4"=1'-0"0 4'8'2'2 INFLUENT WELL IMPR. PLAN 20" FORCEMAIN (LINE "FM-1") EXISTING FENCE (TEMP. REMOVE AND REINSTALL AS REQUIRED TO COMPLETE WORK) EXISTING FENCE (REMOVE AND REINSTALL AS REQUIRED TO COMPLETE WORK) 2 C-14 1 C-14 11 11 2'-0" 2'-0"2'-6"± 12" CLR. C/PIPE EL. = 908.00 L 12 12 2'-0" EXISTING 8" FORCEMAIN (REMOVE AS REQUIRED TO COMPLETE WORK) EXISTING 14" FORCEMAIN (REMOVE AS REQUIRED TO COMPLETE WORK) EXISTING 14" FORCEMAIN (REMOVE AND REINSTALL AS REQUIRED TO COMPLETE WORK) NEW 14" R.J.D.I. SOLID SLEEVE NEW 8" R.J.D.I. SOLID SLEEVE NOT TO SCALE PHOTO 2 SAMPLE ROOM 14 16 12 1615 13 14 13 PHOTO 2 NOTES: 1. RUN 1" SAMPLING LINE ALONG WALL IN NON-OBSTRUCTIVE MANNER TO MOP SINK IN SIMILAR ARRANGEMENT AS EXISTING SAMPLING LINES. PROVIDE S.S. WALL BRACKETS TO SECURE PIPING. CONTRACTOR SHALL CLOSE VALVE FOR LIFT STATION #10 & #11 FORCEMAIN PRIOR TO YARD PIPING WORK ACTIVITIES ON EACH RESPECTIVE FORCEMAIN (SEE DETAIL 1) C/PIPE EL. = 908.00 B/PIPE EL. = 905.00 (1 FT. BELOW GRATING) CORE HOLE THROUGH EXISTING FRP SOLID GRATING AND INSTALL S.S. FLASHING FLG. TO MATCH ODOR DUCT ENTRY. LOCATION OF 20" FORCEMAIN SHALL BE COORDINATED WITH OWNER TO MAINTAIN ACCESS TO STAIR/PLATFORM (SEE PHOTO 1) PH O T O M A T C H L I N E 11 EXIST. MAX WSE = 903.94 SB #1 NEW 14" PLUG VALVE NEW 8" R.J.D.I. 45° BEND NEW 14"X14"X8" R.J.D.I. TEE NEW 14" R.J.D.I. SOLID SLEEVE 9 0 0 899 898897896895894 8 9 9 8 9 8 CORE HOLE THROUGH EXISTING FRP SOLID GRATING AND INSTALL S.S. FLASHING FLG. TO MATCH ODOR DUCT ENTRY. LOCATION OF 20" FORCEMAIN SHALL BE COORDINATED WITH OWNER TO MAINTAIN ACCESS TO STAIR/PLATFORM (SEE PHOTO 1) NOTE: 1.CONTRACTOR SHALL COORDINATE WORK WITH CTRWD ODOR CONTROL CONTRACTOR WORKING AT MRWWTP SITE. IS S U E D F O R C O N S T R U C T I O N 8 5 0 85 5 W W W W W W W T T T T T T T W W W W W W W 851 8 5 1 PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 4 : 0 2 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 6 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m 14'-0" 10'-0" 2'-0" 4'-2" 5'-4" 5'-0"5'-0" SCALE: 3/8"=1'-0"0 4'6'2' VALVE VAULT UPPER PLAN SCALE: 3/8"=1'-0"0 4'6'2' VALVE VAULT LOWER PLAN NOTES: 1.VENT SHALL BE COMPRISED OF (1) 8" FLG. D.I. RETURN BEND ATTACHED TO 8" D.I. WALL PIPE W/COLLAR. BOTTOM OF RETURN BEND SHALL EXTEND 18" ABOVE TOP OF SLAB. OPEN END OF RETURN BEND SHALL RECEIVE 1/4" BRONZE SCREEN ATTACHED BY 1/2" FLG. FILLER. 2.IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY VALVE PLACEMENT WITH RESPECT TO HATCH OPENING ABOVE TO ENSURE THE HATCH IS INSTALLED CORRECTLY FOR THE EASY REMOVAL OF VALVES. 3.REFER TO SPEC. SECTION 03405 FOR PRECAST CONCRETE DESIGN REQUIREMENTS. 4.INSTALL NEW CONCRETE ACCESS DRIVE TO LIMITS SHOWN. SURFACE WATER SHALL NOT POND ON DRIVE. SEE DETAIL, SHEET C-17. 1.20" FLG. PLUG VALVE (ELECTRIC MOTOR OPERATED) 2.20" FLG. COUPLING ADAPTER 3.20" D.I. PIPE 4.PIPE TO VAULT RESILIENT CONNECTOR (TYP.) 5.PRECAST CONCRETE CURB WITH ACCESS HATCH AS NOTED HERE IN 6.20" PVC PIPE 7.6'-0"X4'-0" ALUM. ACCESS HATCH W/ SAFETY NETTING (HS-20 AASHTO RATED, ROUTE CHANNEL FRAME DRAIN LINE TO SUMP) - SEE KEYNOTE 32 FOR ADDITIONAL INFORMATION 8.3'-0"X3'-0" ALUM. ACCESS HATCH W/ SAFETY NETTING (HS-20 AASHTO RATED, ROUTE CHANNEL FRAME DRAIN LINE TO SUMP) 9.12"X12" FLG. D.I. TEE 10.12" FLG. PLUG VALVE (ELECTRIC MOTOR OPERATED) 11.12" FLG. COUPLING ADAPTER 12.12" D.I. PIPE 13.12" FLG. PLUG VALVE (MANUAL) 14.12" M.J. D.I. 45° BEND 15.12" PVC PIPE 16.SLOPED N/S GROUT FILL (6" @ H.P.; 1" @ L.P.) 17.1'-6" SQ. X 30" DEEP SUMP W/SUMP PUMP; INSTALL 1 1/2"Ø SCH. 80 PVC PIPE W/ PVC CHECK VALVE AND PVC BALL VALVE ON VERTICAL DISCHARGE PIPE INSIDE VAULT 18.20" D.I. PIPE; FLG. X P.E. 19.20"X20" M.J. D.I. TEE 20.12"X20" M.J. D.I. CONCENTRIC REDUCER 21.12" M.J. PLUG VALVE 22.D.I. FOSTER ADAPTOR 23.20" M.J.D.I. 45° BEND 24.20"X12" M.J. D.I. CROSS 25.ALUM. ACCESS LADDER W/ SAFETY-UP POST 26.VENT ASSEMBLY (SEE NOTE 1) 27.14"X12" M.J. D.I. REDUCER 28.12" D.I. PIPE; FLG. X P.E. 29.CONCRETE PIPE SUPPORT (SEE DETAIL, SHEET C-17) 30.1 1/2"Ø SCH. 80 PVC PIPE (SUMP PUMP DISCHARGE) TO FRENCH DRAIN; SEE KEYNOTE 17 FOR ADDITIONAL INFORMATION 31.1 1/2"Ø SCH. 80 PVC PIPE (ACCESS HATCH DRAIN, ROUTE IN UN-OBSTRUCTURING MANNER TO SUMP) 32.EXTERIOR WATERPROOFING MEMBRANE; CONSEAL CS-1800, OR APPROVED EQUAL. KEYNOTES 123 4 18 9 10 11 12 12 11 28 13 9 14 15 14 15 13 2817 19 3 20 12 21 22 12 14 15 3 24 22 22 14 15 25 7 8 26 1'-0" 1'-0" 13 29 29 SLO P E 12"FM FROM LS#2 FROM LS#2 FROM LS#2 1 2 " F M 1 2 " F M 20"FM 12"FM 12" F M FROM LS#8 TO MICHIGAN ROAD WWTP TO MICHIGAN ROAD WWTP 12"FM 12"FM 20"FM PRECAST CONCRETE VAULT PER ASTM C858 (HS-20 AASHTO RATED) 2'-6" 2'-0" 14'-0" 10'-0" 16 PROPOSED SANITARY SEWER EASEMENT W. 106TH STREET ACCESS DRIVE LOCATION COORDINATES MARK NORTHING EASTING DESCRIPTION A 1709868.08 182594.71 NW CORNER VAULT B 1709869.58 182570.21 CORNER DRIVE C 1709869.56 182594.22 CORNER DRIVE D 1709806.26 182594.17 CORNER DRIVE E 1709802.36 182599.17 CORNER DRIVE F 1709801.36 182599.17 CORNER DRIVE G 1709801.48 182565.15 CORNER DRIVE H 1709802.48 182565.15 CORNER DRIVE I 1709806.28 182570.17 CORNER DRIVE J 1709851.75 182607.04 SE CORNER VAULT VALVE VAULT (SEE PLANS AND SECTION, THIS SHEET) 2678 T/SLAB EL.850.00 T/SLAB & B/DRAIN EL. 841.00 EL. 843.00 12"/20" F.M. 11013 17 25 29 29 9 11 28 4 28 12 18 161616 FIN. GRADE EL. 851.00 SEE DETAIL 2, THIS SHEETSEE DETAIL 2, THIS SHEET NEW 20" FORCEMAIN (LINE "FM-1") NEW 12" FORCEMAIN (LINE "FM-2", SEE SHEET C-13) NOTE: SEE VALVE VAULT SITE PLAN THIS SHEET, FOR CONT. SCALE: 3/8"=1'-0"0 4'6'2'1 VALVE VAULT SECTION E.O.P. STA. 173+39 LINE "FM-1" (SEE SHEET C-13) SCALE: 1"=20'-0"0 20'40' VALVE VAULT SITE PLAN B 851.04 C D E FG I 852.76 M.E. 850.64 -- - - -- - - -- - - -- - - -- 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 AN D D E T A I L VA L V E V A U L T P L A N S , S E C T I O N S DS W DR C JA J CJ F NOTED C-16 CUT AND CAP EXISTING 14" H.D.P.E. FORCEMAIN NOT TO SCALE2DETAIL EXISTING 14" H.D.P.E. FORCEMAIN TO BE ABANDONED IN PLACE 853.79 H NOTE: TYPICAL EACH CONNECTION. WEST TIE-IN SHOWN (TYP. OF 2); EAST TIE-INS OPPOSITE HAND (TYP. OF 2) 15 5.FINISHED GRADE AROUND NEW/EXISTING STRUCTURES SHALL PROVIDE POSITIVE DRAINAGE RELIEF. 6.REFER TO ELECTRICAL DRAWINGS FOR SITE ELECTRICAL UPGRADES. 7.CONTRACTOR SHALL INSTALL TEMPORARY SILT FENCE AROUND ALL DISTURBED AREAS, INCLUDING STAGING AREAS. REFER TO SPEC. SECTION 02370 AND EROSION CONTROL DRAWINGS FOR REQUIREMENTS. 8.ALL DISTURBED AREAS SHALL BE FINE GRADED AND SEEDED PER SPEC. SECTION 02920. 9.ALL NEW FORCEMAINS THIS SHEET SHALL BE FULLY RESTRAINED AT EACH JOINT. 10.INSTALL FULL DEPTH GRANULAR BACKFILL FOR ALL FORCEMAIN PIPE AND SITE UTILITIES INSTALLED UNDER CONCRETE ACCESS DRIVE AND ASPHALT PATH. 11.INSTALL 3' X 3' X 7'-6" DEEP #8 STONE FRENCH DRAIN POCKET; WRAP WITH FILTER FABRIC (SEE DETAIL, SHEET C-18) T/SLAB EL. 838.50 C EL. 847.00 1 1/2"SD L 1 1 / 2 " S D STONE FRENCH DRAIN POCKET (SEE NOTE 11) 30 27 14 15 12"FM 12 " F M 12"FM ELECTRICAL CONTROL PANEL (SEE ELEC. DWGS.) 20 ' 75' 852.77 NEW CONCRETE ACCESS DRIVE PRECAST CONCRETE VAULT PER ASTM C858 (HS-20 AASHTO RATED) ELECTRICAL CONTROL PANEL (SEE ELEC. DRAWINGS) 54' 853.80 M.E. FROM LS#8 21 J A DUAL ARV (SEE DETAIL, SHEET C-19) NEW 12" FORCEMAIN NEW 12" FORCEMAIN (LINE "FM-3", SEE SHEET C-14) NEW 12" FORCEMAIN 852.75 23 6 TO MICHIGAN ROAD WWTP B.O.P. STA. 0+00 LINE "FM-2" (SEE SHEET C-13) B. O . P . S T A . 0 + 0 0 LI N E " F M - 3 " ( S E E SH E E T C - 1 4 ) EXISTING ARV (TO BE DEMOLISHED) 20 14 15 14 15 15 14 18" * * SHOWN OUT OF ROTATION NOTES: 1.NO CONSTRUCTION ACTIVITY, STORED MATERIAL, OR STORED EQUIPMENT ALLOWED BETWEEN TOWNE ROAD AND DITCH ROAD FROM AUGUST 26, 2016 THROUGH SEPTEMBER 12, 2016 (STA. 122+72±, LINE "FM-1" TO E.O.P. STA. 5+21±, LINE "FM-2" / E.O.P. STA. 7+13, LINE "FM-3", SEE SPEC. 01125). T/HATCH EL.851.16 WATER TIGHT JOINT; DOWEL CONCRETE CURB INTO VALVE VAULT T/SLAB. 5 5 31 31 31 5 1 C-16 21 NOTE: ALL EXTERNAL JOINTS SHALL BE WRAPPED WITH POLYOLEFIN BACKED EXTERIOR JOINT WRAP; MODEL CS-212 AS MANUFACTURED BY CONSEAL, OR APPROVED EQUAL. 25 LF OF ASPHALT PATH REPLACEMENT (METHOD "F") 55 LF OF ASPHALT PATH REPLACEMENT (METHOD "F") CONTROL JOINT (TYP) 32 IS S U E D F O R C O N S T R U C T I O N 1.25 D + 12" MIN. EX. PVMT. COMPACTED BACKFILL (SEE SPEC. 02300) (COMMON FILL) MORE THAN 5' TO EOP D CONDITION WITHIN 60 DAYS RESTORE SURFACE TO ORIGINAL NO. 8 STONE EXISTING SURFACE D D MATCH EXISTING SURFACE THICKNESS 6" MIN. CONC. DRIVEWAY (MATCH EXISTING) 4" NO. 53 STONE 412" MIN. ASPHALT DRIVEWAY (MATCH EXISTING) CONSISTING OF: 112" HMA-SURFACE COURSE MIN. 3" HMA-BINDER COURSE MIN. 6" NO. 53 STONE D TACK COAT 112" HMA SURFACE MIN.(MATCH EXISTING) 12" MIN. 4,000 PSI CONCRETE (MATCH EXISTING) 12" MIN. NOTE: DOWEL BARS INTO EXISTING CONCRETE (TYP) EXISTING PAVEMENT CONCRETE (MATCH EXISTING; 12" MIN) 112" HMA SURFACE MIN. (MATCH EXISTING) NOTE: DOWEL BARS INTO EXISTING CONCRETE (TYP) EXISTING CONCRETE CONCRETE (MATCH EXISTING; 12" MIN.) TACK COAT #5 BARS @ 12" O.C. #4 BARS CONTINUOUS (AS SHOWN) #4 BARS CONTINUOUS (AS SHOWN) #5 BARS @ 12" O.C. 6" NO. 53 STONE SAW CUT EDGE WITH SEALER (1 1/2" MIN.) D PVC SDR 35 PIPE LARGER DIA. THAN REPLACED FIELD TILE. SEWER PIPE CRUSHED STONE OR FINE GRAVEL 12" MIN. FIELD TILE BEDDING / BACKFILL / PAVEMENT REPLACEMENT METHODS *GRANULAR BACKFILL AND PIPE BEDDING REQUIRED FOR TRENCHES LESS THAN 5 FEET FROM EDGE OF PAVEMENT NO. 8 STONE NO. 8 STONE NO. 8 STONE 6" NO. 53 STONE NOT TO SCALE DETAIL - OPEN TERRAIN - METHOD "A" NOT TO SCALE DETAIL - CONCRETE SIDEWALKS - METHOD "B" NOT TO SCALE DETAIL - ASPHALT & CONCRETE DRIVES METHOD "C" NOT TO SCALE DETAIL - ASPHALT ROADS - METHOD "D" NOT TO SCALE DETAIL - CONCRETE ROADS - METHOD "E" NOT TO SCALE DETAIL - FIELD DRAIN REPLACEMENT 4" MIN. 4,000 PSI CONCRETE (6" MIN. ACROSS DRIVEWAYS; MATCH EXISTING) REFER TO EMBEDMENT DETAIL THIS SHEET NOT TO SCALE DETAIL - ASPHALT PATH-METHOD "F" PREPARED SUBGRADE COMPACTED IN ACCORDANCE WITH SECTION 207.02 OF STANDARD INDOT SPECS. 1" - 110#/SYD. HMA BITUMINOUS SURFACE 9.5MM ON 3" - 330#/SYD. HMA BITUMINOUS INTERMEDIATE 19.0MM ON 5" COMPACTED AGGREGATE #53 STONE ON COMPACTED SUBGRADE/ FULL DEPTH NO. 8 STONE BACKFILL * WIDTH OF RECREATIONAL ASPHALT PATH AS DESIGNATED BY CARMEL ALTERNATIVE TRANSPORTION PLAN 1 2 3 4 4 3 2 1 * PATH WIDTH (MATCH EXISTING) 4" NO. 53 STONE SAW CUT BOTH SIDES OF TRENCH (1-1/2" MIN.); SEAL JOINTS SAW CUT BOTH SIDES OF TRENCH (1-1/2" MIN.); SEAL JOINTS 12 " 12" MIN. FLOWABLE FILL (CITY OF CARMEL) SAW CUT BOTH SIDES OF TRENCH (1-1/2" MIN.); SEAL JOINTS 6" NO. 53 STONE NO. 8 STONE FLOWABLE FILL (CITY OF CARMEL) NOT TO SCALE DETAIL - ROLLED CURB AND GUTTER 6 3 / 4 " 10 " 18" R 1.25 D + 12" MIN.1.25 D + 12" MIN. 1.25 D + 12" MIN.1.25 D + 12" MIN. COMPACTED BACKFILL (SEE SPEC. 02300) (COMMON FILL) (NO MOUNDING/HEAPED BACKFILL ALLOWED) RESTORE SURFACE TO ORIGINAL CONDITION WITHIN 60 DAYS REFER TO EMBEDMENT DETAIL THIS SHEET REFER TO EMBEDMENT DETAIL THIS SHEET REFER TO EMBEDMENT DETAIL THIS SHEET REFER TO EMBEDMENT DETAIL THIS SHEET REFER TO EMBEDMENT DETAIL THIS SHEET COMPACTED BACKFILL 3" TOP SOIL 24" MIN. 6" CLASS A CONCRETE 6" MIN. (BELOW BELL) BEDDING: No. 8 CRUSHED STONE, BELL HOLE EXCAVATED FINAL BACKFILL: REFER TO METHODS A-H HAUNCHING: COMPACTED No. 8 CRUSHED STONE INITIAL BACKFILL: COMPACTED No. 8 CRUSHED STONE 12 " 7" MIN. (BELOW BARREL) 1/2 O.D. 1/2 O.D. D 1.25D + 12" (MIN. TYP.) NOT TO SCALE DETAIL - STANDARD SEWER TRENCH EMBEDMENT MINIMUM WIDTH = NOT TO SCALE DETAIL - RCP STORM SEWER PIPE TRENCH 1.25(OD) + 12" 1/2 O.D. + 6" MIN. 1/2 O.D. 4" MIN BELOW PIPE BARREL #8 CRUSHED STONE TAMPED OR WALKED INTO PLACE TO 1/2 O.D. + 6" RCP STORM PIPE #8 CRUSHED STONE TAMPED OR WALKED INTO PLACE TO 1/2 O.D. #8 CRUSHED STONE BELL HOLE EXCAVATED CLEAN NATIVE BACKFILL OR COMPACTED GRANULAR BACKFILL UNDER AREAS TO BE PAVED NOT TO SCALE DETAIL-CONCRETE CURB 13 1 / 2 " 6" 6" 1" R CURB AND GUTTER 24" 7 1 / 2 " 3" TOP SOIL NOT TO SCALE DETAIL- VALVE VAULT SITE CONCRETE PAVING SUBGRADE TREATMENT TYPE IIIA PER INDOT SPECIFICATIONS SECTION 207 8" PCCP PER INDOT SPECIFICATIONS SECTION 502 6" BASE COURSE (INDOT #53 STONE, COMPACTED) NOT TO SCALE DETAIL - CONCRETE DRIVE (VALVE VAULT SITE) 5' 5'5' 1' CONCRETE PAVING (SEE DETAIL THIS SHEET) 20' MAX 12' MIN COMPACTED BACKFILL 2" RADIUS 6 3 / 4 " 3 4" 18" NOTE: DISTURBED SECTION OF PATH SHALL BE REPAIRED WITHIN 30 DAYS AFTER DISTURBANCE OF SECTION IS COMPLETE. (NO MOUNDING/HEAPED BACKFILL ALLOWED) EXISTING EDGE OF ROAD PAVEMENT EXISTING ASPHALT EXISTING ASPHALT EXISTING CONCRETEEXISTING ASPHALT PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 4 : 0 3 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 7 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m -- - - -- - - -- - - -- - - -- 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 ST A N D A R D D E T A I L S DS W DR C JA J CJ F NOT TO SCALE C-17 IS S U E D F O R C O N S T R U C T I O N CARRIER PIPE STEEL CASING PIPE 1' MAX. 6'-7' MAX. BETWEEN SPACERS CASING SPACER MAX. OF ONE FOOT FROM EACH SIDE JOINT ENDSEAL EACH END UTILITY PIPE PER PLANS GRADE PER PLAN STEEL CASING PIPE LENGTH TO BE BORED GRADE PER PLAN 18" MIN. OR 12 DIA. OF PIPE OR CASING, WHICHEVER IS GREATER STEEL CASING PIPE UTILITY LINE (CARRIER PIPE) CASING END SEAL (BOTH SIDES OF CASING) PER PLANS SECTION PER PLANS BELL RESTRAINTS NOT TO SCALE TYPICAL BORE AND JACK DETAIL RESTRAINED JOINT NOTES LENGTH IN FT. TO BE RESTRAINED ON EACH SIDE OF FITTING FOR 12" PVC PIPE 11-LOWER 28-UPPER 35 15 23-LOWER 58-UPPER 6-LOWER 14-UPPER 7 4 DEADEND 1.CONTRACTOR SHALL INSTALL RJDI FITTINGS FOR ALL HORIZONTAL AND VERTICAL BENDS. CONCRETE THRUST BLOCKING IS STRICTLY PROHIBITED. 2.RESTRAINED LENGTHS WERE CALCULATED ASSUMING A 2 FACTOR OF SAFETY, TYPE 5 TRENCH CONDITION, "CL" SOIL CLASSIFICATION, 4 FT. DEPTH OF BURY, AND 150 PSI HYDROSTATIC TEST PRESSURE (SOURCE: EBAA IRON THRUST RESTRAINT PROGRAM v7.0) 3.ALL FORCEMAIN APPURTENANCES, INCLUDING VALVES, WITHIN RJDI LIMITS MUST BE RESTRAINED AT EACH JOINT. AT MINIMUM, THE NEXT JOINT EACH WAY FROM A FITTING (INCLUDING HORIZONTAL DIRECTIONAL DRILL TRANSITION COUPLINGS) SHALL BE RESTRAINED. 4.ALL SITE PIPING SHALL BE FULLY RESTRAINED AT EACH APPURTENANCE AND JOINT. 5.20"X12" REDUCER SHALL BE RESTRAINED 98' ON LARGE SIDE 6.SEE ENGINEER FOR SIZE(S) NOT LISTED. SECTION B-B B 18" MIN. EXISTING UTILITY EXISTING UTILITY 3" B 3" OF PIPE, 12" MIN. DIA. OF BELL OUTSIDE 12" 3" 2" BELL OF EXISTING UTILITY CAST AGAINST UNDISTURBED SOIL A A O.D. + 6" SECTION A-A (BEYOND) EXISTING UTILITY BEDDING O.D. 3" O.D./4 8" MIN. O. D . 1. PROVIDE UTILITY SUPPORT WHEN "D" IS LESS THAN 12 INCHES "D" IS LESS THAN 18 INCHES. SUPPORT WHEN "D" PROVIDE UTILITYNOTE: "D" NOTES: 2. EXISTING UTILITIES SHALL MEAN: STEEL GAS MAINS, SANITARY SEWER PIPING, STORM SEWER PIPING, ETC. ELECTRIC/TELEPHONE CONDUITS, FIBER OPTIC BANKS, NOT TO SCALE DETAIL - UTILITY CROSSING SUPPORT NOT TO SCALE RESTRAINED JOINT TABLES 3000 PSI CONCRETE 3000 PSI CONCRETE W/ #6 @ 6" O.C. (2 BARS MIN.) 97 90° BEND 45° BEND 22 1/2° BEND 11 1/4° BEND LENGTH IN FT. TO BE RESTRAINED ON EACH SIDE OF FITTING FOR 20" PVC PIPE 17-LOWER 45-UPPER 54 23 36-LOWER 92-UPPER 9-LOWER 22-UPPER 11 6 DEADEND 156 TYPE OF FITTING HORIZ. BEND VERT. BEND TEE W/ 20" BRANCH 90° BEND 45° BEND 22 1/2° BEND 11 1/4° BEND TYPE OF FITTING HORIZ. BEND VERT. BEND 10' MIN.10' MIN. GRADE TO P O F BA N K 60" MIN. (SEE NOTE 1) STREAM SEWER MAIN TO P O F BA N K NO OPEN CUT CONSTRUCTION PERMITTED IN THIS AREA DIRECTIONAL DRILL PAY LIMIT DEFINED ON PLANS DIRECTIONALLY DRILLED SEWER MAIN NOTE: 1:DEPTH MAY EXCEED 60"; REFER TO PLAN SHEETS FOR EXACT DEPTH NOT TO SCALE TYPICAL STREAM CROSSING 54" MIN.54" MIN. PROPOSED FORCEMAIN PROPOSED FORCEMAIN PROPOSED FORCEMAIN PROPOSED FORCEMAIN 147 #8 STONE NOT TO SCALE DETAIL - STONE FRENCH DRAIN POCKET FILTER FABRIC WRAP VALVE VAULT SITE CONCRETE PAVING (SEE DETAIL, SHEET C-17) 3'- 6 " 3'-0" 18" MIN. WATER MAIN AND SEWER MINIMUM SEPARATION: 18" VERTICAL SEPARATION 10'-0" HORIZONTAL SEPARATION WATER MAIN QUALITY PIPE TO BE USED FOR SANITARY OR STORM SEWER IF REQUIRED SEPARATION CANNOT BE MET NOT TO SCALE MINIMUM CROSSING & SEPARATION REQUIREMENTS FOR SANITARY SEWER PIPE SANITARY OR STORM SEWER MAIN WATER MAIN WATER MAIN SANITARY OR STORM SEWER MAIN CENTER OF SEWER MAIN LAYING LENGTH CENTER OF SEWER MAIN LAYING LENGTH 45° MIN.CROSSING ANGLE 4' - 0 " 1 1/2" SUMP DISCHARGE LINE 12" TOPSOIL 1'-0" NOT TO SCALE DETAIL-THRUST BLOCKING FOR PIPES VERTICAL BEND (11.25° to 90°) 3,000 PSI CONCRETE 36" 2 4 " 1/4" X 3" S.S. STRAP DRILLED TO ACCOMMODATE ANCHOR BOLTS 3/4" DIA S.S. ANCHOR BOLTS, THREADED W/NUTS 3/4" DIA TIE BAR 9" NOTES: 1. DETAIL APPLIES TO 20" 90° VERTICAL BEND AT MRWWTP (REF. SHT. C-14, KEYNOTE 10). 2. VERTICAL BEND BLOCKING TO BE FULL WIDTH OF TRENCH. 3. DEPTH MAY BE GREATER THAN SPECIFIED 24" TO ALLOW WORKING SPACE. BLOCKING MUST BE PLACED AGAINST UNDISTURBED EARTH. NOT TO SCALE DETAIL - TYPICAL CONCRETE PIPE SUPPORT DETAIL EL. VARIES NOTES: 1.SUPPORT TO BE 12" THICK. (U.O.N.) 2.COORDINATE LOCATION OF PIPE SUPPORTS WITH OTHER SHEETS AND SPECIFICATIONS. 2-#6 EACH END #4 TIE AT 12" E.F. (MIN. 3) #6 AT 12" EF W/STD HOOK 120° PIPE DIA. VARIES SEE PLAN STRAPS AS REQ'D C PIPE AND SUPPORTL PIPE OD 6" (TYP.) 2" CLR. (TYP.) BLDG. PAPER ON ALL PIPE SUPPORTS ANCHOR BOLTS AS REQ'D EL. SEE PLAN STD. HOOK L=PIPE OD +12" 1.END SECTIONS SHALL CONFORM TO ALL APPLICABLE REQUIREMENTS AS SET OUT IN THE INDOT STANDARD SPECIFICATIONS. 2.IF AN EXISTING CMP STORM CULVERT IS REMOVED OR DAMAGED, IT SHALL BE REPLACED WITH 18" RCP STORM CULVERT WITH RCP END SECTIONS. NOT TO SCALE DETAIL - DRIVEWAY CULVERT & END SECTION T DI A T Y Y R2 T DI A T 9" PLAN LONGITUDINAL SECTION SECTION Y-Y SLOPE DETAIL 3:1 F I L L S L O P E 4:1 FIL L S L O P E CO N C R E T E EN D S E C T I O N PIPE CULVERT DIA R1 A T DI A T T A C B=(D-C) D DIA. 12 T A B C D R-1 15 18 21 24 27 30 33 36 42 48 54 60 66 72 78 84 2 2-1/4 2-1/2 2-3/4 3 3-1/4 3-1/2 3-3/4 4 4-1/2 5 5-1/2 6 6-1/2 7 7-1/2 8 4 6 9 9 9-1/2 10-1/2 12 13-1/2 15 21 24 27 30 24 34 24 24 24 27 27 35 43-1/2 48 54 58-1/2 63 63 72 65 60 78 78 78 78 48-7/8 46 46 38 30 25-1/2 19-3/4 39-1/4 34-3/4 35 26 35 39 21 21 21 21 72-7/8 73 73 73 73-1/2 73-1/2 73-3/4 97-3/4 97-3/4 98 98 100 99 99 99 99 99 10-1/16 12-1/2 15-1/2 16-1/8 16-11/16 17-3/4 18-5/16 23-3/4 24-1/16 27-1/4 28-1/8 32-7/8 36-3/4 35-11/16 38-5/8 41-15/16 44-13/16 R-2 9 11 12 13 14 14-1/2 15 17-1/2 20 22 22 24 24 24 24 24 24 CONC. BLOCKING & ANCHOR STRAPS 18" MIN. LAYING LENGTH 2 OR 3-PIECE VALVE BOX (COVER MARKED "SEWER") FIN. GRADE 54 " M I N . U . N . O . VALVE SEWER MAIN 2'-0" X 2'-0" X 8" CONCRETE PAD NOT TO SCALE DETAIL - TYPICAL VALVE SETTING PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 4 : 0 3 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 8 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m -- - - -- - - -- - - -- - - -- 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 ST A N D A R D D E T A I L S DS W DR C JA J CJ F NOT TO SCALE C-18 IS S U E D F O R C O N S T R U C T I O N 1" 2"-12" 1/2" 24" INSIDE D I A M E T E R A A KENT SEAL BUTYL RUBBER COATING WITH PLASTIC WRAP COVER Note: No more than 12" of adjustment rings Anything above 12" a barrel section must be added PRECAST CONCRETE ADJUSTING RING OR FLANGE OF CASTING 30 1/2" OUTSIDE DIAMETER 24" INSIDE DIAMETER 1/4" (TYPICAL) 1/4" (TYPICAL) 30 1/8" OUTSIDE DIAMETER RISER RING THICKNESS 4" - 12" OUTSIDE DIAMETER 34" OR 36" 5/8" NOT TO SCALE DETAIL - ADJUSTING RING PLAN VIEW JOINT DETAIL SECTION A-A VA R I E S (2) SUPPORT BLOCKS (12" MINIMUM) 6" MIN. MANHOLE OUTSIDE DIAMETER + 1' FOR PRE-CAST 3" MINIMUM 6' - 0 " M I N I M U M 3/8" X 3" STAINLESS STEEL ANCHOR BOLTS S.S. TAPPING SLEEVE ALL JOINTS SHALL BE SEALED BY AN O-RING GASKET PLUS 1/2" OR 3/4" CTRWD APPROVED FLEXIBLE BUYTL RESIN CONCRETE SEALANT (ROPE) CONFORMING TO ASTM C 990. COMPOSITION AND THICKNESS OF MATERIAL SHALL BE DEPENDENT ON SEASON OF INSTALLATION AND AS DIRECTED BY ENGINEER. CONTRACTOR SHALL GROUT ALL INTERNAL MANHOLE JOINTS WITH NON-SHRINK GROUT. 1022Z1GS R-1772 SELF SEALING EAST JORDAN NEENAH MANHOLE CASTING SCHEDULE MANUFACTURER THESE SECTIONS AVAILABLE IN 16", 32" & 48" LENGTH TO MEET REQUIRED DEPTH AIR/VACUUM RELEASE VALVE AS APPROVED BY CTRWD. FOR AIR ONLY, ADD CHECK VALVE PRIOR TO FLUSHING CONNECTION. 6" MINIMUM CRUSHED #8 STONE MAT FOR LEVELING AND SUPPORT. #2 STONE AS REQUIRED BY ENGINEER FOR UNSTABLE SOIL CONDITIONS - DEPTH TO STABLE GROUND PER ENGINEER. MANHOLE BASE AND RISER ARE ONE MONOLITHIC PRECAST CONCRETE UNIT. #10 Copperhead, HS-CCS, HDPE 30 mil INSULATED TRACER WIRE TO BE BROUGHT THROUGH AND TIED OFF TO TOP STEP 3" SS FLG. BALL VALVE NO CORE WILL BE PERMITTED WITHIN 6" OF INTERNAL OR EXTERNAL JOINTS. ALL STEPS MUST BE ALIGNED VERTICALLY IN A STRAIGHT LINE. FINISHED GRADE (SLOPE AWAY FROM CASTING) NOTES: 1.FORCE MAIN TO BE LOCATED SUCH THAT AIR/VACUUM DOES NOT INTERFERE WITH ACCESS OPENING. 2.TOP OF CASTING SHALL EXTEND 0.20 FEET MINIMUM ABOVE FINISHED GRADE. 3.MANHOLE SECTIONS SHALL CONFORM TO ASTM C 478 UTILIZING 4,000 PSI CONCRETE. JOINTS SHALL CONFORM TO ASTM C 443. FOUR (4) FOOT DIAMETER MANHOLE FOR 6" FORCEMAIN OR SMALLER, OR FIVE (5) FOOT DIAMETER MANHOLE FOR 8" FORCEMAIN OR LARGER. CASTING SHALL BE EITHER SELF-SEALING. (SEE MANHOLE CASTING SCHEDULE FOR CASTING TYPE). LIDS SHALL BE STAMPED "SANITARY SEWER" AND HAVE CLOSED PICKHOLES. FRAME SHALL BE SET ON DOUBLE ROW OF 1/2" KENT SEAL, OR SINGLE ROW OF 1" KENT SEAL (SEE MANHOLE CASTING SCHEDULE). MA X I M U M TY P I C A L 1 6 " SCALE: 1"=5'-0"0 5'10' DETAIL - CLOSED BOTTOM AIR/VACUUM RELEASE MANHOLE POLYPROPYLENE FLUSHING CONNECTION 6" MIN. REINFORCING STEEL PER ASTM C478 MANHOLE FRAME AND COVER 1% SLOPE 6" MIN EXTERIOR WATERPROOFING MEMBRANE; CONSEAL CS-1800, OR APPROVED EQUAL POLYOLEFIN BACKED EXTERIOR JOINT WRAP; CONSEAL CS-212, OR APPROVED EQUAL (TYP) C B A A B C TRAFFIC TAPER 100 FT. MAX ONE LANE TWO-WAY TRAFFIC TAPER 100 FT. MAX WORK VEHICLE FOR HIGH SPEED URBAN CONDITIONS * A=350 FT. B=350 FT. C=350 FT. L=350 FT. NOTES: 1.NOTE: TRAFFIC CONTROL PLANS ARE GUIDELINES ONLY. ALL TRAFFIC CONTROL PLANS AND LANE CLOSURES MUST BE APPROVED BY THE OWNER AND APPROPRIATE AGENCY. 2.FOR LOW-VOLUME SITUATIONS WITH SHORT WORK ZONES ON STRAIGHT ROADWAYS WHERE THE FLAGGER IS VISIBLE TO ROAD USERS APPROACHING FROM BOTH DIRECTIONS, A SINGLE FLAGGER, POSITIONED TO BE VISIBLE TO ROAD USERS APPROACHING FROM BOTH DIRECTIONS, MAY BE USED. 3.THE "UTILITY WORK AHEAD" AND THE "END UTILITY WORK" SIGNS MAY BE OMITTED FOR SHORT-DURATION OPERATIONS IF APPROVED BY OWNER. 4.FLASHING WARNING LIGHTS AND/OR FLAGS MAY BE USED TO CALL ATTENTION TO THE ADVANCE WARNING SIGNS. A "BE PREPARED TO STOP" SIGN MAY BE ADDED TO THE SIGN SERIES. 5.THE BUFFER SPACE SHOULD BE EXTENDED SO THAT THE TWO-WAY TRAFFIC TAPER IS PLACED BEFORE A HORIZONTAL (OR CREST VERTICAL) CURVE TO PROVIDE ADEQUATE SIGHT DISTANCE FOR THE FLAGGER AND A QUEUE OF STOPPED VEHICLES. 6.AT NIGHT, FLAGGER STATIONS SHALL BE ILLUMINATED, EXCEPT IN EMERGENCIES. 7.WHEN USED, THE "BE PREPARED TO STOP" SIGN SHOULD BE LOCATED BETWEEN THE "FLAGGER" SIGN AND THE "ONE LANE ROAD" SIGN. 8.PROVIDE UTILITY WORK SIGNAGE WHEN WORKING IN RIGHT-OF-WAY, BUT NOT CLOSING ROAD OR LANE. WORK AREA FOR LOW SPEED URBAN CONDITIONS * A=100 FT. B=100 FT. C=100 FT. L=350 FT. * SPEED CATEGORY SHALL BE DETERMINED BY HIGHWAY AGENCY FLAGGER FLAGGER NOT TO SCALE DETAIL - TRAFFIC CONTROL PLAN (AT TWO LANE ROAD) WORK AREA NOT TO SCALE DETAIL - PATH/SIDEWALK CLOSED PATH/SIDEWALK 400 FT 100 FT 400 FT 100 FT HEAVY DUTY MANHOLE FRAME AND COVER (ABOVE) FORCEMAIN COMBINATION AIR RELEASE VALVE PER SPECS. (TYP.) 2'- 0 " CL E A R 2'-0" MANHOLE STEPS PER SPECS. NOT TO SCALE DETAIL - DUAL AIR RELEASE VALVES AND STRUCTURE PLAN 1 C-35 5'-0" X 5'-0" PRECAST VAULT STRUCTURE PER ASTM C478 (6'-0" MIN. INSIDE DEPTH) HEAVY DUTY MANHOLE FRAME AND COVER 5'-0" X 5'-0" PRECAST VAULT STRUCTURE PER ASTM C858 H-2O AASHTO RATED #8 STONE DRAINAGE FILL MIN. 6" BELOW STRUCTURE FORCEMAIN PIPE WITH S.S. TAPPING SLEEVE (TYP.) COMBINATION AIR RELIEF VALVE PER SPECS. (TYP.) 2'-0" NOT TO SCALE1SECTION 3" SS FLG. BALL VALVE UNDISTURBED EARTH 6' - 0 " M I N . VA R I E S 6" MIN 6" MIN 3" MINIMUM MANHOLE OUTSIDE DIAMETER + 1' FOR PRE-CAST REINFORCING STEEL PER ASTM C858 #2 STONE AS REQUIRED BY ENGINEER FOR UNSTABLE SOIL CONDITIONS - DEPTH TO STABLE GROUND PER ENGINEER 6" MINIMUM CRUSHED #8 STONE MAT FOR LEVELING AND SUPPORT MANHOLE BASE AND RISER ARE ONE MONOLITHIC PRECAST CONCRETE UNIT MA X I M U M TY P I C A L 1 6 " ALL STEPS MUST BE ALIGNED VERTICALLY IN A STRAIGHT LINE NO CORE WILL BE PERMITTED WITHIN 6" OF INTERNAL OR EXTERNAL JOINTS ALL JOINTS SHALL BE SEALED BY AN O-RING GASKET PLUS 1/2" OR 3/4" CTRWD APPROVED FLEXIBLE BUYTL RESIN CONCRETE SEALANT (ROPE) CONFORMING TO ASTM C 990. COMPOSITION AND THICKNESS OF MATERIAL SHALL BE DEPENDENT ON SEASON OF INSTALLATION AND AS DIRECTED BY ENGINEER. CONTRACTOR SHALL GROUT ALL INTERNAL MANHOLE JOINTS WITH NON-SHRINK GROUT. #10 COPPERHEAD, HS-CCS, HDPE 30 MIL INSULATED TRACER WIRE TO BE BROUGHT THROUGH AND TIED OFF TO TOP STEP PLOYPROPYLENE FLUSHING CONNECTION THESE SECTIONS AVAILABLE IN 16", 32" 48" LENGTH TO MEET REQUIRED DEPTH FINISHED GRADE 3/8"X3" STAINLESS STEEL ANCHOR BOLTS NOTES: 1.FORCE MAIN TO BE LOCATED SUCH THAT AIR/VACUUM DOES NOT INTERFERE WITH ACCESS OPENING. 2.TOP OF CASTING SHALL EXTEND 0.25 INCHES BELOW FINISHED GRADE OF ACCESS DRIVE (DRIVE SHALL SLOPE AWAY FROM CASTING). 3.MANHOLE SECTIONS SHALL CONFORM TO ASTM C858 UTILIZING 4,000 PSI CONCRETE. JOINTS SHALL CONFORM TO ASTM C 443. CASTING SHALL BE EITHER SELF-SEALING. (SEE MANHOLE CASTING SCHEDULE FOR CASTING TYPE). LIDS SHALL BE STAMPED "SANITARY SEWER" AND HAVE CLOSED PICKHOLES. FRAME SHALL BE SET ON DOUBLE ROW OF 1/2" KENT SEAL, OR SINGLE ROW OF 1" KENT SEAL (SEE MANHOLE CASTING SCHEDULE). 1% SLOPE 6" MIN (2) SUPPORT BLOCKS (12" MINIMUM) POLYOLEFIN BACKED EXTERIOR JOINT WRAP; CONSEAL CS-212, OR APPROVED EQUAL (TYP.) EXTERIOR WATERPROOFING MEMBRANE; CONSEAL CS-1800, OR APPROVED EQUAL PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 4 : 0 3 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 1 9 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m -- - - -- - - -- - - -- - - -- 43 8 8 CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N MAY 2016 ST A N D A R D D E T A I L S DS W DR C JA J CJ F NOT TO SCALE C-19 IS S U E D F O R C O N S T R U C T I O N FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM NOT TO SCALE EROSION CONTROL PLAN NOTE: DURING ALL PHASES OF CONSTRUCTION, THE SITE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS SHALL EXERCISE MEASURES TO PREVENT THE EROSION OF SOILS DUE TO THE ACTION OF WATER AND WIND. THE CONTRACTORS SHALL USE THE FOLLOWING MEASURES TO ACCOMPLISH THIS OBJECTIVE: A. SURFACE PREPARATION 1.CLEARING SHALL BE LIMITED SO AS TO EXPOSE THE SMALLEST POSSIBLE AREA OF LAND FOR THE SHORTEST POSSIBLE TIME. 2.EXPOSED AREAS SHALL BE IMMEDIATELY GRADED AND PROTECTED WITH TEMPORARY OR PERMANENT COVER, SUCH AS SOD, SEED AND MULCH, CROWN VETCH, LESPEDEZA, OR CREEPER. NEWLY-GRADED CHANNELS OR STEEP SLOPES WILL REQUIRE THE USE OF FIBROUS MATTING, NETTING OF SEEDED AND MULCHED AREAS, OR THE STAKING OR SHINGLING OF SOD WHILE VEGETATION IS BECOMING ESTABLISHED. B. RUN-OFF CONTROL 1.LONG AND/OR STEEP SLOPES WILL REQUIRE CONTOUR BENCHING AND FURROWING, OR BERMS TO REDUCE RUN-OFF VELOCITIES. C. SOIL MOISTURE 1.THE CONTRACTOR SHALL HAVE AVAILABLE ON THE CONSTRUCTION SITE A WATER SOURCE CAPABLE OF APPLYING WATER TO DRY EXPOSED SOIL IN ORDER TO PREVENT WIND EROSION. THE APPLICATION RATE AND MANNER SHALL BE SUCH THAT SOIL MOISTURE IS ATTAINED AND NO SURFACE RUN-OFF IS CREATED. D. RESPONSIBILITY 1.THE CONTRACTOR SHALL BE HELD RESPONSIBLE UNTIL THE CERTIFICATE OF COMPLETION IS ISSUED. EROSION CONTROL PLAN: NOT TO SCALE1DETAIL - WWTP SITE PROPOSED INLET PROTECTION LEGEND SILT FENCE NOTES: 1.NOT ALL EROSION CONTROL REQUIREMENTS MAY BE SHOWN ON THIS SHEET. REFER TO SPEC. SECTIONS 02370 AND APPENDIX B FOR REQUIREMENTS. 2.CONTRACTOR SHALL REPAIR/REPLACE ANY DAMAGED SIDEWALK OR CURB TO NEXT JOINT AS A RESULT OF CONSTRUCTION ACTIVITIES. NOT TO SCALE2DETAIL PROPOSED FORCEMAIN SILT FENCE 10' MAX. NOTE: SILT FENCE INSTALLATION APPLIES TO ALL OPEN CUT LOCATIONS. C-20 N.T.S. CJ F JA J DR C DS W ER O S I O N C O N T R O L P L A N MAY 2016 PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T 43 8 8 -- -- - - -- - - -- - - -- - - PROPOSED TEMPORARY SOIL STOCKPILE AREA PROPOSED TEMPORARY STAGING AREA NOTE: ALL INLETS ALONG THE FORCEMAIN SIDE OF 106TH STREET SHALL HAVE INLET PROTECTION INSTALLED. TEMPORARY ROCK CONSTRUCTION ENTRANCE SF 2 C-20 PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 4 : 0 4 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 2 0 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m NEW VALVE VAULT (SEE SHEET C-16) MICHIGAN ROAD WWTP (SEE SHEET C-14) 20" FORCEMAIN (LINE "FM-1") 20" FORCEMAIN (LINE "FM-1") 20" FORCEMAIN (LINE "FM-1") NOT TO SCALE3DETAIL - VALVE VAULT SITE 1 C-20 3 C-20 W. 106TH STREET MA Y F L O W E R P A R K D R I V E W. 106TH STREET U . S . 4 2 1 ( M I C H I G A N R O A D ) SH E L B O U R N E R O A D TO W N E R O A D DI T C H R O A D LA N E CR O O K E D S T I C K TO R R E Y PINE S C I R C L E LO N D O N B E R R Y BO U L E V A R D KI N G S M I L L D R I V E IR O N H O R S E L A N E GR E E N T R E E D R . FE R G U S A V E . CO N N A U G H T D R . ST E E P L E C H A S E D R . WA L N U T C R E E K R D . WES T O N D R I V E C O M M E R C E D R . W A L N U T C R E E K D R . W O R K O U T W A Y NO T T I N G H A M W A Y DE A N D R A D R I V E MA Y F L O W E R P A R K D R . WI N D E M E R E BO U L E V A R D CO P P E R G A T E SPRI N G M I L L R U N MA T C H L I N E MA T C H L I N E SE E T H I S S H E E T SE E T H I S S H E E T MA T C H L I N E MA T C H L I N E SE E T H I S S H E E T SE E T H I S S H E E T W. 106TH STREET NOTE: ALL INLETS ALONG THE FORCEMAIN SIDE OF 106TH STREET SHALL HAVE INLET PROTECTION INSTALLED. PROPOSED TEMPORARY INLET PROTECTION (TYP.) PROPOSED TEMPORARY INLET PROTECTION (TYP.) PROPOSED TEMPORARY INLET PROTECTION (TYP.) PROPOSED TEMPORARY INLET PROTECTION (TYP.) PROPOSED TEMPORARY VEHICLE WASH AREA PROPOSED TEMPORARY CONC. WASHOUT AREA TEMPORARY ROCK CONSTRUCTION ENTRANCE PROPOSED TEMPORARY VEHICLE WASH AREA PROPOSED TEMPORARY CONC. WASHOUT AREA PROPOSED TEMPORARY SOIL STOCKPILE AREA PROPOSED TEMPORARY STAGING AREA 10' MAX. PROPOSED VALVE VAULT SITE PROPERTY LINE TEMPORARY CHECK DAM GRADE (GROUND SLOPE) GRADE (GROUND SLOPE) NOT TO SCALE4DETAIL SOIL STOCKPILE BORE PIT BORE PIT LOCATION (TYP) (SEE DETAIL 4, THIS SHEET) BORE PIT LOCATION (TYP) (SEE DETAIL 4, THIS SHEET) BORE PIT LOCATION (TYP) (SEE DETAIL 4, THIS SHEET) BORE PIT LOCATION (TYP) (SEE DETAIL 4, THIS SHEET) BORE PIT LOCATION (TYP) (SEE DETAIL 4, THIS SHEET) BORE PIT LOCATION (TYP) (SEE DETAIL 4, THIS SHEET) BORE PIT (HDD AND BORE & JACK) PROPOSED SANITARY SEWER EASEMENT IS S U E D F O R C O N S T R U C T I O N NOT TO SCALE EROSION CONTROL BLANKET INSTALLATION DETAIL NOT TO SCALE SEASONAL SOIL PROTECTION CHART NOT TO SCALE FILTER FABRIC FENCE DETAILS BURY UPCHANNEL END IN VERTICAL 6-INCH SLOT, THEN BACKFILL AND TAMP. NO. 8 GAGE STEEL WIRE STAPLES, BENT U-SHAPED WITH THROAT WIDTH OF 1 TO 2 INCHES, WITH DRIVING DEPTH OF NOT LESS THAN 6 INCHES. STAPLE PATTERN GUIDE. PLACE STAPLES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS CHANNEL LINING AS SPECIFIED OVERLAP ALL UPCHANNEL SECTIONS BY 12" (TYP.) OVERLAP ALL SIDE BY SIDE SECTIONS BY A MINIMUM OF 4" (TYP.) SEEDING TO BE APPLIED PRIOR TO THE INSTALLATION OF BLANKET. CONTRACTOR TO ENSURE THAT A STABLE AND UNIFORM GRASS COVER DEVELOPS IN THE SWALE. F L O W FLOW FRONT VIEW SIDE VIEW ** IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. *//I//* IRRIGATION NEEDED DURING JUNE, JULY, AND/OR AUGUST. F = STRAW MULCH 2 TONS/ACRE E = SOD D = INDOT SEE MIXTURE TYPE "T" WINTER WHEAT - 150 LBS/ACRE C = INDOT SEED MIXTURE TYPE "T" SPRING OATS - 150 LBS/ACRE B = KENTUCKY BLUEGRASS 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS/ACRE. PLUS 2 TONS STRAW MULCH/ACRE. A = INDOT SEED MIXTURE - TYPE "U" F B C A */////////I///////* MULCHING SODDING SEEDING TEMPORARY SEEDING DORMANT SEEDING PERMANENT PRACTICE STABILIZATION E** */////////I///////* JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC. B D 8" MINIMUM THICKNESS INDOT NO. 2 STONE FILTER FABRIC PLAN VIEW SECTION A-A RO A D W A Y MAINTENANCE: THE STABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED WHERE SHOWN ON THE PLAN. THE ENTRANCE SHALL BE INSPECTED WEEKLY AND ADDITIONAL INDOT NO. 2 STONE SHALL BE KEPT ON SITE SO THAT THE MINIMUM DIMENSIONS CAN BE MAINTAINED THROUGHOUT THE PROJECT. SEDIMENT TRACKED ONTO A PUBLIC ROADWAY SHALL BE REMOVED AT THE END OF EACH CONSTRUCTION DAY AND PLACED ON THE TOPSOIL STOCKPILE. NO OTHER ENTRANCE SHALL BE USED TO GAIN ACCESS TO THE SITE BY ANY CONSTRUCTION, PERSONAL OR DELIVERY VEHICLES. 20' OR TOTAL WIDTH OF ACCESS 50' MINIMUM NOT TO SCALE ROCK CONSTRUCTION ENTRANCE 10 MIL (MIN.) PLASTIC LINER STRAW BALES, CONCRETE BLOCKS, SANDBAGS, ETC. STAKES (TYP) 10 MIL (MIN.) PLASTIC LINER STRAW BALES NATIVE MATERIAL (OPTIONAL) WOOD OR METAL STAKES NOTES: 1. ACTUAL LAYOUT AND LOCATION TO BE DETERMINED IN FIELD. 2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30 FT. OF THE TEMPORARY CONCRETE WASHOUT FACILITY. STAPLES (2 PER BALE) 10' MIN. 10' MIN. BINDING WIRE 10 MIL (MIN.) PLASTIC LINER GRADE 2" 4" STAPLES (2 PER BALE) 3/4" PLYWOOD (PAINTED WHITE) 6" HIGH PAINTED BLACK LETTERING 1/2" LAG SCREW (TYP.) 4x4 WOOD POST (TYP.)3'-0" 2'-0" 4'-0" 3'-0" GRADE PLAN SECTION SIGN DETAIL STAPLE DETAIL NOT TO SCALE CONCRETE WASHOUT DETAILS COARSE AGGREGATE NOTE: STONE BAGS MAY BE USED FOR TEMPORARY CHECK DAMS. INSTALL IN SAME CONFIGURATION. L= THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION NOT TO SCALE CHECK DAM DETAILS ROCK CHECK DAM SPACING BETWEEN CHECK DAMS MANHOLE COVER ASSEMBLY FILTER ASSEMBLY POLYESTER SLEEVE ISOMETRIC VIEW IN-PLACE ELEVATION VIEW FILTER ASSEMBLY POLYESTER SLEEVE MANHOLE COVER ASSEMBLY MANHOLE NOT TO SCALE INLET PROTECTION DETAILS INLET STRUCTURE SIDE VIEWTOP VIEW (STRUCTURE TYPES VARY) INLET FILTER INSERT INLET FILTER FRAME, SUSPENSION SYSTEM AND LIFT HANDLES INSTALL BETWEEN INLET CASTING AND GRATE **DO NOT WRAP GRATE** INLET FILTER INSERT PER SPECS NONWOVEN POLYPROPYLENE GEOTEXTILE SEDIMENT FILTER BAG OVERFLOW OUTLET REQUIRED INLET FILTER FRAME, SUSPENSION SYSTEM AND LIFT HANDLES INSTALL BETWEEN INLET CASTING AND GRATE INLET GRATE (GRATE TYPES MAY VARY) BY FLEXSTORM OR APPROVED EQUAL (STRUCTURE TYPES VARY) (STRUCTURE TYPES VARY)(STRUCTURE TYPES VARY) OR INLET FILTER INSERT BY WIMCO, LLC OR APPROVED EQUAL ROAD DRAIN TOP SLAB INLET PROTECTION C-21 N.T.S. CJ F JA J DR C DS W ER O S I O N C O N T R O L D E T A I L S MAY 2016 PR O J E C T 1 6 0 1 - 1 0 6 T H S T R E E T P A R A L L E L F O R C E M A I N CL A Y T O W N S H I P R E G I O N A L W A S T E D I S T R I C T 43 8 8 -- PR I N T E D : 5 / 2 7 / 2 0 1 6 @ 4 : 0 4 P M FI L E N A M E : G : \ 4 3 8 8 - C T R W D 1 0 6 S t F M \ W o r k i n g D r a w i n g s \ A u t o C A D \ 4 3 8 8 - C - 2 1 . d w g DATE: SCALE: SHEET NO. DE S I G N E D : DR A W N : RE V I E W E D : AP P R O V E D : DA T E BY DE S C R I P T I O N NO . RE V I S I O N S SC A L E C H E C K : TH I S M A R K S H O U L D M E A S U R E E X A C T L Y 1 " W H E N P L O T T E D CL I E N T P R O J E C T N O . : GR W P R O J E C T N O . AL L R I G H T S R E S E R V E D : TH I S D O C U M E N T I S T H E P R O P E R T Y O F GR W E N G I N E E R S , I N C . A N D S H A L L N O T BE R E P R O D U C E D I N W H O L E O R I N P A R T OR U S E D F O R C O N S T R U C T I O N O F OT H E R T H A N T H I S S P E C I F I C P R O J E C T WIT H O U T W R I T T E N P E R M I S S I O N PL O T T E D B Y : C B e r t r a m en g i n e e r i n g ar c h i t e c t u r e ge o s p a t i a l ww w . g r w i n c . c o m CL CL REINFORCEMENT MESH FILTER CLOTH 8' MAX. C TO C WOOD OR STEEL SUPPORT STAKE FILTER CLOTH FILTER CLOTH STAPLES (TYP.) JOINING FENCE SECTIONS SECTION STAGGERED FENCE DETAIL DIRECTION OF FLOW 5' OVERLAP MIN. 1"X1"X12" WOOD STAKE GUY WIRE MIN. 10 GA. WIRE FILTER CLOTH FLOW 3 1 WOOD OR STEEL SUPPORT STAKE 6" 18" MIN. 30" MIN. CL CL FILTER CLOTH 5' MAX. C TO C WOOD OR STEEL SUPPORT STAKE FILTER CLOTH FILTER CLOTH STAPLES (TYP.) JOINING FENCE SECTIONS SECTION COMPACTED BACKFILL IN TOE ANCHOR TRENCH EMBED. BOTTOM 12" OF FILTER CLOTH 6" MIN. INTO GROUND FLOW UNDISTURBED GROUND 6" 18" MIN. 30" MIN. STANDARD SILT FENCE REQUIREMENTSREINFORCED SILT FENCE REQUIREMENTS 18" MIN. NOTES: 1.MAXIMUM FENCE HEIGHT = 36". MESH CAN BE EITHER INDUSTRIAL POLYPROPYLENE OR STEEL MESH WITH MAXIMUM 6" OPENING. USE MINIMUM 14 GA. WIRE. 2.EMBED. FILTER CLOTH 6" MIN. INTO GROUND. 3.INSTALL COMPACTED BACKFILL IN TOE ANCHOR TRENCH. 4.FILTER CLOTH TO BE SPUN AROUND STAKES AND STAPLED AS SHOWN AT ALL FENCE OR MATERIAL SPLICES. CURB FILTER FOR CURB INLETS FILTER FABRIC INSTALLATION 1. A TRENCH SHALL BE PLOWED OR OTHERWISE EXCAVATED TO THE REQUIRED DEPTH WITH LITTLE, IF ANY, DISTURBANCE TO THE DOWNSLOPE SIDE OF THE TRENCH. THE BOTTOM OF THE TRENCH AND THE FENCE TOP SHALL BE PLACED ON A LEVEL GRADE. WHEN IT IS NECESSARY TO CROSS SMALL DEPRESSIONS, THE TRENCH BOTTOM AND FENCE TOP EDGE MAY DEVIATE SLIGHTLY FROM THE LEVEL GRADE. GRADES IN SUCH SECTIONS SHALL NOT EXCEED ONE PERCENT (1%), AND THE DEVIATION SHALL NOT EXTEND FOR MORE THAN 25 FEET. 2. SUPPORT STAKES SHALL BE DRIVEN TO THE REQUIRED DEPTH BELOW THE EXISTING GROUND SURFACE, AT SPECIFIED INTERVALS. 3. STRETCH AND FASTEN FABRIC TO THE UPSLOPE SIDE OF THE SUPPORT STAKES. (IF A REINFORCED SECTION, FASTEN REINFORCEMENT MESH PRIOR TO FASTENING THE FABRIC). 4. WHERE ENDS OF THE FABRIC COME TOGETHER, THEY SHALL BE OVERLAPPED, FOLDED AND STAPLED TO PREVENT SEDIMENT BYPASS. 5. THE TOE ANCHOR SHALL BE BACKFILLED AND COMPACTED TO A DENSITY EQUAL TO SURROUNDING SOILS. 6. IF CONSTRUCTING A REINFORCED SECTION, ATTACH GUY WIRES TO SUPPORT STAKES. PROVISIONS SHALL BE MADE FOR EASY LOOSENING AND REMOVAL OF THE GUY WIRES TO ALLOW FOR ACCESS TO PERFORM MAINTENANCE WORK. 7. BOTH ENDS OF EACH FENCE SECTION SHALL EXTEND AT LEAST 8 FEET UPSLOPE AT 45 DEGREES TO THE MAIN FENCE ALIGNMENT. MAINTENANCE 1. THE FENCE INSTALLATION SHALL BE INSPECTED AFTER ALL RAINFALL OR SNOWMELT RUNOFF EVENT. ANY NECESSARY REPAIRS SHALL BE MADE IMMEDIATELY. 2. ACCUMULATED SEDIMENTS SHALL BE REMOVED AS REQUIRED TO KEEP THE FENCE FUNCTIONAL. IN ALL CASES, REMOVE DEPOSITS WHERE ACCUMULATIONS REACH 1/2 THE ABOVE GROUND HEIGHT OF THE FENCE. 3.ALL UNDERCUTTING OR EROSION OF THE TOE ANCHOR SHALL BE REPAIRED IMMEDIATELY WITH COMPACTED BACKFILL MATERIALS. 4. ADHERE TO ANY MANUFACTURER'S RECOMMENDATIONS FOR REPLACING FILTER FABRIC FENCE DUE TO WEATHERING. 5. FILTER FABRIC FENCE THAT HAS BEEN DAMAGED OR TEMPORARILY REMOVED DURING CONSTRUCTION ACTIVITIES SHALL BE REPLACED. 6. IN THE EVENT THAT THE FENCE FAILS TO HOLD IN ANY WAY DUE TO CONCENTRATED FLOWS, THE FAILED SECTION WILL BE REPLACED IMMEDIATELY WITH A ROCK FILTER OUTLET. 7. IN THE EVENT THAT TOPOGRAPHY REQUIRES THE STAGGERING OF FILTER FABRIC FENCES, THE FENCE SHALL BE INSTALLED SUCH THAT THE ENDS OVERLAP A MINIMUM OF 5 FEET. UNDISTURBED GROUND COMPACTED BACKFILL IN TOE ANCHOR TRENCH EMBED. BOTTOM 12" OF FILTER CLOTH 6" MIN. INTO GROUND FILTER CLOTH WOOD OR STEEL SUPPORT STAKE ELEVATION ELEVATION NOTE: ALL STAGING AREAS SHALL HAVE TEMPORARY CONSTRUCTION ENTRANCE. IS S U E D F O R C O N S T R U C T I O N T GGGG G G G G G G G G G E - 0 1 NEW VALVE VAULT - ELECTRICAL PLANS TO MICHIGANROAD WWTP D A T E : S C A L E : S H E E T N O . DESIGNED: DRAWN: REVIEWED: APPROVED: DATE BYDESCRIPTIONNO. REVISIONS SCALE CHECK:THIS MARK SHOULD MEASURE EXACTLY 1" WHEN PLOTTED ALL RIGHTS RESERVED: THIS DOCUMENT IS THE PROPERTY OF GRW ENGINEERS, INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART OR USED FOR CONSTRUCTION OF OTHER THAN THIS SPECIFIC PROJECT WITHOUT WRITTEN PERMISSIONCLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106TH STREET PARALLEL FORCEMAIN 4388-01JWS TEAM JWS JWS A S N O T E D 0 5 - 2 7 - 2 0 1 6 TO MICHIGA N ROAD WWTP F R O M L S # 2 F R O M L S # 2 F R O M L S # 2 F R O M L S # 8 D A T E : S C A L E : S H E E T N O . DESIGNED: DRAWN: REVIEWED: APPROVED: DATE BYDESCRIPTIONNO. REVISIONS SCALE CHECK:THIS MARK SHOULD MEASURE EXACTLY 1" WHEN PLOTTED ALL RIGHTS RESERVED: THIS DOCUMENT IS THE PROPERTY OF GRW ENGINEERS, INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART OR USED FOR CONSTRUCTION OF OTHER THAN THIS SPECIFIC PROJECT WITHOUT WRITTEN PERMISSIONCLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106TH STREET PARALLEL FORCEMAIN 4388-01JWS TEAM JWS JWS A S N O T E D 0 5 - 2 7 - 2 0 1 6 E - 0 2 FORCEMAIN TERMINATION AT MRWWTP ELECTRICAL PLANS E X I S T I N G P R E - T R E A T M E N T B U I L D I N G S E C T I O N V I E W L O O K I N G S O U T H - E L E C T R I C A L P L A N S C A L E : 1 / 4 " = 1 ' - 0 " E X I S T I N G P R E - T R E A T M E N T B U I L D I N G E L E C T R I C A L P L A N S C A L E : 1 / 4 " = 1 ' - 0 " D A T E : S C A L E : S H E E T N O . DESIGNED: DRAWN: REVIEWED: APPROVED: DATE BYDESCRIPTIONNO. REVISIONS SCALE CHECK:THIS MARK SHOULD MEASURE EXACTLY 1" WHEN PLOTTED ALL RIGHTS RESERVED: THIS DOCUMENT IS THE PROPERTY OF GRW ENGINEERS, INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART OR USED FOR CONSTRUCTION OF OTHER THAN THIS SPECIFIC PROJECT WITHOUT WRITTEN PERMISSIONCLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106TH STREET PARALLEL FORCEMAIN 4388-01JWS TEAM JWS JWS A S N O T E D 0 5 - 2 7 - 2 0 1 6 E - 0 3 NEW VALVE VAULT ELECTRICAL ONE-LINE DIAGRAM N E W V A L V E V A U L T E L E C T R I C A L O N E - L I N E D I A G R A M N O S C A L E S P D P M R D A T E : S C A L E : S H E E T N O . DESIGNED: DRAWN: REVIEWED: APPROVED: DATE BYDESCRIPTIONNO. REVISIONS SCALE CHECK:THIS MARK SHOULD MEASURE EXACTLY 1" WHEN PLOTTED ALL RIGHTS RESERVED: THIS DOCUMENT IS THE PROPERTY OF GRW ENGINEERS, INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART OR USED FOR CONSTRUCTION OF OTHER THAN THIS SPECIFIC PROJECT WITHOUT WRITTEN PERMISSIONCLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106TH STREET PARALLEL FORCEMAIN 4388-01JWS TEAM JWS JWS A S N O T E D 0 5 - 2 7 - 2 0 1 6 E - 0 4 NEW VALVE VAULT I & C WIRING DIAGRAM N E W V A L V E V A U L T I & C W I R I N G D I A G R A M N O S C A L E D A T E : S C A L E : S H E E T N O . DESIGNED: DRAWN: REVIEWED: APPROVED: DATE BYDESCRIPTIONNO. REVISIONS SCALE CHECK:THIS MARK SHOULD MEASURE EXACTLY 1" WHEN PLOTTED ALL RIGHTS RESERVED: THIS DOCUMENT IS THE PROPERTY OF GRW ENGINEERS, INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART OR USED FOR CONSTRUCTION OF OTHER THAN THIS SPECIFIC PROJECT WITHOUT WRITTEN PERMISSIONCLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106TH STREET PARALLEL FORCEMAIN 4388-01JWS TEAM JWS JWS A S N O T E D 0 5 - 2 7 - 2 0 1 6 E - 0 5 NEW VALVE VAULT ACTUATOR CONTROL WIRING DIAGRAM E L E C T R I C V A L V E A C T U A T O R C O N T R O L W I R I N G D I A G R A M T Y P I C A L F O R 2 0 " A N D 1 2 " K L G P L U G V A L V E D A T E : S C A L E : S H E E T N O . DESIGNED: DRAWN: REVIEWED: APPROVED: DATE BYDESCRIPTIONNO. REVISIONS SCALE CHECK:THIS MARK SHOULD MEASURE EXACTLY 1" WHEN PLOTTED ALL RIGHTS RESERVED: THIS DOCUMENT IS THE PROPERTY OF GRW ENGINEERS, INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART OR USED FOR CONSTRUCTION OF OTHER THAN THIS SPECIFIC PROJECT WITHOUT WRITTEN PERMISSIONCLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106TH STREET PARALLEL FORCEMAIN 4388-01JWS TEAM JWS JWS A S N O T E D 0 5 - 2 7 - 2 0 1 6 E - 0 6 D A T E : S C A L E : S H E E T N O . DESIGNED: DRAWN: REVIEWED: APPROVED: DATE BYDESCRIPTIONNO. REVISIONS SCALE CHECK:THIS MARK SHOULD MEASURE EXACTLY 1" WHEN PLOTTED ALL RIGHTS RESERVED: THIS DOCUMENT IS THE PROPERTY OF GRW ENGINEERS, INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART OR USED FOR CONSTRUCTION OF OTHER THAN THIS SPECIFIC PROJECT WITHOUT WRITTEN PERMISSIONCLAY TOWNSHIP REGIONAL WASTE DISTRICT PROJECT 1601 - 106TH STREET PARALLEL FORCEMAIN 4388-01JWS TEAM JWS JWS A S N O T E D 0 5 - 2 7 - 2 0 1 6 E - 0 7