[1] 181224 Lot 7 HVAC-M001cvnnFznl c
THERMOSTAT TO
ROUND MOTORIZED DAMPER
SHEET METAL DUCT WIDTH BY DEPTH W/D
LINED SHEET METAL DUCT FREE AREA WIDTH =W76
BY DEPTH.
SQUARE SHEET METAL 90 PROVIDE W ITH
DOUBLE THICKNESS TURNING VANES.
RADIUS SHEET METAL 90, R=1.5'D
SQUARE SHEET METAL 90 PROVIDE W ITH
DOUBLE THICKNESS TURNING VANES.
ROUND HIGH EFFICIENCY BRANCH DUCT
TAKE OFF ON ROUND DUCT.
ROUND TAP BRANCH DUCT TAKE OFF ON
ROUND DUCT.
HIGH EFFICIENCY BRANCH DUCT TAKE OFF
ON RECTANGULAR.
MANUAL VOLUME DAMPER LOCKING WITH SHAFT
} F7
CENTERED SQUARE TO ROUND TRANSITION
HORIZONTALLY HUNG FC WITH
SECONDARY DRAIN PAN
FC
ELECTRIC WALL HEATER
EWH
CEILING MOUNTED EXHAUST FAN
EF
LAY -IN EXHAUST GRILLE
LAY -IN SUPPLYAIR DIFFUSER
❑®
LAY -IN RETURNAIR REGISTER OR GRILLE
❑® 0
SURFACE MOUNTED SUPPLY AIR DIFFUSER
❑®
SURFACE MOUNTED SUPPLY AIR DIFFUSER
DIFFUSER TAG
X-# MARK
XXX CFM
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
DATE: 04/17/19
ABBREVIATIONS
AFF
ACCU
AHU
AWH
BDD
BOD
BOB
BTUH
CFM
DEG F
DB
0
EA
EG
EADB
EAWB
EC
ECH
EF
EWH
ESP
EUH
F
FC
FD
FD/SD
FPM
FPVAV
FT
FSK
GC
GPM
HD
IN
IR
LAT
LS
MAN
MBH
MC
MCC
MFR
MUA
CA
PC
DHU
PRV
PSI
PTAC
RA
RJ
RPM
RTU
SA
TCC
TSP
JOIN
VAV
WC
WIC
WIF
ABOVE FINISHED FLOOR
AIR COOLED CONDENSING UNIT
AIR HANDLING UNIT
ARCHITECTURAL WALL HEATER
BACK DRAFT DAMPER
BOTTOM OF DUCT
BOTTOM OF BEAM
BRITISH THERMAL UNIT PER HOUR
CUBIC FEET PER MINUTE
DEGREES FARENHEIT
DRY BULB
ROUNDDUCT
EACH OR EXHAUST AIR
EXHAUST GRILLE
ENTERING AIR DRY BULB
ENTERING AIR WET BULB
ELECTRICAL CONTRACTOR
ELECTRIC CEILING HEATER
EXHAUST FAN
ELECTRIC WALL HEATER
EXTERNAL STATIC PRESSURE' W.C.
ELECTRIC UNIT HEATER
FURNACE
FAN COIL
FIRE DAMPER
FIRE AND SMOKE DAMPER
FEET PER MINUTE
FAN POWERED VAV
FEET
FOIL SCRIM VAPOR BARRIER
GENERAL CONTRACTOR
GALLONS PER MINUTE
HOOD
INCHES
INFRA RED
LEAVING AIR TEMPERATURE
LINEAR SLOT DIFFUSER
MANUAL
1000 BTUH
MECHANICAL CONTRACTOR
MOTOR CONTROL CENTER
MANUFACTURER
MAKE UP AIR
OUTSIDE AIR
PLUMBING CONTRACTOR
DEHUMIDIFICATION UNIT
PRESSURE RELIEF VALVE
POUNDS PER SQUARE INCH
PACKAGED TERMINAL AIR CONDITIONER
RETURN AIR
ROOF JACK
REVOLUTIONS PER MINUTE
ROOF TOP UNIT
SUPPLYAIR
TEMPERATURE CONTROL CONTRACTOR
TOTAL STATIC PRESSURE
UNLESS OTHERWISE NOTED
VARIABLE AIR VOLUME
WALL CAP
WALK IN COOLER
WALK IN FREEZER
MECHANICAL SPECIFICATIONS
GENERAL
1. BID INSTRUCTIONS: CONTRACTORS SHALL PROVIDE BASE
BID IN STRICT ACCORDANCE WITH DESIGN BASIS
EQUIPMENT AND MATERIALS. PROJECT DOES
ENCOURAGE COMPETITIVE PRICING AND ALLOWS FOR
SUBSTITUTIONS OF EQUAL EQUIPMENT AND MATERIALS
AGAINST THE BASIS OF DESIGN. SUBSTITUTE ITEMS WILL
BE COMPARED AGAINST DESIGN BASIS DURING
SUBMITTAL PROCESS. ENGINEER RESERVES THE RIGHT
TO REJECT SUBSTITUTIONS FOUND NOT TO BE EQUAL TO
ITEMS LISTED IN DESIGN BASIS.
2. PRIOR TO PROCUREMENT CONTRACTOR SHALL SUBM IT
TO ARCHITECT FULL SUBMITTALS FOR ALL ENERGY
CONSUMING OR PRODUCING ITEMS AND FOR ALL DUCT
ACCESSORIES, INSULATION, VAV BOXES, REGISTERS,
GRILLES, DIFFUSERS AND LOUVERS. SUBMITTALS SHALL
BE DELINEATED WITH TAGS INDICATED ON PRINTS,
CONTRACTORS NAME, PROJECT NAME. CLEARLY
INDICATE ALL MODEL NUMBERS AND ALL ACCESSORIES
AND OPTIONS BEING PROVIDED. SUBMISSIONS SHALL BE
IN PDF FORMAT. ALL EQUIPMENT AND ITEMS SHALL BE
PER DESIGN BASIS OR APPROVED EQUAL. ENGINEER
RESERVES THE RIGHT TO REJECT ANY SUBSTITUTE ITEM
3. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE
ALL REQUIRED ELECTRICAL SUPPORT NEEDED FROM THE
ELECTRICAL CONTRACTOR. ENSURE ALL SUBMITTALS
FOR POWERED COMPONENTS AND CONTROLS ARE
PROVIDED AND FULLY COORDINATED WITH ELECTRICAL
CONTRACTORS.
4. CONTRACTOR SHALL BE RESPONSIBLE TO VISIT THE SITE
TO EXAMINE ALL CONDITIONS THAT MAY IN ANY WAY
AFFECT THE EXECUTION OF HIS WORK. HE SHALL ALSO
EXAM INE THE DRAWINGS AND SPECIFICATIONS FOR
OTHER BRANCHES OF WORK MAKING REFERENCE TO
THEM FOR DETAILS OF EXISTING BUILDING CONDITIONS.
NO EXTRAS WILL BE ALLOWED FOR FAILURE TO INCLUDE
ALL REQUIRED WORK IN THE BID. CONTRACTOR SHALL
GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO
CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE
OF ACCEPTANCE.
5. THE DRAWINGS IN THIS SECTION ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO DEFINE EXACT QUANTITIES,
LOCATIONS OR CODIFIED REQUIREMENTS. DRAWINGS
SHOW GENERAL INTENT OF SYSTEMS. M.C. SHALL
PROVIDE AND PAY FOR ALL REQUIRED PERMITS.
6. PRIOR TO WORK COORDINATE ALL OPENINGS AND
INSTALLATIONS OF DUCT, PIPING, EQUIPMENT,
CONTROLS, DIFFUSERS AND GRILLES WITH G.C. AND
OTHER TRADES. PROVIDE INSTALLATIONS WITH PROPER
MANUFACTURERS RECOMMENDED CLEARANCES.
T. UPON COMPLETION OF THE MECHANICAL INSTALLATION,
DEMONSTRATE TO THE ENGINEER AND THE OWNER'S
SATISFACTION THAT THE SYSTEMS HAVE BEEN
INSTALLED IN ACCORDANCE WITH THE DRAWINGS,
SPECIFICATIONS AND APPLICABLE CODES.
DEMONSTRATE THE DYNAMIC OPERATION OF EACH
SYSTEM. VERIFY PROPER OPERATION OF EQUIPMENT,
FILTERS ARE CLEAN AND COMPONENTS OF THE SYSTEM
ARE INSTALLED AND ADJUSTED IN FULL ACCORDANCE
WITH MANUFACTURER RECOMMENDATIONS.
8. ALL WORK SHALL BE IN FULL ACCORDANCE WITH 2O14
INDIANA MECHANICAL CODE (2012 INTERNATIONAL
MECHANICAL CODE), INDIANA ENERGY CODE (ASHRAE
90.1-2007) PERTINENT STATE, COUNTY, CITY CODES AND
ORDINANCES AND INDIANA AMENDMENTS.
9. MECHANICAL CONTRACTOR SHALL ENSURE EMPLOYEES
ARE MEETING AND DOCUMENTING ALL OSHA AND JOB
SPECIFIC SAFETY REQUIREMENTS AS REQUIRED BY LAW
AND BY CONTRACT. PERSONAL PROTECTIVE EQUIPMENT
SHALL BE PROVIDED AND UTILIZED AS REQUIRED.
MECHANICAL CONTRACTOR SHALL PAY ALL FINES LEVIED
BY OSHA FOR FAILURE TO COMPLY WITH OSHA
REQUIREMENTS.
10. INSTALL ALL EQUIPMENT, DUCTWORK AND PIPING AS
HIGH AS POSSIBLE. PRIOR TO ROUGH -IN COORDINATE
ELEVATIONS WITH OTHER TRADES. WHERE VISIBLE,
ORIENT PERPENDICULAR AND/OR PARALLEL TO
STRUCTURE.
EQUIPMENT
1. PROVIDE SUBM ITTALS TO ELECTRICIAN AS REQUIRED
FOR COORDINATION OF ALL ELECTRICAL POWER WIRING.
INCLUDE WIRING DIAGRAMS AND CABLING
REQUIREMENTS FOR REFERENCE. COORDINATE ALL
INTERLOCKS AS NEEDED. PROVIDE SINGLE POINT
CONNECTION KITS AS NEEDED.
2. INSTALL ALL EQUIPMENT IN FULL ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS AND CLEARANCE
REQUIREMENTS. PROVIDE ALL REQUIRED MOUNTING OR
HOUSEKEEPING PADS. G.C. SHALL PROVIDE LEVEL
GRADE FOR EXTERIOR MOUNTED EQUIPMENT. M.C.
SHALL PROVIDE ALL HOISTING AND RIGGING NEEDED TO
SET ALL HVAC EQUIPMENT.
DUCTWORK
1. CONCEALED ROUND DUCTWORK SHALL BE
CONSTRUCTED PER SMACNA LOW PRESSURE
STANDARDS 1' PRESSURE CLASS, 5' MAXIMUM JOINT
LENGTHS, SEAL CLASS B LONGITUDINAL SEAM SNAP
LOCK PIPE AND ADJUSTABLE FITTINGS.
2. PROVIDE MANUAL BALANCING DAMPERS FOR ALL
SUPPLY AIR RUNS. ROUND DAMPERS SHALL BE SECURED
ON BOTH SIDES OF DUCT AND SHALL CONTAIN LOCKING
HANDLE. DO NOT INSTALL DAMPERS IN NON ACCESSIBLE
LOCATIONS. PROVIDE INTEGRAL DAMPERS WITH
DIFFUSER IN NECK IF NO ACCESSIBLE LOCATION IS
POSSIBLE. ALL SUPPLY AIR RUNS SHALL HAVE MEANS OF
BALANCE. RETURN AND EXHAUST AIR RUNS SHALL
CONTAIN DAMPERS WHERE SHOWN ON PLANS.
3. INSULATED FLEXIBLE DUCTING SHALL NOT EXCEED 25
FEET. ALL FLEX SHALL BE LISTED FLEXIBLE DUCT,
FLEXIBLE CONNECTORS ARE NOT ACCEPTABLE. FLEXIBLE
DUCT EQUAL TO FLEXIBLE DUCT CLASS 1 AIR DUCT,
DOUBLE LAMINATED POLYESTER FILM ON STEEL WIRE
REINFORCING, INSULATED WITH SCRIM REINFORCED
METALIZED POLYESTER OUTER FIRE RETARDANT
JACKET. R-4.2 FOR CONDITIONED SPACES AND R-6.0 FOR
ANY SPACES OUTSIDE BUILDING THERMAL ENVELOPE.
FLEX DUCTS SHALL NOT BE RUN THROUGH WALLS OR
FLOORS. PROVIDE HARD DUCTED SLEEVES AS NEEDED.
4. RECTANGULAR DUCTWORK SHALL BE CONSTRUCTED IN
ACCORDANCE WITH SMACNA LOW PRESSURE DUCT
STANDARDS, +/_ 1.0' W.C. FROM ASTM A 653/A 653M G-90
COATED GALVANIZED SHEET STEEL. SEAMS SHALL BE
PITTSBURGH CONSTRUCTION, NO BUTTON PUNCH OR
SNAP LOCK SEAMS ARE ACCEPTABLE. SEAL ALL
TRANSVERSE AND LONGITUDINAL SEAMS WITH WATER
BASED DUCT SEALER, SEAL CLASS B. GAUGE AND JOINT
CLASSIFICATIONS ACCEPTABLE ARE AS FOLLOWS, ALL
SECTION LENGTHS ARE 48' MAXIMUM, REFER TO SMACNA
RIGIDITY TABLES FOR GAUGES ON LONGER SECTIONS IF
REQUIRED:
<12' 26 GAUGE, FLAT S AND DRIVE
12'-24' 24 GAUGE, FLAT S AND DRIVE
25'-34' 22 GAUGE, STANDING S AND FLAT DRIVE
34'-00' 22 GAUGE, STANDING S AND STANDING
DRIVE
>40' REFER TO SMACNA FOR STANDARDS.
5. DUCT HANGERS: COMPLY WITH SMACNA'S'HVAC DUCT
CONSTRUCTION STANDARDS - METAL AND FLEXIBLE,'
CHAPTER 5, "HANGERS AND SUPPORTS" PROVIDE
GALVANIZED MINIMUM 22 GAUGE 1' WIDE STRAP TO HANG
RECTANGULAR DUCTWORK SMALLER THAN 30' WIDE.
DUCT HANGERS FOR RECTANGULAR SHEET METAL
DUCTS 30' AND LARGER SHALL BE TRAPEZE STYLE USING
UNISTRUT AND 3/8' OR 1/2' ROD. PROVIDE CRIPPLE,
DURODYNE OR EQUAL CABLE HANGERS FOR HANGING
ROUND DUCTWORK. SUPPORT ALL HANGERS FROM
STRUCTURE PER SMACNA STANDARDS.HANGERS FOR
SPIRAL DUCTS GREATER THAN 28' IN DIAMETER SHALL
BE HUNG WITH ROD AND DUCT CLAMP. FLEXIBLE
DUCTING SHALL BE SUPPORTED USING MINIMUM 2' WIDE
NYLON STRAP. ALL INTERVALS ARE PER SMACNA.
DUCT ACCESSORIES
1. COORDINATE WITH ARCHITECTURAL DRAWINGS AND
PROVIDE FIRE AND FIRE AND SMOKE DAMPERS AT FIRE
RATED ASSEMBLY PENETRATIONS IN ACCORDANCE WITH
THE INTERNATIONAL BUILDING CODE AND WHERE
SHOWN ON PLANS.
2. PROVIDE FLASHING MATERIALS AND OR SLEEVES AS
REQUIRED FOR ALL DUCT PENETRATIONS OF NON RATED
ELEMENTS. EXPOSED PENETRATIONS SHALL BE FLASHED
WITH SHEET METAL TIGHT TO WALLS.
3. REGISTERS, GRILLES AND DIFFUSERS SHALL BE
EQUIVALENT TO SCHEDULED PRODUCTS.
DUCT INSULATION
1. ALL DUCT INSULATION MATERIALS SHALL HAVE A FLAME
SPREAD RATING OF 25 OR LESS (ON THE FLAME SPREAD
TEST SCALE) AND SMOKE DEVELOPMENT OF 50 OR LESS
(ON THE SMOKE TEST SCALE) OR AS DEFINED BY NFPA
255 STANDARD METHOD OF TESTING OF SURFACE
BURNING CHARACTERISTICS OF BUILDING MATERIALS,
LOCAL CODES AND LOCAL AUTHORITIES HAVING
JURISDICTION. DUCT WRAP SHALL BE FIBERGLASS
MATERIAL PER ASTM C411,ASTM C-1104,ASTM C665,
ASTM C-1338, ASTM E-84, ULT23, NFPA 90A,CAN/ULC
S102-1188,ASTM C1290, ASTM C553, ASTM C1136.
2. INSULATION: INSTALL ALL INSULATION IN STRICT
ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS IN
A TIGHT AND NEAT MANOR. NO SAGGING, FRAYED OR
TORN INSULATION WILL BE EXCEPTED. UNLESS
OTHERWISE NOTED ON PLANS DUCTWORK SHALL BE
INSULATED AS FOLLOWS:
SA/OA- 1-1/2' FIBERGLASS DUCT WRAP WITH FSK
FACING, 75#/FT3 MINIMUM APPLIED R-3.5
INSTALLED IN STRICT ACCORDANCE WITH
MANUFACTURERS REQUIREMENTS.
RA NONE REQUIRED UNLESS NOTED ON PLANS.
EA- NONE REQUIRED UNLESS NOTED ON PLANS.
PIPING
1. PIPING SLEEVES; INTERIOR OR EXTERIOR ABOVE GRADE;
GALVANIZED -STEEL -PIPE SLEEVES OR PVC -PIPE
SLEEVES. VERIFY, WITH FIRE AUTHORITIES HAVING
JURISDICTION, THAT PVC MATERIALS ARE ALLOWED FOR
SLEEVES. BELOW GRADE; ALL; MECHANICAL
GALVANIZED -STEEL PIPE SLEEVE SYSTEM LIKE
LINK -SEAL. ALL SLEEVES SHALL BE FIRE STOPPED OR
CAULKED. EXTERIOR SLEEVES SHALL PROVIDE
WATER/AIR TIGHT PENETRATION SYSTEM.
2. REFRIGERATION PIPING;
A. SYSTEMS 5 TONS OR LESS; MANUFACTURED
REFRIGERANT LINE SETS: ANNEALED -COPPER SUCTION
AND LIQUID LINES FACTORYCLEANED, DRIED,
PRESSURIZED WITH NITROGEN, SEALED, AND WITH
SUCTION LINE INSULATED. PROVIDE IN STANDARD
LENGTHS FOR INSTALLATION WITHOUT JOINTS, EXCEPT
AT EQUIPMENT CONNECTIONS OR ACCESSIBLE
GOODERUM & ASSOCIATES ENGINEERING
MEP Engineer
Chelte
874 7.506. 151 Way
Avon, IN 46123
P: 317.745.5761
F: dave@5.5T61
E: tlave@gnaengineering.mm
LOCATIONS. CONNECTIONS AND WROUGHT -COPPER
FITTINGS WHERE REQUIRED SHALL BE BRAZED WITH
MINIMUM 8% SIL-FLOS.
B. INSULATION; SUCTION AND ALL DUCTLESS SPLIT OR VRF
LINES; MINIMUM 1/2' THICK WALL INSULATION SHALL BE
A FLEXIBLE, CLOSED -CELL ELASTOMERIC PIPE
INSULATION, AP ARMAFLEX OR AC ACCOFLEX. ADHESIVE
SHALL BE ARMAFLEX 520,520 BLACK OR 520 BLV
ADHESIVE. THE INSULATION MUST CONFORM TO ASTM
C534 GRADE 1, TYPE I ARMAFLEX AND BE INSTALLED IN
STRICT ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS. (3/8' WALL WILL NOT BE
ACCEPTED).
C. ALL INSULATION EXPOSED TO OUTDOORS SHALL BE
EITHER PVC LAGGED OR SHALL BE PAINTED WITH
ARMA-FINISH FIR UV PROTECTING PAINT.
D. LINES SHALL BE RUN KINK FREE AND GENERALLY
CONTINUOUS AND AT 90 DEGREE ANGLES TO
STRUCTURE. AVOID JOINTS WHEN POSSIBLE. ALL
REQUIRED JOINTS SHALL BE MADE IN ACCESSIBLE
LOCATIONS OR M.C. SHALL PROVIDE ACCESS PANELS AS
NEEDED. ALL BENDS SHALL BE MADE WITH LONG RADIUS
FITTINGS OR WITH MECHANICAL BENDING TOOL TO
PROVIDE SMOOTH LONG RADIUS TURNS. SUPPORT ALL
PIPING WITHOUT CRUSHING OR DEPRESSING
INSULATION. USE REFRIGERATION STYLE CUSH CLAMPS
MOUNTED TO STRUT, DO NOT LAY PIPING ON
STRUCTURAL BUILDING MEMBERS. SLEEVE ALL
PENETRATIONS AND SEAL WATER TIGHT.
E. PRESSURE TEST, TRIPLE EVACUATE AND PREPARE ALL
PIPING IN STRICT ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
5. CONDENSTATE PIPING
A. PROVIDE TRAPS BUILT FROM INDIVIDUAL FITTINGS ON
ALL EVAPORATOR DRAIN PANS MINIMUM DEPTH 1.5 TIMES
BLOWER BLOCKED TIGHT STATIC PRESSURE. ALL TRAPS
SHALL BE CONSTRUCTED WITH PVC 90S
(MANUFACTURED RUNNING TRAP FITTINGS ARE NOT
ACCEPTABLE). PROVIDE ALL TRAPS WITH CLEAN OUTS
AND REMOVABLE CAPS AS NEEDED FOR MAINTAINING
LINES.
B. HVAC CONTRACTOR SHALL COORDINATE CONDENSATE
DISPOSAL POINTS WITH P.C. HVAC CONTRACTOR IS
RESPONSIBLE FOR PIPING FROM EVAPORATOR COILS TO
DISPOSAL POINT. P.C. IS RESPONSIBLE FOR STAND
PIPES, FLOOR AND HUB DRAINS AS NEEDED.
C. MATERIALS: POLYVINYL CHLORIDE DRAIN, WASTE AND
VENT PIPE (PVC) SCHEDULE 40 MINIMUM SIZE 3/4'
.WRAPPED IN RETURN AIR PLENUMS WITH RA RATED
MATERIAL.
D. PROVIDE CONDENSATE PUMPS AS REQUIRED WITH HIGH
LEVEL SHUT DOWN SWITCHES INTERLOCKED TO A/C
UNITS.
E. PITCH ALL PIPING MINIMUM k PER FOOT. SUPPORT
PIPING AT MINIMUM 5'-0' INTERVALS. SECURE FINAL
CONNECTION AT SEWER WITH MINIMUM 1-1/2' AIR GAP
CONNECTION.
F. INSULATE ALL PIPING IN RA PLENUMS AND ABOVE HARD
CEILINGS WITH MINIMUM 3/8' WALL ARMAFLEX
INSULATION.
CHECKTEST AND START UP REQUIREMENTS
1. ALL HVAC EQUIPMENT INSTALLATIONS SHALL BE
VERIFIED AND STARTED UP PER MANUFACTURERS
RECOMMENDATIONS. VERIFY ALL MODES OF OPERATION.
CONFIGURE ALL CONTROLS AND PROGRAM
OCCUPANCIES PER OWNER PROVIDED SCHEDULES.
2. LABEL ALL MAJOR PIECES OF EQUIPMENT WITH
LAMACOID PLASTIC, BLACK WITH WHITE LETTERS. SIZE
TO BE CONSISTENT WITH EQUIPMENT BEING LABELED.
LENGTH AND WIDTH VARY FOR REQUIRED LABEL
CONTENT. THERMOSTAT AND SENSOR LABELS SHALL BE
ADJUSTED TO PROVIDE ESTHETIC APPEARANCE.
3. PROVIDE AIR BALANCE BY CONTRACTOR. CONTRACTOR
SHALL BALANCE SUPPLY, RETURN, OUTSIDE, RELIEF AND
EXHAUST AIR SYSTEMS IN ACCORDANCE WITH CURRENT
SMACNA, NEEB OR AABC STANDARDS TO DESIGN VALUES
AND PROVIDE WRITTEN REPORT TO ARCHITECT.
MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING ALL DEVICES, DRIVES, SHEAVES, MOTOR
CHANGES AND REWORKAS REQUIRED TO MEET DESIGN
REQUIREMENTS.
4. TEMPERATURE CONTROL WORK SHALL BE THE
RESPONSIBILITY OF THE HVAC CONTRACTOR. PROVIDE
ALL COMPONENTS INCLUDING T/S, T/S WIRE (PLENUM
RATED IN RA PLENUMS), SWITCHES, ACTUATORS ETC. AS
REQUIRED FOR A COMPLETE SYSTEM. PRIOR TO
ROUGH -IN COORDINATE FINAL LOCATION FOR ALL
CONTROLS WITH OWNERS REPRESENTATIVE.
5. CLOSEOUT: PROVIDE MANUFACTURERS OPERATION AND
MAINTENANCE MANUALS, AIR BALANCE REPORT AND AS
BUILT DRAWINGS. PROVIDE (1) TRAINING SESSION TO
OWNER SELECTED PERSONNEL AS REQUESTED AND
PROVIDE WARRANTY INFORMATION FOR ALL
MANUFACTURERS WARRANTED EQUIPMENT.
U-)
WCl-
M
O
U
z
=
z
0
�
w
�
m
�
U
/W
O
2
O
w
r
Z_
~
Q
o
J
r
J
�
O_
�
¢
o
o
O
�
o
�
U m Z
M
z J-_
Y
,a'n rr
O
0 N U
w
Z
0
mmi
a
J
_
<Q
N
w
w
ioe
a
L
_
ay
w
~
u
a
rc
o
n >x
m J
°z6a
w
W
w
3
�2
V I
I T
NO
HVAC SYMBOLS,
ABBREVIATIONS,
AND
SPECIFICATIONS