Loading...
Trotter Construction 7-22-98 AGREEMENT C)~/~'~ City of Carmel, Indiana THIS AGREEMENT is made and entered into by and between the City of Cannel, Indiana, TROTTER CONSTRUCTION actin b and through its Board of Public Works and Safety ("OWNER") and COMPANY INC. GRADY BROT~E~d &INC... ("CONTRACTOR"), concerning the project ("Project") described more particularly in Appendix A which is attached hereto and incorporated herein by reference. RECITALS: A, The OWNER has heretofore caused to be prepared certain plans, specifications and other documents (collectively, the "Contract Documents") as hereinafter listed pertaining to the Project, and the CONTRACTOR has filed a bid proposal ("Proposal") to furnish labor, tools, material, equipment and/or services, and to perform the work ("Work") called for in the Contract Documents pertaining to the Project, upon the terms and for the price(s) therein fully stated and set forth; and B, The said Contract Documents accurately and fully describe the terms and conditions upon which the CONTRACTOR is willing to furnish the labor, tools, material, equipment, services, and perform the Work called for by the Contract Documents and in the manner and time and for the price(s) set forth therein. THE OWNER AND CONTRACTOR AGREE AS FOLLOWS: 1.0 Contract Documents 1.1 This Agreement consists of the following Contract Documents all of which are as fully a part of this Agreement as if set out verbatim herein or attached hereto and the same do in all particulars become the Agreement between the parties hereto in all matters and things set forth herein and described: a. This Agreement, including any attachments hereto; b, All Addenda issued prior to receipt of bid proposals, whether or not receipt thereof has been acknowledged by CONTRACTOR in its Proposal; c. The Specifications; d. The Additional Requirements; e, Notice to Bidders; Instructions to Bidders; g. Plans and Drawings; h. Performance, Payment and Maintenance Bonds; A- l a:\penn7.doc 1.2 2.0 2.1 2.2 3.0 3.1 i. CONTRACTOR'S Itemized Proposal and Declarations; and All other documents defined as Contract Documents in any of the above listed documents. In resolving conflicts, errors, discrepancies and disputes conceming the nature, character, scope or extent of Work to be performed or furnished by the CONTRACTOR hereunder, or other rights and obligations of the OWNER and/or CONTRACTOR, the provision of a Contract Document expressing the greater quantity, quality or scope of the Work, or imposing a greater obligation upon the CONTRACTOR, or affording a greater right or remedy to OWNER, shall govern, without regard to the party who drafted such provision; otherwise, the Documents shall be given precedence in the order as listed in paragraph 1.1 herein above. Contract Price The CONTRACTOR shall, in strict conformity with the Contract Documents, furnish all necessary labor, tools, materials, equipment, services, assume and fulfill all obligations and perform all Work required to construct, complete, and make ready for use by the OWNER at the Unit Prices as quoted in the Proposal for a total contract price not to exceed $ 3,457,744.48 Base Bid subject to any additions or deletions based on actual approved quantities of the respective unit price items, which price the CONTRACTOR agrees to accept as full payment for all such Work actually performed and accepted as described in the "Contract Items and Unit Prices specification" and other Contract Documents (the "Contract Price"). The CONTRACTOR agrees that each unit price shall be deemed full and complete compensation for all direct and indirect costs for the each respective item of Work, including without limitation all materials, labor, supervision, equipment, transportation, warranties, repairs, replacement, overhead and profit for the item, complete and in place. The above stated Contract Price will be paid to the CONTRACTOR in the manner and at such times as set forth in the Contract Documents. Contract Time It is hereby understood and mutually agreed, by and between the CONTRACTOR and OWNER, that the date of commencement and the time for completion of the Work as specified in the Contract Documents are essential conditions of this Agreement. A-2 ~'x~nn7 .ctoc' 3.2 3.3 o 0 5.1 5.2 The CONTRACTOR agrees that the Work shall be commenced no later than the date indicated in the Notice to Proceed to be provided by OWNER to CONTRACTOR and that the Work shall be performed regularly, diligently and without interruption at such a rate of progress as will insure "Substantial Completion" of the Project, including completion of performance testing and such remedial work as may be required by the OWNER, by the dates specified in contract documents. The CONTRACTOR and OWNER acknowledge and agree that the time allotted by this Agreement for the performance and completion of the Work is reasonable and takes into account any and all risks and adverse conditions which may befall the CONTRACTOR hereunder. Effective Date This Agreement shall be deemed effective as of the date and year on which the last of the parties hereto, or their representative, executes same. Miscellaneous Provisions OWNER' s Property Any and all documentation (other than original tracings and original calculations) generated by CONTRACTOR pursuant to this Agreement shall be considered OWNER' s exclusive property and shall be disclosed only to OWNER and to no other person without OWNER's prior express written consent. CONTRACTOR shall keep confidential all working and deliberative material pursuant to IC 5-14-3-4. Termination Except as stated to the contrary heroin, this Agreement may be suspended and/or terminated upon such terms as are set forth in Article 14 of the City of Carmel, Standard General Conditions for Construction Contracts 1997 (the "General Conditions"), as attached hereto as Appendix B. In the event an amount allegedly due hereunder is disputed and such dispute is not resolved to OWNER's satisfaction within ten (10) business days after notice of such dispute is given to CONTRACTOR, OWNER shall pay such amount as is in dispute, under protest, into the City Court of Carrnel, which Court shall hold such money until notified of a resolution signed by both parties hereto or until a final judgment is entered thereon. A-3 a:Xpenn7.doc 5.3 Binding Effect 5.4 5.5 5.6 5.7 OWNER and CONTRACTOR and their respective officers, officials, partners, successors, executors, administrators, assigns and legal representatives are bound by this Agreement to the other party hereto and to the officers, officials, partners, successors, executors, administrators, assigns and legal representatives of such other party in all respects as to all covenants, agreements and obligations contained and/or incorporated herein. No Third Party Beneficiaries Nothing contained herein shall be construed to give any rights or benefits hereunder to anyone other than OWNER or CONTRACTOR. Relationship The relationship of the parties hereto shall be as provided for in this Agreement, and CONTRACTOR, as well as its agents, employees, contractors and other persons shall in no fashion be deemed to be an employee of OWNER. Furthermore, CONTRACTOR shall be solely responsible for payment to or for its agents, employees, contractors and other persons of all statutory, contractual and other compensation, benefits and obligations due thereto, and OWNER shall not be responsible for same. Rather, the Contract Price to be paid hereunder by OWNER to CONTRACTOR shall, subject to the terms and conditions hereof, be the full and maximum compensation and monies required of OWNER to be paid to CONTRACTOR pursuant to this Agreement. Insurance CONTRACTOR shall maintain such bonds and insurance as are set forth in Article 5 of the General Conditions. Indemnification CONTRACTOR shall indemnify and hold harmless OWNER, its officers, officials, employees, agents and legal representatives, from all losses, liabilities, claims, judgments and liens, including, but not limited to, all costs, expenses and attomey fees, arising out of any intentional or negligent act or omission of CONTRACTOR and/or any of its agents, employees, subcontractors or other persons in the performance of this Agreement. The failure to do so shall constitute a material breach of this Agreement. This indemnification obligation shall survive the termination of this Agreement. A-4 a:\lgnn7.doc 5.8 Setoff 5.9 5.10 5.11 In addition to any right of setoff provided by law, all amounts due CONTRACTOR shall be considered net of indebtedness of CONTRACTQR to OWNER, and OWNER may deduct any amounts due or to be come due from CONTRACTOR to OWNER and its subsidiaries from any sums due or to become due from OWNER to CONTRACTOR hereunder. Government Compliance CONTRACTOR agrees to comply with all present and future federal, state and local laws, executive orders, rules, regulations, codes and ordinances which may be applicable to CONTRACTOR's performance of its obligations under this Agreement, and all relevant provisions thereof are incorporated herein by this reference. CONTRACTOR agrees to indemnify and hold harmless OWNER from any loss, damage or liability resulting from any violation of such laws, orders, rules, regulations, codes and/or ordinances. This indemnification obligation shall survive the termination of this Agreement. Severability. If any provision of this Agreement is held to be invalid, illegal or unenforceable by a court of competent jurisdiction, that provision shall be stricken, and all other provisions of this Agreement which can operate independently of such stricken provision shall continue in full force and effect. Notice. Any notice, invoice, order or other correspondence required or permitted to be sent under or pursuant to this Agreement shall be in writing and either hand-delivered or sent by first-class U.S. mail, postage prepaid, addressed to the parties at the following address: OWNER: CONTRACTOR: City of Carmel Board of Public Works and Safety One Civic Square Carmel, IN 46032 Attention: M. Kate Boyle, PE, City Engineer Attention: (with a copy to City Attorney, Department of Law, same address) GRADY BROTHERS INC. P0 BOX 421519 INDIANAPOLIS, INDIANA 46242 ATTN: TOM GRADY Notwithstanding the above, a notice to cease all Work under Paragraph 5.2 hereinabove may be orally given, as long as such notice is promptly followed by written notice as provided in this Paragraph 5.11. A-5 ~xp~nn7.aoc 5.8 Setoff 5.9 5.10 5.11 In addition to mY fight of setoff provided by law, all amounts due CONTRACTOR shall be considered net of indebtedness of CONTRACTQR to OWNER, and OWNER may deduct any amounts due or to be come due from CONTRACTOR to OWNER and its subsidiaries from any sums due or to become due from OWNER to CONTRACTOR hereunder. Government Compliance CONTRACTOR agrees to comply with all present and future federal, state and local laws, executive orders, rules, regulations, codes and ordinances which may be applicable to CONTRACTOR's performance of its obligations under this Agreement, and all relevant provisions thereof are incorporated herein by this reference. CONTRACTOR agrees to indemnify and hold harmless OWNER from any loss, damage or liability resulting from any violation of such laws, orders, rules, regulations, codes and/or ordinances. This indemnification obligation shall survive the termination of this Agreement. Severability. If any provision of this Agreement is held to be invalid, illegal or unenforceable by a court of competent jurisdiction, that provision shall be stricken, and all other provisions of this Agreement which can operate independently of such stricken provision shall continue in full force and effect. Notice. Any notice, invoice, order or other correspondence required or permitted to be sent under or pursuant to this Agreement shall be in writing and either hand-delivered or sent by first-class U.S. mail, postage prepaid, addressed to the parties at the following address: OWNER: CONTRACTOR: City of Carmel Board of Public Works and Safety One Civic Square Carmel, IN 46032 Attention: M. Kate Boyle, PE, City Engineer Attention: (with a copy to City Attorney, Department of Law, same address) TROTTER CONSTRUCTION COMPANY INC. 5851 EAST 34th STREET INDIANAPOLIS, INDIANA 46218 ATTN: JAMES TROTTER Notwithstanding the above, a notice to cease all Work under Paragraph 5.2 hereinabove may be orally given, as long as such notice is promptly followed by written notice as provided in this Paragraph 5.11. A-5 ~XpennT.doc' 5.12 Governing Law 5.13 5.14 5.15 5.16 5.17 This Agreement shall be governed by and construed in accordance with the laws of the State of Indiana, except for its conflict of laws provisions, as well as with all municipal ordinances and codes of the City of Cannel. The parties further agree that, in the event a lawsuit is filed hereunder, they waive any rights to a jury trial they may have, agree to file any such lawsuit in an appropriate court in Hamilton County, Indiana only, and agree that such court is the appropriate venue for and has jurisdiction over same. Waiver Any delay or partial inaction on the part of OWNER in exercising or pursuing any fight and/or remedy provided hereunder or by law shall not operate to waive any such rights or remedies. Exhibits All exhibits and/or appendices referenced herein, whether marked "Exhibit", "Appendix", or by some other title, shall be considered a part of this Agreement. Prior Agreements This Agreement contains all of the agreements of the parties hereto with respect to the subject matter hereof, and no prior agreement, understanding or representation pertaining to such subject matter shall be effective for any purpose. No provision of this Agreement may be amended, added to or subtracted from, except by an agreement in writing signed by all the parties hereto or their respective successors in interest. Representation and Warranties Each party hereto represents and warrants that it is authorized to enter into this Agreement and that such party, in executing this Agreement, has the authority to bind such party or the party which it represents, as the case may be. Headings All headings and sections of this Agreement are inserted for convenience only and do not form a part of this Agreement nor limit, expand or otherwise alter the meaning of any provisions hereof. A-6 a:~,ennT.aoc 5.18 Advice of Counsel The parties warrant that they have read this Agreement and understand it, are fully aware of their respective rights, have had the opportunity, for the advice and assistance of an attorney throughout the negotiation of this Agreement, and enter into this Agreement freely, voluntarily and without any duress, undue influence, coercion or promise of benefit, except as expressly set forth herein. 5.19 Entire Agreement This Agreement represents the entire understanding between CONTRACTOR and OWNER with respect to the subject matter herein and supersedes all prior negotiations, representations, and/or contracts, either oral or written, respective thereto. IN WITNESS WHEREOF, the parties hereto set their hand on the dates below written: OWNER: CITY OF CARMEL, INDIANA by and through its board of Public Works and Safety~ ~~ BY ~ es Brainard, Mayor CONTRACTOR: TROTTER CONSTRUCTION COMPANY 5851 EAST 34th STREET UINDIANAPOLIS, INDIANA 46205 Printed Name: JAMES H. TROTTER SR., Mary ~ur e, Mem er Date: Title: PRESIDRNT D~e: 7/27/98 Bill~f~faliter, Member Date: ~o0 -~jT-d~f A TT :~ C o: drray ,. C; Dian ,. - Date: INC. PRES. A-7 .:xpennT.aoc 5.18 Advice of Counsel The parties warrant that they have read this Agreement and understand it, are fully aware of their respective rights, have had the opportunity. for the advice and assistance of an attorney throughout the negotiation of this Agreement, and enter into this Agreement freely, voluntarily and without any duress, undue influence, coercion or promise of benefit, except as expressly set forth herein. 5.19 Entire Agreement This Agreement represents the entire understanding between CONTRACTOR and OWNER with respect to the subject matter herein and supersedes all prior negotiations, representations, and/or contracts, either oral or written, respective thereto. IN WITNESS WHEREOF, the parties hereto set their hand on the dates below written: OWNER: CITY OF CARMEL, INDIANA by and through its board of Public Works and Safety BY' ~ames Brainard, Mayor Date: CONTRACTOR: GRADY BROTHERS INC- PO BOX 421519 INDIANAPOLIS, INDIANA 46242 BY:~~~, /tr~. Printed Name: TOM GR~~t Mary'Anftur e, Membei Date: Title: PRESIDENT Date: 7/27/98 Diana ~ordray,. CI~-~T~r Date: A-7 ~nnT.aoe PROJECT: WORK: DESIGN BY: OWNER'S REPRESENTATIVE: APPENDIX A Pennsylvania Street Improvement As described by the Project plans and Contract Documents including, but not limited to: Construction and reconstruction of Pennsylvania Street from 103rd Street to 131 ~. Street. Portions of the project is in place and the rest are on new location warranting new construction. This project includes earth work, paving, traffic signals, signage, maintenance of traffic, and other incidental work as described more fully by these construction documents. Cosmopolitan Consulting Engineers, Inc. 1040 East 86~. Street, Suite 48A Indianapolis, IN 46240 M. Kate Boyle, PE City Engineer City of Carreel One Civic Square Cannel, IN 46032 A-8 August 12, 1998 James H. Trotter Sr. Trotter Construction Co., Inc. 5851 East 341h Street Indianapolis, Indiana 46205 Thomas M. Grady Grady Brothers, Inc. P.O. Box 421519 Indianapolis, Indiana 46242 "Mr. Trotter and Mr. Grady: On July 22, 1998, the Board of Public Works and Safety approved a contract to do business with your companies for the Pennsylvania Street Improvements Project. Enclosed is a copy of the signed agreement. Please review the enclosed sample invoice. You do not need to use this specific form, but we do require that you submit all information requested on the sample in a similar layout. This format replaces any other form previously used by the City and is effective upon approval of your contract. Please call Clerk-Treasurer Diana Cordray at 571-2414 if you have any questions. We look forward to working with you. Sincerely, Rebecca L. Martin Deputy Clerk ce: file, dept ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2400 PROJECT COST SHEET o4/~4/2o0o Project Name: Pennsylvania St. Contractor: Trotter Construction Contract No.: 0722.98.01 Original Contract Award Amount: $3,457,744,48 CHANGE ORDERS $3,457,744.48 No. Date Amount 1 11/24/1999 $495,652.57 Total Project Cost Estimate as of 4113100 $3,953,397.05 City of Camtel ....=..::=.:.....:= Department of Engineering May 11, 2000 City of Carmel DEPARTMENT OF ENGINEERING Board of Public Works and Safety One Civic Square Carmel, IN 46032 Dear Board Members: On April 5% 2000 the Board of Public Works and Safety granted me the authority to approve change orders for certain projects, with a maximum limit of 5% of the project cost. This authority was granted with the understanding that I would then bring foah these change orders to gain the Boards concurrence of approval on a monthly basis. With this approval, I was granted the authority to approve change orders up to $172,887.22 on the Pennsylvania Street Improvements project. In accordance with the Board' s decision on this matter, I hereby submit Change Order number 2 for the Peunsylvania Street Improvements project. These changes increase the project cost by $57,628, resulting in a new total contract price of $4,011,025.39. The majority of this cost is due to additional sanitary sewer work required to avoid private laterals from being in the City' s public right of way. The remaining changes are due to minor modifications required due to unforeseen construction difficulties. Therefore, I ask that the Board concur with my approval of this change order as described above. Sincerely, M Kate Weese, P.E. City Engineer ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441 You are directed to make the follo%'in~- chan~es in this Contract: (Brief Description) ' ~ SCHEDULED ADJUSTMENT 11. Tl-~e following referenced Documents fur~her desGibe the changes outlined in Paragaph l, and m*e to be considered a part of this Change Order: R.F,P-: _ W.D.C. No,: _ Other:. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price p~ior to this Cban~e Order $~~ 7. D~' Contract Price will be~decreased by this Change Order $ 5 '7 , to '8.14 New Contract Price including this Chan~e Order $_~ I I , Q2_af_. 3 Contract Time Prior to this Chan~e Order I Da's 11/~_7~ Completion Date Net increased/decreased resultin_Zh'om thish an e Cird ; ¢_ Days Current Contract Time includinjthis Change Or~er~/.,t Days ~ Completion Date This Change Order is for full and final scalemerit of all direct, indirect, impact costs and time extensions incurred at any time resulting from the peffom~ance of the changed work. The Above Changes Are econnnended ENG12ND!ER Address City/State/Zip Date:_,~c,L 25'> 2,000 The Above Changes ,~-e AcCepted: CONTRACTOR A,~,ddress Cky/S ~aa/Zip Date: April 21,2000 Mrs. Kate Weese, P. E. City of Carmel One Civic Square Carmel, IN 46032 RE: Pennsylvania Street Improvements Project # 9%04 Change Order No. 2 Dear Kate: This Change Order for the above referenced project is necessary to compensate for changes due to design errors and omissions in reference to the existing draina e at Delta and at the north end of the Del-Mar property. This Change Order also includes the additional sanitary improvements. The Delta drainage proposal involv~ lhc del~tion of some quantities of Item# 5, Pipe Removal and Item# 3 Catch Basin Removal while adding quantities to Item# 57, Inlet E-7 and Item# 60, Adjust Casting to Grade. There will also be two new items called Itemfi, ! 17, Reset Existing CMP and Drain for Delta Drainage and Item# 118, 18 IN. HDPE Pipe to be utilized in the work to relieve the Delta parking lot drainage. For the Del-Mar property drainage work there will be an additional uantity of Item# 38, 15 inch RCP and a new Item# 119, 18" Metal End Section to extend existing flrainage under road to west side of Penn. Street. There will also be a new item, # 116 C-4 Drop Manhole. This new manhole will replace the Item# 63 Sanitary Manhole, C-4 because the standard C-4 manhole will not work with the existing pipe elevations that were to be connected to it. Also included in this Change Order is the cost of the additional sanitary' work for Penn Mark Plaza and Meridian Mark Plaza, which will be Item# 120. Please find herein a Change Order item list which includes the new items which were generated (followed by *) as well as the existing items with the adjusted quantities and total price extEn~Zy?is,.i You will also find all of the supporting documentation for these changes. These changes es , a new contract amount of$4,011,025.39, a net increase of $57,628.34 to the contract. Please feel free to call me or Trent at 780-i555 should you have any questions or need further infonnation on this matter. Sincerely, CrossRoad Engineers, P.C. Lance Stahley, Resident Project Representative cc: File ITEM NO. 3 5 38 57 60 63 116' 117' 118' 119' 120' DESCRIPTION UNIT Catch Basin, Remove EA Pipe, Remove LF Pipe, RCP, 15 IN. LF Inlet, E-7 EA Casting, Adjust To Grade EA Sanitary Manhole, C-4 EA Manhole, C-4, Drop EA Reset Existing CMP for Delta Drainage EA Pipe, Type 2, Circular, 18 IN. LF 18" Metal End Section EA Additional Sanitary Improvements LS * New Item added to Contract UNIT QUANTITY PRICE AMOUNT ~6 60.00 (360.00) -563 11.60 (6,530.80) 32 25.64 820.48 2 793.88 1,587.76 1 235.00 235.00 -1 1,986.52 (1,986.52) 1 3,946.00 3,946.00 4 400.00 1,600.00 320 19.00 6,080.00 I 236.42 236.42 1 52,000.00 52,000.00 TOTAL 57,628.34 CITY OF CARVEEL TO: WORK DIRECTIVE CHANGE NO. DATE: ,7',4~VA-~.~/t'/2 ,~ PROJECT NAME: 5~6R, a5. ,5'~:. IItFiIAS?'~t-TUI~E PROJECT NO.: fq-,O}l Specification Reference Drawing Reference: DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CIrLA_NGE: REASON FOR THIS ORDER: '7",~,'s. e-~,~t~' AUTHORIZATI 0N: THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS OUTLINED. A Contract Change Order in the mmouat of S $t t) ~//t' O0 will be issued to you in the near future to cover this Work Directlye Change. PROJECT COMPLETION DATE: ADD/DEDUCTfU.T CHANGEgt} ~Z5 DAYS. ATTEST:/~-~1, >f~ 2 Diana L. Cordray~a~r Date: Approved By: CITY OF CAPdMEL BOARD OF PUBLIC ~es Brainaid, Mayor By: ' Billj:,~'Llker, Member DATE: a:xPermT.dcc Construction, Inc. 5851 E. 34th Street, Indianapolis, Indiana 46218 Phone: (317) 543-0053 Fax: (317) 543-3115 CHANGE ORDER FOR.I~{ From: TroUgr ConsU~clion Company 5851 ~ast 34TH S~et Indpls. IN 46218 Date: Job#: Work Order #: Item# Description Quantity ~'/ ~,~ e sty./o o / Unit Price Amount Work Authorized By: Supervisor/Superintendent: Inspector: Company Official: TOTAL COST: Underground Utility Construction · Storm & SanltaW Sewera · Wiltsdines · Cuff & SIdewalk · * MBE CERTIFIED · EQUAL OPPORTUNITY EMPLOYER '* Construction, Inc. 5851 F_ 34th Street, Indianapolis, Indiana 46218 Phone: (317) 543-0053 Fax: (317) 543-3115 CHANGE ORDER FORM From: Tro~cr Consln~tion Company 5851 East 34TH SI~c~ Indpls. IN 46218 Work Order #: C- t~ - ~ To: ~_p~;~iT_c~/~,~ A~. City\Sf~Zip: ~T~D~sc~Ption _U_~__~Pricc Amount TOTAL COST: Work Authodzsd By: Supervisor/Superintendent: I~spcctor: ~/ )~~ Company Official: ~ Underground Utility ConsmJctlon · Storm & Sanitary Sewers · Waterlines · Curb & Sidewalk "MBE CERT1RED · EQUAL OPPORTUNITY EMPLOYER" T0: CITY OF CARMEL WORK DIRECTIVE CHANGE NO. Co DATE: ~v2d 2 ,B 2GOF~ PROJECT NAjxlE: p ~j~j 5V LI/ PrM[ ~ PROJECT N0.: cj q _ 0 q Specification Reference Drawing Reference: DESCKIPTION OF WORK COXrEED BY THIS DIRECTIVE CHANGE: 70/50. 4'L~r ~d~,'l-,'ou,~L..~,q-to/rtt-R,/r,,dO~_~ P'~f (2i~,,~pii E~4r~l~ae~_p_~e,.~~ EASON FOR THIS O~ER: AUTHO~ZATION: THIS WO~ DIECTIVE C~NGE AUTH0~ZES THE W0~ T0 BE COMPLETED AS OUTL~ED. A Contact Ch~ge Order in the inmost of $ 52, ~, ~ will be issued to you in the ne~ ~e to cover ~s Work Direolive Ch~ge. PROECT COMPLETION DATE: ~D~EDUCT~ ~ DAYS. Owner's Repres~ d~ ~o~ '~"'~ ~' E,v,~,,v~,,~s_I 7,{3, ATTEST:/~CyfT~ · . ' Diana L. Cordra~er Approved By: CITY OF CARMEL BOARD OF PUBLIC ~s Brainard, Mayor By: B~-A/m!~' ~;)fLM__ember Billy~Member DATE: /5 - / ? - ~,c~ Date: March 20, 2000 Mr. Jeff Waters Trotter Construction, Inc. 5851 E. 34th Street Indianapolis, Indiana 46218 RE: Pennsylvania Street Sanitary Sewer @ 116th Street Dear Jeff, At the request of the City of Carmel, I am writing this letter to you in response to your fee proposal for the sanitary sewer construction near the intersection of 1 l 6th Street and Pennsylvania Street for the above referenced project. As you know, this work shall be covered under a change order for this project. We have discussed this proposal with the City of Carmel and everyone understands the challenges of this proposed work. However, the City of Carmel has already appropriated funds for this work based on the Engineer's estimate, which is approximately $ 45,000. Understanding that this amount may indeed be insufficient, the City of Carmel is hereby requesting that the work be performed for a lump sum fee of $ 52,000. After consulting with the Carmel Utility Department and reviewing previous construction costs for similar types of work. the City of Carmel believes this to be a fair amount. If this amount is not agreeable, the City of Carmel hereby requests that this work be performed on a Time & Material basis. In this case, all labor rates, equipment rates, labor hours, equipment hours, material costs, subcontractor costs, and overhead mark-ups shall be submitted to CrossRoad Engineers fi3r approval. We understand the urgency of resolving these negotiations and can assure you a prompt Notice to Proceed should the terms described herein be agreeable. Should you have any questions, please page me at 541-6980. Sincerely, CrossRoad Engineers, P.C. Trent E. Newport, P.E., L.S. Project Manager 3417 South Sherman Dr. · Beech Grove, IN 46107 · Tel 317ETBO ,1555 · Fax 317mTBOEESE5 Construction, Inc. 5851 E. 34th Street, Indianapolis, Indiana 46218 Phone: (317) 543-0053 Fax: (317) 543-3115 CHANGE ORDER FORM From: Trotter Construction Company 5851 East 34TIt Street Indpls. II'4 46218 Date: 3-15-00 .l'ob#: 97-04 WorkOrder/f: PENNSYLVANIA STREET SANITARY SEWER IMPROVEMENTS PER PAUL I. CRIPE DRAWINGS 2-29-00 To: LANCE STAHLEY Ad~: CROSSROADS ENGINEERS ~l~St~ip: PENNSYLVANIA STREET IMPROVEMENTS It=m# D~scriution Ouantitv Unit Price Amount 1) Install new 10" PVC Sanitary Sewer across PPnn~yl. vania Street at Penn Mark Plaza from M.H. # MC-18 to M.H. #3-PM L Lump Sum $2S,32S.33 2) Install new 12" PVC Sanitary Sewer Street at Meridian Mark Plaza from M.H; #IMM. Lump Sum = $26,474.02 3) Existing M.H. rehabilitation 4 Plaza, 3 each at Meridian Mark Plaza, Lump Sum = Work Authorized By: $G,4G1.63 Supervisor/Superintendent: Zmp~ctor: Compan~ Official: across Pennsylvania M.H. #MC19-B to each at Penn Mark Underground Ullllty Construction Storm & SanimP/Sewers Waterlines · Curb & SIdewalk "MBE CERTIFIED · EQUAL OPPORTUNITY EMPLOYER" 5851 EL 341h Street. Indlanapoh, Ineiana 4621e Phone: (317) S43-0053 Fix: (317) 5434115 FAX COVER SHEET 5851 F,. ~h. Srre~ IndhnapoSs, ~N, 4~218 !~one~ (317) .S43-~053 Fax: (317) 543-R15 Numb~ o( pages including covet sheet: ClmfidimtiaHl~ Netjet Tlw densmalts a:x:mqm~..in~ this ~x i~ ~a ~ ~ ~1 i.f~i~, ~ ido~ ~ t~ ~ ~ ~n~ dism~m. ~ s~ ~ng d~' ~aion in rdi~ o:, the c~ of this t~ m ~ ~ ~ ~ :o s~F ~ ~ I~ ~ ~,(s)_ ~nk y~ Tx~,~ WateTtine$ * C4~ ;c Sldeeaik