Loading...
Jones & Henry Engrs/Engr ..l Jones & Henry Engineers, Ltd. 2420 N. COLISEUM BLV~. SU1T~ 214, FORT WAYlIE, llq 46805 * 219/482-1920 FAX · 219/484-7210 February 15, 2002 Mr. John Duffy Utility Manager City of Carmel One Civic Square Carmel, 1N 46032 Subject: Letter Agreement Amendment 1-02 to Engineering Service Agreement Dear Mr. Duffy: The Engineering Service Agreement dated November 3, 1999 is amended as follows: Jones & Henry Engineers, Ltd., will provide the following engineering services to the City of Carmel in connection with the design and construction of water transmission mains. 2. 3. 4. 5. Prepare drawings and specifications for approximately 9,400 If of 12-in. water main along 141't Street. Prepare drawings and specifications for approximately 15,200 lfof20-in. water transmission mains from 146th Street to Hamilton Western Utilities booster pump station, Design improvements to Hamilton Western Utilities booster pump station to increase capacity. Design a meter vault at Springmill and 146m Street to meter water from or to the Town of Westfield's water distribution system. Assist the OWNER during bidding and construction of the above projects. The OWNER shall pay the ENGINEER for the services listed above in accordance with Appendix A of the Engineering Service Agreement dated November 3, 1999. The total cost will not exceed $170,000 without prior notification. The above Scope of Services and Cost of Services are agreed to by: CONSULTING ENGINEERS d l Jones & Henry Engineers, Ltd. 2420 N. COIaSEUM BLVD. SUITE 214, FORT WAYNE, DI 46805 * 219/482-1920 FAX · 219/484-7210 FebmaW 15, 2002 Mr. John Duffy Utility Manager City of Camel One Civic Square Carmel, 1N 46032 Subject2 Letter Agreement Amendment 3-02 to Engineering Service Agreement Dear Mr. Duffy: Jones & Henry Engineers, Ltd., will provide the following additional engineering services to the City of Carmel in connection with Emerson Road Sewer Rehab Project. Estimate the construction costs for pipe bursting versus lining the main sewer and laterals on Emerson Road, York Drive and Park Lane. Prepare specification and bid documents for either pipe bursting or lining the sewer mains and laterals. The OWNER shall pay the ENGINEER for the services listed above in accordance with Appendix A of the Engineering Service Agreement dated November 3, 1999. The total cost will not exceed $18,000 without prior notification. The above Scope of Services and Cost of Services are agreed to by: JO , ~NG ~LTD. Ier CITY OF CARMEL, INDIANA /~ility Manager CONSULTING ENGINEERS m l Jones & Henry Engineers, Ltd. 2420 N. COLISEUM BLVD. SUrrE 214, FORT WAYNE, ]~ 46805 · 219/482-1920 FAX · 219/484-7210 February 15, 2002 Mr. John Duffy Utility Manager City of Carmel One Civic Square Carreel, IN 46032 Su~e~: Letter Agreement Amendment 2-02 to Engineering Service Agreement De~Mr. Duffy: The Engineering Service Agreement dated November 3, 1999 is amended as follows: Jones & Henry Engineers, Ltd., will provide the following engineering services to the City of Carmel in connection with the design and construction of an elevated water storage tank. Develop a conceptual design of a 2 MG composite elevated water storage tank showing interior and exterior architectural features. Develop drawings and specifications suitable for bidding the construction of the elevated water tank. Assist the OWNER during bidding and construction. Provide periodic specialty inspection services by Dixon Engineers. The OWNER shall pay the ENGINEER for the services listed above in accordance with Appendix A of the Engineering Service Agreement dated November 3, 1999. The total cost will not exceed $100,000 without prior notification. The above Scope of Services and Cost of Services are agreed to by: CITY OF CARMEL, INDIANA J~ity Manager CONSULTING ENGINEERS