CC-07-01-98-02 Gray Rd Bridge SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR SHARING OF COSTS OF CONSTRUCTION OF BRIDGE 139 FOR GRAY ROAD OVER COOL CREEK BETWEEN THE CITY OF CARMEL, INDIANA AND HAMILTON COUNTY, INDIANA This Agreement is entered into as Supplemental Agreement No. 1 to that certain Agreement executed by the City of Carmel, Indiana, by and through its Board of Public Works and Safety (the "City") on April 19, 1995, and by Hamilton County, Indiana (the "County") on April 10, 1995 (the "Interlocal Agreement"). WITNESSETH THAT: WHEREAS, County is responsible for the construction, reconstruction and maintenance of bridges within the boundaries of Hamilion County, Indiana; and WHEREAS, Bridge 139, which provides for Gray Road to cross Cool Creek, is within the municipal limits of the City; and WHEREAS, City and County entered into the Interlocal Agreement in order to equitably share the costs of constructing certain improvements to Bridge 139 (the "Project"); and WHEREAS, subsequent to the execution of the Interlocal Agreement, the estimated construction costs and repairs needed to complete the Project have increased and the improvements to Bridge 139 desired by City have been modified; and WHEREAS, County will prepare plans and specifications for the reconstruction of Bridge 139 at an estimated Project cost of Two Hundred Forty-Two Thousand Four Hundred Seventy- Five Dollars ($242,475.00), as set forth in attached F. xhibit A; and [ell:ms~,ont:a:'~ffidge139~ult~l .doc:6/26/91] 1 WHEREAS, the City is now desirous of providing certain improvements to Bridge 139 which will increase the costs of the construction and reconstruction of same, including, but not limited to, constructing a sidewalk and performing other improvements on the east side of Bridgo 139, which improvements are estimated, after certain cost adjustments are made, to increase the overall cost of the Project by an additional Two Hundred Fifty-Two Thousand Two Hundred Seventy-Five Dollars ($252,275.00), for a total Project cost of Four Hundred Ninety-Four Thousand Seven Hundred Fifty Dollars ($494,750.00), as reflected in attached Exhibit B; and WHEREAS, it is in the best interest of the taxpayers of the County and City that such improvements desired by Cit9 be included in the Project; and WHEREAS, the parties are desirous of entering into this Supplemental Agreement No. 1 in order to equitably share the revised costs of the Project; and WHEREAS, Indiana Code 36-1-7 permits interlocal agreements between governmental entities. NOW, THEREFORE, City and County hereby agree to amend the Interlocal Agreement with this Supplemental Agreement No. 1, as follows: 1. The foregoing recitals are hereby incorporated herein as if they were specifically set forth herein. 2. Based upon the estimated increased costs of reconstructing Bridge 139 pursuant to County' s plans and specifications and of providing the improvements to Bridge 139 now .requested by City, the parties agree that all costs for the Project shall be shared, with forty-nine percent (49%) to be paid by County and fifty-one percent (51%) to be paid by City. County shall inform City of the amount of the bids and keep City advised of the cost of all change orders or additional costs for the Project. [eb:m.lv, mrd:c:~im.a.locmSrcanems~beidSe139svp~ll .dm::glO~$] 2 3. County shall maintain records of all costs incurred for the Project and shall periodically provide to City reports of all such costs. 4. City shall seek an appropriation of its share of the costs of the Project and shall transfer its share of the costs of the Project, including contingency, within ten (10) days of the date bids for the Project are received by County. 5. The amount paid by City for the Project shall be held in a segregated line item dedicated solely to the costs of the Project. Any amount remaining in such account at the conclusion of the Project shall be refunded to City. 6. All provisions of and attachments to the Interlocal Agreement in force on the effective date of this Amendment No. 1 and not in conflict herewith shall apply hereto and remain in full force and effect. 7. This Amendment No. 1 shall be effective as of the date on which it is last executed by a party hereto. IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 1 as follows: BOARD OF COMMISSIONERS OF HAMILTON COUNTY ATTEST: Date: Auditor [eb:mswe~:a:%bfk!:teil~sapp;I .(~oc:~d/H] 3 CITY OF CAKMEL, INDIANA BY AND THROUGH ITS BOARD OF PUBLI ,WOES AND SAFETY J nard, Pr n fficer Mary ~Burke, Member D~t~: 7- /-' ?'8' ATTEST: Diana L. Cordray, , Treasurer [cl):msw(H'd:a:V~ll'k~el)gmlpl3W|.do~:(l/"Z~dgl] 4 06/26/98 13:47 FAX HAMILTON CO HTY. ~002 '- Estimate of Cost Gray Road over Cool Creek Hamilton County Bridge #139 Alternate D Bridge Reconstruction with Deck Replacement and Concrete Railing Replacement I. E~cimated Cons~ruCtion cost II- Professional Services A. Sur~ey B. Design C. Permi= Applications D. Intermittent Construction Inspection E. Right-of-Way:Engineering ~ Estimate 1 Parcel @ $400 P. Right-of-Way Services Market Estimate and Negotiation Estimate I Parcel @ $1,800 G. Title Insurance Estimate I Parcel W $375 H. Right-of-Way Staking Estimate I Parcel @ 9500 'III. Cost of Land and Improvements IV. Utility Relocation TOTAL $218,000 1,500 12,900 500 3,500 400 1,800 375 500 3,000 $242,475 ~".k HI,&/T A 06/26/98 13:49 ~A~ILTBN CO IIWY. ~005 Estimate of Cost Gray Road over Cool Creek Hamilton County Bridge #139 Alternate E Bridge Reconstruction with Deck Replacement and Concrete Railing Replacement Bridge Widening with Sidewalk on Both Sides Approach Grading Extends 350' South of Bridge and 500' North of Bridge I- Estimated Construction Cost II. Professional Services A..._Survey B.. Design C. Permit Applications D. Intermittent Construction Inspection E. Right-of-Way Engineering Estimate 2 Parcels 0 $400 each F. Right-of-Way Services Market Estimate and Negotiation Estimate 1 Parcel @ $1,600 Estimate 1 Parcel @ $2,400 G. Title Insurance Estimate 2 Parcels 0 $375 H. Right-of-Way Staking Estimate 2 Parcels @ $500 III. Cost of Land and Improvements IV. Utility Relocation Cost TOTAL $408,000 2,500 39,200 2,000 8,500 800 750 1,000 28,000 0 $494,750 · City Carme'_ su~y 2, ~99s Michael A. Howard, Esq. 694 Logan Street P. O. Box 309 Noblesville, IN 46060 Mr. Howard: On July 1, 1998, the Carmel Board of Public Works and Safety approved an agreement for sharing costs with Hamilton County for construction of Bridge 139 for Gray Road over Cool Creek. Included is the document signed by the board members. Once the agreement is signed by the Hamilton County Board of Commissioners, please retum the agreement to the Clerk Treasurer' s Office, Attention Rebecca Martin, One Civic Square, Carmel, Indiana 46032. If you have any questions, please contact the Clerk-Treasurer's Office at 571-2414. Rebecca L. Martin Deputy Clerk cc~, Doug, engr ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2400 I hereby certify that I am the keeper of, and that the following, consisting of 2 pages is a true and complete c py of the Right oftintry passed by the Carmel Board of Pubhc Works on September 23 1998 W~tness my hand and official seal this 23'd day o er 1998 · ' . : . , . _ X rer, IAMC Parcel: 2 Code: :JI~OHT OF ~ (BAR~ :LAND ONLY) WHEREA~, Han~lton Coun~:y of the S~_ate of Zndiana is contemplating constr~ction work on Count. y ~ridge #139, wh&ch ,dill require acquisition of right-of-way across certain Lands of the undersigned in Hamilton County, Indiana ~ AND WHEREAS, it is desirable that such construction be commenced as rapidly as possible, but that certain questions have arisen during the negotiations between the Hamklton County and the undersigned which will require additional consideration by both parties, and is desired =hat the said questions be resolved before further negotiations are had, but tha~ it is desirable that the constructLot of the bridge project known as Bridge #139 not be delayed. NOW THEREFORE, be it agreed by and between ~he undersigned and the Hamilton County that for and in consideration of the temporary foregoing of the exercise of the right of eminent domain by Hamilton County and the benefits that ma~ be derived by both parties by an extended period in which to resolve questions and contin'~e negotiations, that the undersigned does hereby gran~ a right of entry on an.d across its lands affected by the above project which are more particularly .described in a deed designating required right-of- way referred to as parcel 2 and 3 which proposed deed and description are by reference incorporated hereira and made a par~ hereof. That this right of entry shall permit Hamilton County through its employees, agents, and contractors to proceed with the construcZion of the bridge and to do such acts tl~ereon as would be permitted, if the right-of-way had actually been obtained. 'Tha~ ~he undersigned waives no right to make claim for any damages or any acts which are outside the right-of-way limits and which would normally be ~he basis for an act. ion for damages. Neither par~y hereto waives any rights in the event negotiation fails and it is necessary that ~he property be condemned. CITY OF CARMEL by and through its Board ~of P~~~d Safety ..... ~~e, Member Sta=e of I N D I A N A ) ) sen his hand and seal Bil~~al~k~r,r'/~'Member ATT~ / . ~ Diana Cordray, , erk-Treasurer My Commission expires My County of residence is ~'_J//~n ~ ~ Before me, a NoraEy Public in and for said County and S~ate personally e . , . Nonary P~lic (Sl~na=ur ~ :.~ '," ~ "'~'~ ~ .... : ~- .< : Nu=ary ~1~ ( Printed Name ). ~"' · ~ .... .' ' This instrument was prepared by BEAM, LONGEST AND NEFF, L.L.C. I hereby certify that I am the keeper of, and that the foregoing, consisting of 2 pages, is a true and complete copy of the Right of Entry passed by the Carreel Board of Public Works on September 23, 1998. Witness my hand and official seal this 2Yd day of ~.. , . . .... Diana L Curdray CYnic IAMC