Loading...
Sewer Reimburse/Springmill Prop sEWER REIMBURSEMENT AGREEMENT BETWEEN THE CITY OF CARMEL, INDIANA AND SPRINGMILL PROPERTIES This Agreement entered between the City of Carmel, Indiana (hereinafter "Carmel") and Springmill Properties, an Indiana partnership (hereinafter "Springmill") witness: · WHEREAS, Carmel ~has duly adopted and enacted Ordinance S-41 (January 4, 1982) that provides~ in part for the reimbursement f~om the "interceptor fund" by Car~el of private funds expended to extend ,the trunk sewerage ~ystem and such ordinance further provides the method of reimbursement (Section 7.02) and, WHEREAS, Springmill desires to extend a portion of the trunk sewerage system as follows: Beginning a,t the sewage pump station which is· located at the intersection of Meridian Street and the proposed extension of 126th Street, the 6 inch force main follows the West side of Meridian Street (approximately 35 feet West of ~he center- line of Old U.S. 31 within its 50 foot half Right of Way) Northeasterly for a distance of 2165 feet to a manhole which is the Southerly terminus of a 12 inch diameter gravity sewer. The said gravity sewer continues Northeasterly along the West side of Meridian Street, under 131st'Street and con- tinuing along the West side of Meridian Street (about 24 feet West of the centerline of Old U.S. 31 within its 50 foot Half Right of Way) fora distance of.2800 feet to the Southerly terminus of the St. Vincent sewer, said point being opposite the South property line .of the St. Vincent property extended to Meridian Street. WHEREAS, Springmill desires to receive refunding of reimbursable monies expended pursuant to ordinance S-41 (January 4, 1982). Now therefore, the parties agree as follows: behalf of Carmel the trunk sewer, follows: 1. This written agreement entered prior to the commencement of construction is entere~ by the parties pur'suant~ to Ordinance S-41, Section 7~.02 (Januar~ 4', 1982). 2. Spr~ngmill shall advance thee sum ~o~ $179,709.24 ~o or on to pay for the construction of the extension of the complete description of the' project is as Beginning at the sewage pump station which is ~ocated at the intersection of Meridian Street ~. and the proposed extension of 126th Street, th~ 6 inch force main.follows the West side of Meridian Street (approximately 35 feet West of the center- .... line of. Old U.S. 31 within its 50 foot half. Right ~ of Way) Northeasterly for a distance of 2165 feet to a manh91e which is the Southerly terminus of a 12 inch diameter gravity sewer. The said graVity se~er,continues NOrtheasterly along the West sid9 of Meridian Street, under 131st Street and con- tinuing along the West side,of Meridian Street (about 24 feet West of the centerline of Old U.S. 31 within its 50 foot Half Right of Way) fQr a distance of 2800 feet to the Southerly terminus 'Of the St. Vincent sewer, said point being Opposite.the South p~operty line of the St. Vincent property extended to Mer~dia~ Street. 3. Carmel determines such ex~enditure to be necessary to provide sewerage to adjacent real estate and to meet the require- ments of Carmel. 4. Carmel and Springmill agree that springmill shall be entitled to reimbursement of the sum of $179,709.24 from the "interceptor fund" established by a~reage availability charges assessed by the Ordinance (the present amount of $700.00 per acre). 5. Carmel's obligation shall be to repay funds from those deposited in the "interceptor fund" 9nly and Carmel does not incur any liability for repayment other than to pay from funds deposited in the "interceptor fund". 6. 'Payment from the "interceptor fund" Go Spri~gmill shall be~in the amount agreed by the parties to this Agreement and shall occur' quarterly. Payments'to .Springmill shall be prior to any payments from the "interceptor fund" made to any 'other persons ent~ing similar agreements subsequent to the date of this Agreement (referenced in the Ordinance as payment on the basis of first in, first out). on Georg Sprin IN WITNESS WHEREOF the parties have executed ~his Agreement the date first above written. ~~,~ / ~ . City of Carmel, Indiana t~'9~, general partner ' llVPr°perties ~~~~,.'.. ~,/~il ly~Wal ks r, memb'e r Board of Public Works 3 CITY OF CARMEL JANE REIMAN, May~)r OFFICE OF THE CITY ENGINEER March 16, 1984 Memo to: Mayor Reiman From: Tom Welch, City Engineer , , ~ subject: Reimbursement of ~prinffm~ ?. ewer Mayor Reiman, I have reviewed the documentation'submitted by Cripe Engineering for reimbursement. I found everything to be in order. I feel the proposal price on the actual sewer is a very good one. Our office ran a cost estimate on the sewer and lift and Central Engineering's proposal is nine thousand dollars less than our estimate. Sincerely, Tom Welch City Engineer TW'/tlc 11 1st AVENUE N.E. CARMEL, INDIANA 46O32 THOMAS E. WELCH 7172 Graham Road Indianapolis, Indiana 46250 (317) 842-6777 Land Development Engineers/Land Surveyors/Architects/Land Planners - TO: City Engineers Office CitS Of Carmel, Indiana ATTENTION: Mr. Tom Welch WE ARE SENDING YOU [] Shop drawings [] Copy of letter L rTER OFOTRANSMITTAL DATE3_6_84 IPICJOBNO79205-?O000 Springmill Properties 0ffsite Sanitary Sewer ~] Attached [] via [] Prints [] Plans [] Samples [] Change order [~ CoDie~ ~of bids COPIES DATE DESCRIPTION I Jan. 23 Bid Proposal - Sweeney Construction Corp. I Jan. 25 Bid Proposal - Gradex I Jan. 30 Bid Proposal - Central Engineering & Construction Co. the following items: [] Specifications THESE ARE TRANSMITTED es checked below: [] For approval ~3 For your u~e ~] As requested [] For review end comment [] FOR BIDS DUE [] Approved as submitted [] Approved as noted [] Returned for corrections 19 [] Resubmit r-1 Submit [~] Return copies for approval copies for distribution corrected prints [] PRINTS RETURNED AFTER LOAN TO US REMARKS: COPY TO: George Sweet SIGNED: IF ENCLOSURES ARE NOT AS NOTED, K N)LY NOTIFY US AT ONCE L January 30, 1984 Spring Mill Properties c/o Paul I. Cripe, Inc. 7172 Graham Road Indianapolis, Indiana 46250 Re: Offsite Sanitary Sewer Gentlemen: We are pleased to make the following quotation for the construction of the offsite sanitary sewer to serve Spring Mill Properties. 1) We will install the gravity portion of the sewers. Lump Sum ..... '- - $65,240.00 2) We will install the force main and the lift station. Lump Sum ....... $83,385.00 /~S ~. Om All work is to be done in accordance with the plans prepared bY Paul I. Cripe, Inc. entitled "Construction Plans for Off-site Sanitary Sewer Springmill Properties;" sheets 1 through 9 in- clusive; dated 11-7-83, 11-25-83, 11-28-83 and revised 11-23-83. This quotation includes the cost of the necessary insurance and bonds. This quotation does not include the cost of moving any utilities that may be encountered. Very truly yours, CENTRAL ENGINEERING & CONSTRUCTION CORP. D. A. Horth DAH:k Sweeney C.onstruction 1030 East 19th Street Indianapolis, Indiana 46202 Phone 317-926-3416 j~nuary 23, 1~84 Corp. Paul I. Cripe, Inc. 7172 Graham Road Indianapolis IN 46250 Attn: Mr. Joseph A. Sharp Springmill Properties-affsi:e sanitary sewer & force main Carmel IN Dear Sir: We propose to furnlsh the necessary laoor, materials and equipment to complete the following work as shown on plans and specifications dated 11-7-63, prepared by Paul I. Cripe, Inc. DFF-SITE SANITARY SEWER 1. Excavate, furnish and install approx. 2765'-12" vit. pipe and backfill for the off-site sanitary sewer. Granular back~ill under all pavement.. 2. 8wild eight (8) precsst concrete manholes including cast iron frames and covers, 3.' Repair pavement st drives and streets. 4. Finish 9rads and reseed all disturbed grass areas. 5. Furnish barricades an~ ~raffic control as necessary. 8. Furnish CitV of Carmel and Hamilton County street cut permits. LIFT STATION ~ VALVE PIT 1. Excavate an~ backfill for the lift station and valve pit. 2. Build B'~ precss~ concrete lift station complete, inclu~ing p~mps, piping, radio unit, electrical equipment, valves and ve~ve pit as shown on plan sheets 6, ? end ~. 3. Build 8" compacted stone drive, ~0 ft. x ~0 ft. Excavate, furnis~ and install approx. 20'-15" vit. pipe and back- fill for future sanitary sewer connection. FDRCE MAIN 1. Excavate, furnish and install abprox. 21~D'-6" DI class II pipe and backfill for the sanitary force main. Granular backfill under all paved areas. 2. Furnish end install required fittings end concrete thrust blocks. "We Dig Indianapolie" Sweeney Construction Corp. Repair psvemsnt at drives end streets. 4. Finish grads and reseed ail distur~eO grass arsas. 5. Furnish ~arricsdss es necesssry. 6. Fwrnish City of Carmel sad Hamilton Cownty street cwt permits. For the sum of: ~ i48,643.00. REG/mg Robert E. Gengstad II, P.E. "We Dig Indianapolis" . ,., ..:.. :. :-'....~ ' :'. ?'.". . 7 ...? . '-.' . . ~ ':"7~ .~:.'..;:j'"... ' ' -, . , Januar2 .25, ~98 , '.'-,:.- :.. ,_ - ', Joe 'Sharp Paul 3. Cripe-Inc. '7172 Gra~ Road Indianapolis, In 46250 ~'Re:- Spring Mill~Pro~erties -' '-' Offsite sanitary sewer" ' Dear Mr. Sharp: ....... 'This will confirm our quot.ation of ~15&~800.00.for the following items .of work: . .. ' ' (1) ~.'.1'6" Yorc-emain sewer. . · -'"'= .... '"(2) . , gravity sewer. r,., · .:'.-. - - ,~3) ,~Lift ~tation complete.' '~ ,~-~' L' ' ' ' ' .(4) · -~All ~estoration per .'plans & specifications._ . .'- ' ' The'f611ow~ng con~itions and exclusion are also'a-part of (1) No&ay~ut included. -. . '~(2) ~Lift'~tation to.be backfilled with natural material. (3) Work to be started after frost is gone from the ground. PAUL I. CRIPE, INC./7i72 Graham Road/Indianapolis, Indiana 46250/[3'17] 842-6777 March 16, 1984 PIC Job #79205-70000 Mr. Tom Welch, City Engineer City of Carmel 11 First Avenue NE Carmel, Indiana 46032 RE: Meridian Corridor Sewer Dear Tom: Please find following a breakdown for professional fees on the above captioned project: Professional Fees to Date:' Office Engineering-630.8 hrs. @ $35.19/hr. $22,200.74 Surveying-77.5 hrs.@ $24.21/hr. 1,876.46 Blueprinting 201.92 Expense Advances 805.11 Subtotal Expenses to Date $25,084.23 Plus - Field Staking during Construction $6,000.00 The above shown hourly rates are calculated average hourly rates including some overtime. The design includes work over several billing rate changes and from major revisions due to review by various parties. Should you have further questions, please let me know. Sincerely, ~ S~h~ r~ JAS/hjl cc: George Sweet Land Development Engineers/Land Surveyors/A~chitects/Land Planners