Loading...
C-201 Demolition and Pre-Const SWPPPN89°44'42"E 304.42' S00°06'04"E 126.23' S89°44'42"W 52.42' S00°06'04"E 142.00' N00°06'04"W 268.23'N00°06'04"W 2645.23'S89°44'42"W 2586.78' S89°44'42"W 252.00' 1st STREET NE E MAIN STREETN RANGELINE ROAD1st AVE NEALLEY J J J TBM#400 TBM#402 TBM#401 J J J J J A A EXISTING UTILITY LEGEND DEMOLITION ANDPRE-CONSTRUCTION SWPPPCONSTRUCTIONNOT FOR-#####2021-10-29CONTACT(YYYY-MM-DD)CONSULTANTTITLE: DRAWING NO.(YYYY-MM-DD)DATEREV.DESCRIPTIONPROJECT:DATETITLE:CERTIFIED BY:CONSULTANTJOB NUMBERSHEET OFTELEPHONE:LAUTH GROUP, INC.PROJECT:CONTACT:PROJECT NUMBER:STATE NUMBER:E-MAIL:FAX:1ST ON MAINOVERALL DEVELOPMENT41 N RANGELINE RD & 10 E MAIN STCARMEL, INDIANA 460321ST ON MAINKEN STROKE317.848.6500317.848.6511kstroke@lauth.net12021.11.19MODIFICATIONS PER CLIENT COMMENTSDEVELOPMENT CONSULTANTSTRANSPORTATION &BEECH GROVE, IN 46107115 N. 17th AVE.(317) 780-1555CROSSROADENGINEERS.COMPRELIMINARY22022.01.21MODIFICATIONS PER CLIENT AND CITY COMMENTS32022.02.11MODIFICATIONS PER CLIENT AND CITY COMMENTS42022.03.01MODIFICATIONS PER CARMEL FD COMMENTS52022.03.09MODIFICATIONS PER CARMEL FD COMMENTS62022.03.29MODIFICATIONS PER CITY COMMENTS72022.04.08MODIFICATIONS PER CLIENT AND CITY COMMENTS82022.04.18ADDED MFPG & MLAG GRADES PER CITY COMMENTS92022.05.09MODIFICATIONS PER CLIENT AND CITY COMMENTSEXISTING LEGEND – ‘□’ “” – – ‘□’ – ‘’ “”“” – ‘’“”“” ” – ‘’ ”“” – ‘□’ “”“” – ‘’“ ”“” BENCHMARK INFORMATION FLOODPLAIN INFORMATIONNORTHSECTION A-A TEMPORARY CONSTRUCTION ENTRANCE DETAIL ATTACHING TWO SILT FENCES SILT FENCE DETAIL EROSION CONTROL NOTES DEMOLITION NOTES DEMOLITION LEGEND SILTSACK INLET FILTER DETAIL ® C-201 DEMOLITION AND PRE-CONSTRUCTION SWPPP