Loading...
Eagle Ridge Addl Serv/ENG/$17,000-Auman/Newark ImprovementsSeptember 1, 2011 Mr. Brock Ridgway, P.E. Eagle Ridge Civil Engineering Services 1321 Laurel Oak Drive Avon, IN 46123 Dear Mr. Ridgway: Additional Service Amendment #1— Sincerely, Michael T. McBride, P. City Engineer JAMES BRAINARD, MAYOR RE: Additional Service Amendment #1, P.O. #25812 As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current contract with USI Consultants, Contract #070710.13 dated July 7, 2010, I have requested and received from you the proposed scope of services and fee estimates for the following work task: Auman and Newark Neighborhood improvements Design; Pleases 2 and 3 See "Attachment A" Not to Exceed: $17,000.00 Per our contract procedural requirements, 1 hereby approve these Additional Professional Services estimates, and request that the Board of Public Works ratify the above referenced Contract Amendment. PLEASE NOTE Please be advised that "Additional Services" performed on City contracts must be billed separately from the original contract and other additional services. More importantly, the invoice must reference the appropriate Additional Service and P.O. shown above. Invoices received without the Additional Service referenced will be returned for proper identification. Thank you for your continued assistance in providing the City of Carmel with your professional, quality services. If you should have any questions, please give me a call. DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineeringncarmel.in.gov Revi ved�s.• approved by: C. Eng eking Director of Administration Eagle Ridge Civil Engineering Services, LLC Engineering 2011 Appropriation #203 4462200; P.D. #21821 Contract Not To Exceed S17,000.00 ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PURCHASE OF GOODS AND SERVICES THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT "Agreement entered into by and between the City of Carmel and Eagle Ridge Civil Engineering Services, LLC (the "Vendor), as City Contract 070710.13 shall amend the terms of the Agreement by adding the additional services to be provided by Vendor consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA by and through its Board of Public Works and Safety By: By: NOT `Preset) James Brainard, Presiding Officer uthorized Sig'atur Date: Lai La. ATTEST: 1 Diana Cordray, IA' C, Clerk- Treasurer Date: l G/ Printed Name Title Date: Dllova,sa Rhos Data A Adounli.AVAthocaProf.SvoL bGad 1i1Ecc Cod Entmwuy Sar- W17 Soo AcwChc:W /ZUI 11:I 1 PM) Eagle Ridge Civil Engineering Services, LLC 4 c. C /21 D6wA 1 14.1.1 46-) '6- Ewf6c FIDJTIN: Z Z ,coo Last Four of SSN if Sole Proprietor: 9/ 1/ 1 11111 "F‘ 4 --41 EAGLE RIDGE CIVIL ENGINEERING SERVICES, LLC David Littlejohn Alternative Transportation Coordinator City of Carmel Dept. of Community Services One Civic Square Carmel, IN 46032 Re: Proposal for Additional Services Auman and Newark Neighborhood Improvements: Phases 2 and 3 Dear David: August 6, 2011 Attached is a draft scope of services and fee estimate for the additional services requested to date on the Auman Newark Phase 2 Project. These changes have been noted in the monthly status reports and in our correspondence and coordination meetings as we have progressed on the project. The three items involved include the following work: 1) Additional Project Area: The expansion of the project area to include Nappanee Drive from Pawnee Road to Oswego Road, and also Oswego Road from Nappanee Road to Ute Drive. This 1,000' addition to the project was designed in addition to the project limits described in the agreement once it was discovered that the pipes in Rangleine Road were deep enough from storm sewers to extend into this area. 2) Stormwater Filtration /Quality Features Design and Permitting: This task was specifically omitted from our original scope in order to reduce the fees and because the City deemed it unlikely it would be needed. We were later directed to add this to the project. 3) Splitting Project into Two Phases: After we had reached 95% completion on the project, the City requested the design be split into two separate biddable projects due to budget limitations. This required revisions to the plan set as prepared, and will require the bidding support activities be conducted two separate times, likely one year apart. These will now be called Phase 2 and Phase 3. Attached is a draft scope of services and the fee estimate computation for your review. If you have any questions, please contact me at the number below. Thank you for this opportunity to continue to serve the City in the Auman Newark Neighborhoods. Sincerely Yours, Brock Ridgway, P.E. Project Manager Exhibit A )(lb 1321 Laurel Oak Drive, Avon, IN 46123 317- 370 -9672 bridgway @eagleridgecivil.com Additional Services Auman Newark Phase 2 Design Services August 2011 GENERAL ATTACHMENT A SCOPE OF ADDITIONAL ENGINEERING SERVICES ENGINEERING FEES SCHEDULE The City of Carmel has requested various changes to the scope of work in the project previously identified as "Auman Newark Phase 2 This project includes drainage and sidewalk improvements along Nappanee Drive, Oswego Road, Winona Drive, and includes a replacement of storm sewer along Range Line Road. These additional services require the completion of new tasks and the extension of others in order to complete the project as directed. The changes are described as follows: 1. ADDITIONAL PROJECT AREA Design and plan development was extended to include the section of Nappanee Drive between Pawnee Road and Oswego Drive, and also Oswego Drive between Nappanee Drive to Ute Drive. This 1,000' section along these two roadways had been previously omitted because it is in lower ground and it was not thought it could be drained to the areas already part of the project. After survey was completed and it was determined that this area can be drained to the west in new storm sewers. Therefore, the area was added to the design and has included all typical design tasks including plan development, storm sewer and sidewalk design, quantity estimating and utility coordination. 2. STORMWATER FILTRATION /QUALITY FEATURES Designer was originally directed to not include services to design and prepare hydraulic computations for stormwater quality filtration structures. These features were not believed to be needed. The City later changed this guidance in response to comments from the Hamilton County Soil and Water Conservation District. Professional completed the required hydraulic analyses, design, and related plan and specification development to incorporate these features into the project. 3. SPLIT INTO TWO PROJECTS FOR BIDDING Due to budgetary reasons, the City has directed that the project now be split into two separate projects or phases, tentatively identified as Phase 2 and Phase 3. Phase 2 shall now be the portions of the project along Rangeline Road and Nappanee Drive. Phase 3 shall be the portions of the work along Oswego Road and Winona Drive. For the Professional, this requires a revision to several plan sheets, the cost estimate, and the preparation of two customized sets of bidding documents. The bidding phase services, which have not yet been completed, must now be performed twice, the second time likely to be in 2012. The Rule 5 permit must be sought twice and published twice, once for each area. The tasks and estimated fees for these additional services are described in greater detail in the attached fee estimate spreadsheet. 4 2 3 EAGLE RIDGE oxxx���� Civil Engineering Services, LLC Civil Engineer Engineer i Technician Expenses Totals TASK Hourly Rate>IL $110 $80 k $60 At Cost !ADDITIONAL PROJECT AREA o' $3 450 Storm Sewer Analysis and Design 4 51,000 Sidewalk Design 4 4 4 $sn $1,050 Plan and Profile Development i 4 $240 Cross Section Development 6 $360 Utility Coordination 2 4 5100 $640 ovnu�and cu�cmmaunm 2 $160 sronMxvxrsn FEATURES -ti $�iou -t--- $40 Coordination and Meeting with City 5 o $440 ��mvnc«na��,�nuoeuon $1,360 Coordination and Meeting with SWCD 4 t gso $aso Permit Application and Revisions 4 $320 nn"|oeuunand unit iden�nouv���mu 8 $640 Operations 12 $yo $yoo .1 2 pxo�aospuT�n�p*xSsSz _i -$��so- Preparation of Separate Title and Inde Sheets 4 $400 Revisions to other Plan Sheets at Termini 1 12 4__ 12 $1,680 Additional Field Check/Utility Coordination Meeting 2 $540 Quantity Computations and Cos Estimate z 5160 Prepare acon��bmdinudmumen� 2 2 1 $160 Publish plans and project manuals 2 $400 $780 Receive solicitations, UPS shipping to bidders 12 i $100 51,420 $660 Prepare and Maintain n�of plan xomeo 6 si- Prepare and publish needed Addenda 3 -I $240 neond*vdeuuesuons Bidders z 2 2 2 6 s $160 Attend Prebid Meeting Prepare Bid Analysis g40 $520 msnvmdmnemuue�mn`(m�ecuunuvo�) 4 $50 $370 ;Prepare m,oui|tsmmss and pon 2 z $zoo Additional Permitting Application Rule 5 n $zoo 51 Coordination Meetings 6 i $100 $000 ;Status xepo��mvoicinn�dmin -I' $220 r- o EAGLE RIDGE oxxx���� Civil Engineering Services, LLC MILESTONE REVISED DATE Phase 2 Advertising August 2011 Phase 2 Bid Opening September 2011 Phase 2 Construction Sept -Nov 2011 Phase 3 Bidding TBD Tentative Spring 2012 Phase 3 Construction TBD Tentative Spring /Summer 2012 Additional Services Auman Newark Phase 2 Design Services August 2011 COMPENSATION These Additional Services are to be conducted on a Hourly basis with an agreed Maximum Cost of $17,000. The overall contract maximum is thus increased to S53,000. REVISED PROJECT SCHEDULE