Loading...
Morphey Construction/ENG/Final Inspection and Recommendation ReportContract: CITY OF CARMEL REPORT OF CONTRACT FINAL INSPECTION AND RECOMMENDATION FOR ACCEPTANCE #2201 - 50080, 2200 - 2000.203 -509. P.O. Project: #25838 INTERSECTION STREET LIGHTING AND SIGNAGE IMPROVEMENTS 11 -10 # Date Construction Substantially Complete: May 30th, 2012 (The date all items were completed, except punch list and removal of traffic control devices.) Intermediate Completion Date: N/A Preliminary Inspection made by: Lance Stahley, CrossRoad Engineers, P.C. # Date Punch List Items Completed: May 30,2012 Sod Maintenance Expired on: n/a # Date Sod Repaired, if necessary: N/A # Date Failed Material Replaced:n /a Final Inspection made by: Lance Stahley, CrossRoad Engineers satisfactory from Station Entire project on May 30, 2012 to Station Date: Mat, 30, 2012 and all work was found to be # Date Construction Signs and Temporary Traffic Control Devices Removed: May 30, 2012 Pavement Smoothness N/A comply with Specifications. Pavement Markings N/A been placed in accordance with the IMUTCD manual or as directed by the District Traffic Engineer. Right -of -Way (is) clear of all encroachments. Date of Last Work May 30, 2012 RECOMMEND ACCEPTANCE Project Representative CrossRoad Engineers, P.C. By: City of Carmel Engineer City of Carmel Engineering Dept. Representative * By: * By: * By: NOT &zi) City of Carmel; Hamilton County LO4 L PUBL _ _ GF4,NCY -c Wa > &n