Loading...
Central Engineering/ENG/Final Inspection and recommendation ReportCITY OF CARMEL REPORT OF CONTRACT FINAL INSPECTION AND RECOMMENDATION FOR ACCEPTANCE Contract: 10- 0610.06 Project: 106th Street Drainage Improvements # Date Construction Substantially Complete: May 15th, 2012 (The date all items were completed, except punch list and removal of traffic control devices.) Intermediate Completion Date: N/A Preliminary Inspection made by: Lance Stahley, CrossRoad Engineers, P.C. # Date Punch List Items Completed: May 30,2012 Sod Maintenance Expired on: n/a # Date Sod Repaired, if necessary: N/A # Date Failed Material Replaced:n /a Final Inspection made by: Lance Stahley, CrossRoad Engineers on May 30, 2012 satisfactory from Station Entire project to Station # Date Construction Signs and Temporary Traffic Control Devices Removed: Pavement Smoothness does comply with Specifications. Date: May 30, 2012 and all work was found to be May 15, 2012 Pavement Markings (have not) been placed in accordance with the IMUTCD manual or as directed by the District Traffic Engineer. Carmel Street Department has been tasked with this responsibility. Right -of -Way (is) clear of all encroachments. Date of Last Work May 30, 2012 D ACCEPTANCE Project Representative %a $ * /h' r is By: * By: * By: * By: City of Carmel Engineer City of Carmel Engineering Dept. Representative City of Carmel, Hamilton County LOC PUBLIC A E /00T Pr-e&IPT �OYI' VV a